• Title/Summary/Keyword: process risk

Search Result 2,872, Processing Time 0.026 seconds

A Study on the Selection of Construction Method by Decision Making Method (의사결정기법을 통한 건축공법선정에 관한 연구)

  • Yang, Keek-Young;Yoon, Yer-Wan
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.1
    • /
    • pp.147-154
    • /
    • 2002
  • In the Past, The selection of individual method of construction was done by head of construction site or an experienced person very frequently. By doing this, The wrong selection of construction method without exact adjudication of construction site situation lead to increasing of cost and extension of construction term. Finally it will effect all over the construction process. Especially, In case of underground construction in the beginning, there are a lot of a variable factor and it also effect on the entire construction process and it need very careful process. The purpose of this study is to present the best suitable methodology for selection of construction method by considering potential risk of construction method and variables together with external condition for underground construction. The purpose of this study Is to select the most suitable construction method by analysing potential conditions(construction site situation and client request in designing ) To do this, We prepared arrangement rule to arrange the conditions for construction method. And thin make checklist of the analyzing construction method. Though above process, To expect the risk of individual construction method using above risk checklist and using Analytic Hierarchy process among Multiple-Criteria Decision making, the professional opinions is to be adapted. By doing this, it can lead and select the most suitable construction method considering the data which get from risk density test.

A Study on the Selection of Underground Construction Method by Risk Analysis (리스크 분석을 통한 지하 구조체 공법 선정에 관한 연구)

  • 윤여완;양극영;홍성휘
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2001.11a
    • /
    • pp.99-117
    • /
    • 2001
  • In the past, The selection of individual method of construction was done by head of construction site or an experienced person very frequently. By doing this, The wrong selection of construction method without exact adjudication of construction site situation lead to increasing of cost and extension of construction term. Finally it will effect all over the construction process. Especially, In case of Underground construction in the beginning, there are a lot of a variable factor and it also effect on the entire construction process and it need rely careful process. The purpose of this study is to present the best suitable methodology fer selection of construction method by considering potential risk of construction method and variables together with external condition for Underground construction. The purpose of this study is to select the most suitable construction method by analysing potential conditions(Construction site situation and Client. Request in designing) To do this, We prepared arrangement rule to arrangement conditions for construction method. And then make Checklist the analyzing construction method. Though above process, To expect the risk of individual construction method using above risk checklist and using Analytic Hierarchy Process among Multiple-Criteria Decision Making, the professional opinions is to be adapted. By doing this, It can lead and select the most suitable considering method considering the data which get from risk density test.

  • PDF

Comparative Study of Regional-scale Ecological Risk Assessment used in Developed Countries (지역단위 생태위해성평가 선진국사례 분석)

  • Shin, Yu-Jin;Lee, Woo-Mi;An, Youn-Joo
    • Environmental Analysis Health and Toxicology
    • /
    • v.25 no.2
    • /
    • pp.169-177
    • /
    • 2010
  • Ecological risk assessment (ERA) has been used to establish environmental quality standards or evaluate ecological risk in site-specific areas. The scope of ERA was expanded based on regions, and the concept of regional-scale ecological risk assessment was recently introduced in developed countries. In the present study, regional ERA approaches of relative risk model (RRM), contaminants in aquatic and terrestrial ecosystems (CATS) model, and procedure for ecological tired assessment of risks (PETAR) in advanced countries were extensively investigated. Regional ERA was compared with traditional ERA process. Stressors, receptor and response in traditional ERA were replaced with sources of stressors, habitats, and ecological impacts, respectively in regional ERA. This study introduces the concept and assessment process of regional ERA, and provides a wide perspective how the relative ERA could be applied in Korean ecosystem.

Schematic Development of Risk Analysis for Dam Safety (저수지 안전관리를 위한 위험도 해석의 필요성과 도입방안)

  • Heo, Gun
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.58 no.2
    • /
    • pp.11-20
    • /
    • 2016
  • Korea has 17,500 irrigation dams and facing variety of causes that jeopardize dam safety. With limited resources available to manage large inventory, a portfolio risk analysis application method for numerous irrigation dam safety is essential. The purpose of this study is to find an optimum way to adopt the risk analysis to the large number of irrigation dams in Korea and to propose the portfolio risk analysis process for irrigation dams. In this study, the necessity of the risk analysis for reservoirs safety has been suggested and a phased process using pre-screening and screening methodology has been proposed. This proposed procedure will help to effectively introduce the risk analysis for reservoirs safety in Korea.

Clinical Preventive Dental and Dental Hygiene Practice by Caries Management by Risk Assessment (CAMBRA) (Caries Management by Risk Assessment (CAMBRA) 모형에 따른 임상 예방치과 및 치위생 진료)

  • Cho, Young-Sik
    • Journal of dental hygiene science
    • /
    • v.12 no.6
    • /
    • pp.545-557
    • /
    • 2012
  • Dental caries is biofilm induced disease throughout life and is recognized significant oral health problem. This article reviewed new trends in dental caries management by risk assessment, including history, protocol/guideline, and collaborated model. Dental caries prevention and treatment according to caries management by risk assessment (CAMBRA) model is patient-centered, risk-based, evidence-based practice. Team approach is necessary and clinician need to integrate science, practice and product. Dental hygienist take a important role in implementing CAMBRA. CAMBRA model could be incorporated into clinical dental hygiene education based on dental hygiene process of care as standard of dental hygiene practice and education. Dentist and dental hygienist able to provide scientific and ethical care managing dental caries by risk assessment.

An Estimation of Landslide's Vulnerability by Analysis of Static Natural Environmental Factors with GIS (GIS를 이용한 정적 자연환경인자의 분석에 의한 산사태 취약성 평가)

  • Yang, In-Tae
    • 한국지형공간정보학회:학술대회논문집
    • /
    • 2005.08a
    • /
    • pp.61-72
    • /
    • 2005
  • The landslide risk assessment process consists of hazard risk assessment and vulnerability analysis. landslide hazard risk is location dependent. Therefore, maps and spatial technologies such as GIS are very important components of the risk assessment process. This paper discusses the advantages of using GIS technology in the risk assessment process and illustrates the benefits through case studies of live projects undertaken. The goal of this study is to generate a map of landslide vulnerability map by analysis of static natural factors with GIS. A simple and efficient algorithm is proposed to generate a landslide potentialities map from DEM and existing maps. The categories of controlling factors for landslides, aspect of slope, soil, vegetation are defined. The weight values for landslide potentialities are calculated from AHP method. Slope and slope-direction are extracted from DEM, and soil informations are extracted from digital soil map. Also, vegetation informations are extracted from digital vegetation map. Finally, as overlaying, landslide potentialities map is made out, and it is verified with landslide place.

  • PDF

Analysis of the Schedule Risk using PROMETHEE in Building Construction Management (건설관리에서의 PROMETHEE기반 공정 리스크 분석)

  • Lee, Jang-Young;Yoon, You-Sang;Jang, Myung-Houn;Suh, Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.25-34
    • /
    • 2010
  • The building construction projects include a variety of risk factors due to uncertainties. To succeed in the projects, it is important how risks are managed. Risk management is composed of identification, analysis and response. Especially, the risk analysis is important to objectively calculate significance of risk factors. This paper evaluates a method to find priorities of risks using the AHP(Analytic Hierarchy Process). The method has some defects; (1) the consistency becomes weak as the number of pair-wise compared risks is large, and (2) the input and output procedures are complex when risks are added to or removed from a risk database. Thus the paper adopts the PROMETHEE(Preference Ranking Organization METHod Enrichment Evaluations) analysis process which is able to overcome the limitation of the AHP restricted to 9 risk factors. The PROMETHEE makes the procedure of risk analysis simple, when the risk factors pull out and put in the risk database. The purpose of this study is to provide process of risk analysis to use the PROMETHEE.

A MULTIVARIATE JUMP DIFFUSION PROCESS FOR COUNTERPARTY RISK IN CDS RATES

  • Ramli, Siti Norafidah Mohd;Jang, Jiwook
    • Journal of the Korean Society for Industrial and Applied Mathematics
    • /
    • v.19 no.1
    • /
    • pp.23-45
    • /
    • 2015
  • We consider counterparty risk in CDS rates. To do so, we use a multivariate jump diffusion process for obligors' default intensity, where jumps (i.e. magnitude of contribution of primary events to default intensities) occur simultaneously and their sizes are dependent. For these simultaneous jumps and their sizes, a homogeneous Poisson process. We apply copula-dependent default intensities of multivariate Cox process to derive the joint Laplace transform that provides us with joint survival/default probability and other relevant joint probabilities. For that purpose, the piecewise deterministic Markov process (PDMP) theory developed in [7] and the martingale methodology in [6] are used. We compute survival/default probability using three copulas, which are Farlie-Gumbel-Morgenstern (FGM), Gaussian and Student-t copulas, with exponential marginal distributions. We then apply the results to calculate CDS rates assuming deterministic rate of interest and recovery rate. We also conduct sensitivity analysis for the CDS rates by changing the relevant parameters and provide their figures.

Automatic Train Control (ATC) System Development through Application of Reverse and Re-Systems Engineering Process (역공학 및 재공학 시스템엔지니어링 프로세스 적용을 통한 무인열차자동제어시스템 개발)

  • 이중윤;박영원
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.9 no.10
    • /
    • pp.836-843
    • /
    • 2003
  • The automatic train control (ATC) system development project for the Automated Guideway Transit (AGT) system has high technical risk because the system is unmanned train control system using wireless technology which was unprecedented in train control industry of Korea. To overcome the technical risk during concept design phase of the ATC system development project, the integrated product team(IPT) carried out a reverse and reengineering process using a systems engineering design model. The generic systems engineering process is incorporated in the both reverse and reengineering process. As a result of the systems engineering effort, the IPT has built top layer systems engineering design model of the ATC subsystem. The purpose of this paper is to deliver the reverse and reengineering process which was used to develop the systems engineering design model of ATC system using a computer aided systems engineering tool. This study also shows that the model based reverse and reengineering process can reduce the technical risk by identifying the differences of requirement, functional and physical architecture between a reference system and a target system.

A risk assessment of $CO_2$ geological storage for domestic application (이산화탄소 지중저장의 국내적용을 위한 위해성 평가 방안)

  • Lee, Kang-Ryel;Lee, Dae-Soo
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.220.1-220.1
    • /
    • 2011
  • In recent years, the importance of Carbon Capture and Storage (hereafter CCS) is growing bigger and bigger. The development and commercialization of CCS technology are concerned for reducing carbon dioxide($CO_2$) emissions. For the most studies, the technology of $CO_2$ storage is known as the geological storage, ocean sequestration, mineral carbonation, industrial utilization, and so on. The geological storage is adjudged the most reasonable technology from economic and environmental aspects. Generally, the $CO_2$ geological storage is comprised of compression - transportation - drilling/injection - storage/management process. The critical problem is a leakage of $CO_2$ in all process. For resolving a leakage problem, it is necessary to predict and build a monitoring system. Those systems are proved safety of a leakage and received positive social perceptions of $CO_2$ geological storage. For those reasons, a risk assessment of $CO_2$ geological storage is required. A risk assessment is an estimated process of the possible effects when spilling $CO_2$. Although numerous studies of risk assessment have studied, it is incomplete to evaluate a risk and disaster quantitatively. The risk assessment will be developed for domestic application and safe $CO_2$ geological storage considering characteristics of Korea.

  • PDF