• Title/Summary/Keyword: process management system

Search Result 7,283, Processing Time 0.034 seconds

A Study on the Management Effectiveness Analysis of Construction Process Management (건설 프로세스 경영의 경영효과 분석에 관한 연구)

  • Kim, Young-Seop;Hwang, Ug-Sun;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.81-89
    • /
    • 2008
  • The purpose of this study Management Effectiveness Analysis of Construction Process Management. This study is to analyze the effects that process management has in outcome has been done by setting 5 elements of process management system as independent variables, making hypothesis, surveying and analyzing. The results of this analysis showed that process management operation level can be measured effectively through the application of Business Process Management System, and Process management strategy is found out to be contributed to improving strategy operation support, process management and IT connection technology. By seeing this research result, through optimally applying 'process management' in construction industry, process management can be used to improve the construction industry's potential competitiveness by improving effectiveness in works in the fields of strategy operation, process management, IT connection etc. So, by practically verifying the effectiveness of 'process management system', the purpose of this research is to come up with the necessity and the development of 'process management system' in construction industry.

A Development of the Web-based Process Management system for a Medium-sized Company (중형업체를 위한 웹기반의 프로세스 관리 시스템 제안)

  • 이만호;이수홍
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2000.11a
    • /
    • pp.579-582
    • /
    • 2000
  • In this study, we investigate several problems of previous workflow system, and suggest an enhanced process management system that involves a substantial portion of workflow system. To overcome the differences in systems, we selected a web as platform to develop a process management system, and we investigate merit and capability of web-based process management system. We improved WFMS's ability to define various process through many behavior rules and multiple layered process structure. We suggest X-WPM system for the process management system with XML technology.

  • PDF

A Basic Study on the Improvement of PC Project Management System Process (PC 공사 프로젝트 관리 시스템 프로세스 개선을 위한 기초연구)

  • Kim, Chang-Hun;Ahn, Yong-Han
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.95-96
    • /
    • 2023
  • The purpose of this study is to derive the limitations of the existing management system by analyzing the characteristics of the PC process to improve the PC construction project management system process. To overcome the limitations derived, we present a process of managing integrated information from the design-production-construction stage using QR codes and clouds. This is expected to help develop a PC construction project management system.

  • PDF

Development of Web-based Process Management System for Spatial Data Construction (웹기반의 공간데이터 구축공정 관리시스템 개발)

  • Choi, Byoung-Gil;Kim, Sung-Soo;Cho, Kwang-Hee
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.14 no.3 s.37
    • /
    • pp.63-70
    • /
    • 2006
  • This study aims to development of web-based process management system for spatial data construction. For developing this system work classification of basic surveying was standardized and quality management method for spatial data was established. Production process and work classification system for basic surveying such as control point surveying using GPS, leveling, aerial photographing, digital mapping, topographic mapping, digital elevation modeling, aerial photographic DB construction and digital orthophotomap was standardized. The status of the output and quality inspection for basic surveying project were analyzed, and the elements of quality inspection and data format for the type of outputs were analyzed. Based on standardized and analyzed contents, web-based process management system was developed after database and process was designed. The process management system consisted of process management, quality control, metadata management, and system management.

  • PDF

A Study on The Mass Production Weapon System Parts Localization System Engineering Development Management Process Application based on ISO/IEC/IEEE 15288 (ISO/IEC/IEEE 15288 기반 양산단계 무기체계 부품국산화 체계공학 개발관리 절차 적용 연구)

  • Kim, Jang-Eun;Shim, Bo-Hyun;Cho, Yu-Seup;Sung, In-Chul;Han, Dong-Seog
    • Journal of Korean Society for Quality Management
    • /
    • v.44 no.3
    • /
    • pp.541-552
    • /
    • 2016
  • Purpose: In this study, we propose that how to approach a effective system engineering and optimize system engineering management process for the mass production weapon system parts localization development process and success in DTaQ. Methods: To approach a effective system engineering for the mass production weapon system parts localization, we analyze a weapon system acquisition process and system engineering process of Republic of Korea and DTaQ parts localization business regulations in advance. after results of analysis of them, we implement a optimized parts localization development system engineering based on ISO/IEC/IEEE 15288. Results: In order to apply International Standard ISO/IEC/IEEE 15288 to the mass production weapon system parts localization development process, we compare the mass production weapon system parts localization acquisition environment with ISO/IEC/IEEE 15288 and analyze them. therefore, It is possible to implement a part of concept stage and development stage of ISO/IEC/IEEE total life cycle stage for the mass production weapon system parts localization development process. To achieve the technical review milestones of DTaQ parts localization business regulations in the selected stages of ISO/IEC/IEEE, the development and management agency perform 2 high rank process and 19 low rank process specified in ISO/IEC/IEEE. Conclusion: When the development and management agency perform the mass production weapon system parts localization development using the proposed system engineering approach, they should easily meet milestone through the clarified requirement and simplified System Engineering output documents in limited development period.

Design of Architecture for Collaborative Project Management System based on Business Process (프로세스 기반의 협업 프로젝트 관리 시스템 구조 설계)

  • Baek, Jae-Yong;Jung, So-Young;Kim, Bo-Hyun;Yoo, Seock-Kyu;Lee, Seok-Woo;Choi, Hon-Zong
    • Korean Journal of Computational Design and Engineering
    • /
    • v.14 no.5
    • /
    • pp.338-345
    • /
    • 2009
  • c-PMS(collaborative project management system) is a business process(BP) based tool to manage collaborative projects which accomplish common business objectives determined by mutual agreement of companies using limited resources and time. This study analyzes collaborative BP, collaborative projects, and their relation, and proposes the architecture and operation scenario of c-PMS consisted of business process asset management(BPAM) sub-system and project manage(PM) sub-system. BPAM sub-system models private and public BP using a client/server based modeler, defines collaborative BPs process from public BPs, and manages them as companies' asset on a web portal. PM sub-system globally manages collaborative project using planning, execution, monitoring, and analyzing functions.

Development of Project Management Process for System Integration (SI 프로젝트관리 프로세스 개발)

  • Min, Taek-Kee
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.35 no.3
    • /
    • pp.163-172
    • /
    • 2012
  • Regarding project management, many organizations have developed and distributed general project management knowledge systems, and application fields use the knowledge systems to apply the process suitable for characteristics of a project. This study suggests project management process models to apply to system integration projects. This system integration project management process model is composed of six top processes of initiation, preparation for contract, planning, implementation management, coordination and control, and termination and transfer. The five processes are re-divided into 25 bottom processes. These processes are expressed as input, control, output, and mechanism by using the IDEF0 model. For this model development, it has chosen the items which constituted a process through a questionnaire of experts.

Development Process of Systems Engineering Management Plan(SEMP) for Large-Scale Complex System Programs (대형 복합 시스템 개발을 위한 효과적인 시스템공학 관리계획 개발 프로세스)

  • 유일상;박영원
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.26 no.4
    • /
    • pp.82-90
    • /
    • 2003
  • The Systems Engineering, as a methodology for engineering and management of today's ever-growing complex system, is a comprehensive and iterative problem-solving process. The process centers on the analysis and management of the stakeholders' needs throughout the entire life-cycle of a system and searches for an optimized system architecture. There are many essential needs and requirements to be met when a system development task is carried out. Systems Engineering Management Plan(SEMP), as a specification for system development process, must be established to satisfy constraints and requirements of stakeholders successfully and to prevent cost overrun and schedule delay. SEMP defines technical management functions and comprehensive plans for managing and controlling the entire system development process, specialty engineering processes, etc. Especially. in the case of a large-scale complex system development program where various disciplinary engineering such as mechanical; electrical; electronics; control; telecommunication; material; civil engineering etc. must be synthesized, it Is essential to develop SEMP to ensure systematic and continuous process improvements for quality and to prevent cost/schedule overruns. This study will enable the process knowledge management on the subject of SEMP as a core systems engineering management effort, that is, definitely defining and continuously managing specification of development process about requirements, functions, and process realization of it using a computer-aided systems engineering software. The paper suggests a systematic SEMP development process and demonstrates a data model and schema for computer-aided systems engineering software, RDD-100, for use in the development and management of SEMP. These are being applied to the systems engineering technology development task for the next-generation high-speed railway systems in progress.

Development of a Process Monitoring System for Real-Time Process Control (실시간 공정관리를 위한 공정모니터링 시스템 개발)

  • Lee, Jung-Hwan;Lee, Seung-Hoon;Oh, Hyun-Ok
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.31 no.1
    • /
    • pp.92-100
    • /
    • 2008
  • This paper develops a process monitoring system for real-time process control. The practical case is studied on a small and medium marine equipment company. For business process reengineering of the company, we adopt an approach based on information engineering methodology, which consists of four stages : planning, analysis, design, and implementation. The system is developed for Client/Server environment. We discuss the constructing of hardware system for real-time process control at low cost. The developed system is composed of interrelated modules for item master and BOM management, process control, facility management, SQC and work report.

A study on the development of Enterprise Risk Management System in Airport Corporation (공항운영기업의 전사적 위험관리체계 분석 연구)

  • Seo, Byung Seok;Shin, Do Hyoung
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.2
    • /
    • pp.1-11
    • /
    • 2015
  • Enterprise Risk Management(ERM) is aiming at the establishment of the risk management process to prevent and cope with risks in advance and is composed of Risk Identification, Risk Assessment, Risk Response and Monitoring. It is feedback through the Risk Re-identification. This study has analysed a sample of the risk management system of an airport operating corporation, for this purpose, relevant documents and examples of overseas airports have been reviewed. It has found that corporations establishing ERM have been performing identical procedures such as the process of Identification, Assessment, Effective Reporting, Communication and monitoring and so on. The A corporation has established the process for risk management and crisis management and organized for its organization and system. The risk management has the same process such as above. In this process, when the symptoms of critical crisis have been recognized, it has been transformed into crisis management system, through which, corporate-wide response has been conducted in the process of crisis status analysis, response and follow-up management. This study expects to contribute to systematic foundation for future business continuity on the basis of risks and response procedures acknowledged by this study.