Microarray technology is extensively being used in experimental molecular biology field. Microarray experiments generate quantitative expression measurements for thousands of genes simultaneously, which is useful for the phenotype classification of many diseases. One of the two major problems in microarray data classification is that the number of genes exceeds the number of tissue samples. The other problem is that current methods generate classifiers that are accurate but difficult to interpret. Our paper addresses these two problems. We performed a direct integration of individual microarrays with same biological objectives by transforming an expression value into a rank value within a sample and generated rank-comparison decision rules with variable number of genes for cancer classification. Our classifier is an ensemble method which has k top scoring decision rules. Each rule contains a number of genes, a relationship among involved genes, and a class label. Current classifiers which are also ensemble methods consist of k top scoring decision rules. However these classifiers fix the number of genes in each rule as a pair or a triple. In this paper we generalized the number of genes involved in each rule. The number of genes in each rule is in the range of 2 to N respectively. Generalizing the number of genes increases the robustness and the reliability of the classifier for the class prediction of an independent sample. Also our classifier is readily interpretable, accurate with small number of genes, and shed a possibility of the use in a clinical setting.
Kim, Kang-Shik;Hyun, Chang-Taek;Hong, Tae-Hoon;Jo, Seong-Min;Mun, Hyun-Seok
Journal of the Korea Institute of Building Construction
/
v.10
no.1
/
pp.81-89
/
2010
Since 2004, the government has changedthe cost estimate system to one of an actual cost basis in order to calculate the optimum construction cost by reflecting changes in circumstance on the construction site in a timely manner. Currently, this is being applied to public construction work forover a billion won of actual cost data in estimation by contract unit cost. However, directly reflecting actual cost, which for large-sized construction work was originally an average unit cost, to a small building, entails the application of a low discount rate for the cost of materials, labor, etc. and therefore can frequently give rise to cases in which the actual cost of work performed exceeds the contract sum, which in turn causes problems such as decreased revenues, bad effectson business operation, productivity, etc. Therefore, to apply actual cost to small-sized construction work (less than a billion won), there should be a plan to modify unit cost in a manner that can reflect project scale, etc. in order to resolve the problem of unit cost application of actual cost to small-building construction projects. The unit cost modification model for proper actual construction cost in small-scale construction projects developed by this study will help to increase the relevant productivity and proper gain, preventing the aggravation of business operations. Organizations placing orders are also expected to be able to secure a more realistic construction cost in arranging the budget.
Park, Chan-Young;Kim, Hyunjin;Won, Jin Woo;Jang, Woosik;Han, Seung-Heon
Korean Journal of Construction Engineering and Management
/
v.17
no.4
/
pp.12-19
/
2016
Recently, The importance of modular construction method has increased by market environmental change. However, it's application in the actual project is restricted due to the lack of understanding of modularization and the absence of utilization system. To overcome this problem, this study propose the decision-making model for selecting modular or conventional (stick-built) construction method at early stage. First the needs of modular method in plant project is derived and the benefits and barriers of modular construction are analyzed through literature review. Based on this analysis, 6 decision-making factors covered project and modular characteristics are derived and the decision-making model is developed. Finally, 12 actual overseas project cases is evaluated by this model for verifying its applicability. This proposed model can provide the guideline to select the construction method in early stage for successful execution of plant project.
Korean Journal of Construction Engineering and Management
/
v.17
no.4
/
pp.3-11
/
2016
Recently, overseas plant orders of domestic enterprises are steadily increased, and the amount of orders in the first half of 2014 were 93% increased compared to the previous year. In addition, now which is the third quarter of 2015, overseas plant orders are already over 249.8 billion dollars so the interests of plant industry research has been increased. In the life cycle of the plant project, CM before the construction stage is to complement the uncertainties that are inherent in the early stages of the project, and from the viewpoint of supporting the rational decision-making, the importance of its role is on the rise. Among them, excavating and investing participation plan in the planning stage is an important work that has a large impact force to influence the success and failure of future project. However, the work has become a problem with frequent consultations due to decision-making, continuous modification, and inefficient repetitive tasks. Therefore, it is needed that work process should be changed to effectively accommodate. The purpose of this paper is to derive the major work items for excavating and investing participation plan in the planning stage of the plant project, and establish a standardized work process through the Delphi analysis. The result of this study is expected to be utilized for EPC companies in ensuring the technical competitiveness in planning on overseas markets, and improve the efficiency of work.
Korean Journal of Construction Engineering and Management
/
v.11
no.1
/
pp.88-100
/
2010
As the competition between companies are deepened, the number of companies adopting six sigma principles, which is one of the innovative management strategies, are increasing. According to this trend, the changes in both strategies and methodologies of six sigma are continuous. However, the evaluations and the management principles included in the process after the six sigma applications are insufficient, and the cooperation between the parties in the company is also not enough because the application process of six sigma is too complex and not efficient. In order to solve this problem, a research for developing the methodology which can learn about and do six sigma applications is so necessary, specifically for expanding the six sigma applications and introducing the participation of all company members. The purpose of this study, therefore, was to develop and present more efficient Six Sigma applied process by reducing the existing unnecessary steps in improvement one, by applying the examination method of wasteful elements on the potential factors, through analyzing the Six Sigma DMAIC applied case in the construction industry. The result of those application showed that the detection of potential factors using wasting elements was possible in measurement step and that it was possible for the improved process with reduced steps compared to existing process while to remain the outcomes. It is considered that the performance rate of Six Sigma project will be improved significantly because the reduction in the improvement step does not affect the improvement effect within the whole Six Sigma project.
Korean Journal of Construction Engineering and Management
/
v.18
no.3
/
pp.3-11
/
2017
Since the global financial crisis, the average youth employment rate in OECD countries dropped from 54% in 2007 to 50.8% in 2013 while the average youth unemployment rate jumped from 9.7% in 2007 to 13.4% in 2013. A similar trend was seen in Korea, with a decrease of the youth employment rate from 42.6% in 2007 to 41.5% in 2015. The country's youth unemployment rate increased from 7.2% in 2007 to 9.2% in 2015. The low youth employment rate has quickly become a social problem not only in Korea but also worldwide. The Korean construction industry will gradually move its focus of investment from quantitative growth to investing in qualitative growth of the sector. In this sense, it is imperative to create jobs for construction engineers and train global talents. This study analyzed the presence of construction engineers and the employment status of university graduates in Korea to suggest ways to create jobs for young construction engineers. To train global talents in the construction engineering sector, it will be necessary to not only establish middle-long term plans but also change the perception of the construction industry from 3D (dirty, difficult, dangerous) to 3C (clean, clear, creative) along with appropriate infrastructure supporting the industry.
Korean Journal of Construction Engineering and Management
/
v.18
no.3
/
pp.33-41
/
2017
A modular specification is a contract document that specifies the requirements of production, transformation and installation in a modular construction. A problem of the currently used specification is that it does not guarantee the level of performance required by the modular construction and fails to accommodate unique characteristics of each construction because it widely uses the standard specification as it is. This study proposes a specification that reflects the unique feature of modular construction in order to improve the quality of modular construction. Research focuses on the leakage in waterproof and mechanical equipment because it is the area with the highest rate of defects. This study suggests ways to improve the modular specification as follows: 1)Descriptive specifying (following MasterFormat) 2)Propose leakage verification method and test clause 3) Reflect characteristic of modular construction. Proposed modifications to modular specification are reviewed by experts for validation and their opinion verifies suggested improvements as a way to secure the quality of modular construction and to promise characteristics of the modular specification. This improvement will be used for reference when writing construction project specification, which can be an important contract document, so that it could lower occurrence rate of the modular defects.
Korean Journal of Construction Engineering and Management
/
v.18
no.1
/
pp.58-64
/
2017
Construction Management (CM) is being utilized as an efficient project management system. Construction management system provide scientific management techniques as well as the expert's service with the expertise. Accordingly, CM services demand is continuously increasing in construction project. Construction Management engineer grade is distinguished by the Index of Construction Engineer's Competency (ICEC). Construction management engineer requires a higher score than the other fields. However, junior grade CM engineer can get grade according to the education and qualification. This study was conducted junior grade CM engineer depth interview after analyzing the problem of the current CM engineer grade system. As a result, this study was to extracted the 23 kind competence factors. And, competence factors were five area grouped using affinity diagram method. Next, we analyzed the importance utilizing the Analytic Network Process (ANP) technique. As a result, high priority areas were analyzed to be quality and cost areas associated with project management.
In this study, open inquiry reports of 165 eighth graders in Daegu were analyzed in terms of content area, the types of inquiry hypothesis, and the types of inquiry variables. Before summer vacation, students learned about inquiry process and explored their own inquiry topic for two class hours. During summer vacation, students performed open inquiry including problem selection, designing and performing experiment, data collection, data analysis, and writing report. After the vacation, students submitted their reports, and answered to additional survey regarding the source of inquiry idea, the definition of hypothesis, and the most difficult step of inquiry process. As a result, chemistry was the most dominant content area of the reports and biology and life science were the next. 130 out of 165 reports included inquiry hypotheses, and most of them were predictive hypotheses. In many reports, dependent and independent variables could not be identified because of their ambiguity. However, inquiry variables described in experimental design, which were mostly categorical variables, were clearer than those described in inquiry subject and inquiry hypothesis. The most difficult step of inquiry process for students was to generate an idea for open inquiry.
Journal of the Computational Structural Engineering Institute of Korea
/
v.29
no.6
/
pp.563-569
/
2016
This paper presents the resizing method of columns and beams that considers column-to-beam strength ratios to simultaneously control the initial stiffness and ductility of steel moment frames. The proposed method minimizes the top-floor displacement of a structure while satisfying the constraint conditions with respect to the total structural weight and column-to-beam strength ratios. The design variable considered in this method is the sectional area of structural members, and the sequential quadratic programming(SQP) technique is used to obtain optimal results from the problem formulation. The unit load method is applied to determine the displacement participation factor of each member for the top floor lateral displacement; based on this, the sectional area of each member undergoes a resizing process to minimize the top-floor lateral displacement. Resizing members by using the displacement participation factor of each member leads to increasing the initial stiffness of the structure. Additionally, the proposed method enables the ductility control of a structure by adjusting the column-to-beam strength ratio. The applicability of the proposed optimal drift design method is validated by applying it to the steel moment frame example. As a result, it is confirmed that the initial stiffness and ductility could be controlled by the proposed method without the repetitive structural analysis and the increment of structural weights.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.