• Title/Summary/Keyword: priority of safety

Search Result 746, Processing Time 0.029 seconds

Evacuation Safety Evaluation of Tourist Hotels with the Fire Alarm Method

  • Moon, Sung-Chun;Kong, Ha-Sung
    • International Journal of Advanced Culture Technology
    • /
    • v.9 no.4
    • /
    • pp.363-375
    • /
    • 2021
  • The purpose of this study is to analyze the safety of evacuation using the Pathfinder program for the alert at once, the priority alarm method, the priority alarm method for the four floors above, and the sequential priority alarm method, which is a modification of the priority alarm method specified in the tourist hotel building. Currently, in Korea's National Fire Safety Codes (NFSC), fire alarm methods are compulsorily applied differently depending on the number of floors and total floor area of a building. Although the growth rate is getting faster due to the diversification of building structures, it is still an obstacle to improving evacuation safety to comply with the standardized fire alarm method in NFSC. As a result of the experiment, the evacuation time was found to be faster with the priority alarm method for the four floors above than the priority alarm method applied to the specific firefighting object. Compared to the priority alarm method applied to the tourist hotel, which is a specific firefighting target with 5 or more floors and a total floor area of more than 3,000m2, the time was shortened by 3.7 seconds when measured by applying the priority alarm method for the four floors directly above. This indicates that it is necessary to take measures to select a fire alarm method suitable for the structure and environmental conditions of the building rather than applying the uniform NFSC regulations.

A Study on the Priority for the Hazard and Risk Evaluation of Chemicals (HREC) According to the Industrial Safety and Health Act (ISHA) (산업안전보건법 상 관리수준 검토를 위한 화학물질 유해성.위험성 평가대상 후보물질 선정에 관한 연구)

  • Yang, Jeong Sun;Lim, Cheol Hong;Park, Sang Young
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.22 no.1
    • /
    • pp.73-81
    • /
    • 2012
  • Object: The aim of this study is to suggest a list of priority chemicals for the Hazard & Risk Evaluation of Chemicals (HREC) controlled by the Industrial Safety and Health Act (ISHA). Method: Screening assessment was done for 642 chemicals whose exposure threshold limit values were set by the Ministry of Employment and Labor (MOEL). Hazard data were collected from Korea Occupational Safety & Health Agency (KOSHA) and/or other toxicity database. Exposure data were obtained from KOSHA internal database. The hazard and exposure scores of chemicals were listed by order of priority in accordance with GHS classification and exposure index data. Result: From the result of screening risk assessment for 642 chemicals, we extracted a list of 13 priority chemicals for HREC performed by the ISHA. A priority list of 27 chemicals which have carcinogen, mutagen and/or reproductive toxicity but not controlled by the ISHA was suggested for additional evaluation as "chemicals for special management".

A Study on the Priority Evaluation of Prevention Factors and Strategies to Minimize Industrial Accident Cause (산재원인을 최소화하기 위한 예방인자 및 전략의 우선순위 평가에 관한 연구)

  • Kang, Young-Sig;Choi, Man-Jin;Yang, Sung-Hwan;Yoon, Yong-Gu;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.10 no.4
    • /
    • pp.1-9
    • /
    • 2008
  • It is very important to evaluate the priority of prevention factors and strategies in order to minimize industrial accident. It provides decisive information for accident prevention and safety management. Therefore, this paper proposes evaluation method of the priority through statistic testing with prevention factors and strategies by the cause analysis of cause and effect models. Especially, this paper uses priority matrix criterion to justify application of rank and objectivity. This paper is based on the results of a questionnaire of workers and managers who are engaged by real manufacturing and construction industries with less than 300 workers in the central region of Korea, where most of the fatal accidents have happened. Finally, the result provides one way to implement safety management for industrial accident prevention.

An Analysis of Policy Priority for Work-Related Injury & illness and Investment Losses of Workplace Safety (작업관련성 손상·질병 발생과 손실비용에 따른 예방정책 우선순위 연구)

  • Park, Kyoung-Don;Yi, Kwan-Hyung
    • Journal of the Korea Safety Management & Science
    • /
    • v.15 no.4
    • /
    • pp.7-16
    • /
    • 2013
  • As workplace incidents has been being declining in Korea, there is criticism of the effectiveness of occupational safety policy implementation. It is unknown that which policy target group needs to be targeted to yield effective injuries prevention. The purpose of this paper is to analyze and reveal the policy intervention group with a high priority in terms of industrial incident prevention and the related investment cost. A Policy Priority Model(PPM) is composed of 6 indicators regarding influences of both the incident reduction and the cost reduction. Z-score analyses are used to confirm the high policy priority area or policy target group. Overall, workplace with worker below 50 persons, construction site with the sales of more than a hundred million won, workplace with relatively small percentage of female employees and relatively higher percentage of older worker should be prioritized to reduce workplace injuries. This paper provides an analytic way that can be used to decide the policy priority workplace in order not only to reduce work-related injuries&illnesses and the related investment cost but to further lessen the related societal costs.

Reagent Cabinet Management System Using Danger Priority

  • Cao, Kerang;Kang, Inshik;Choi, Hyungwook;Jung, Hoekyung
    • Journal of information and communication convergence engineering
    • /
    • v.15 no.4
    • /
    • pp.227-231
    • /
    • 2017
  • Recently, as the number of safety accidents caused by reagents increases, researches on a system that can reduce safety accidents are underway. Existing systems managed reagent cabinet through various sensors. On the other hand, there are disadvantages in that countermeasures against simultaneous danger situations are insufficient at multi-reagents cabinet. In order to solve this problem, this paper proposes a system to manage the reagents cabinet through danger priority. Danger priorities are selected through domestic chemical accident cases and the Chemical Safety Management Act. If a danger situation occurs in the reagent cabinet, make sure it is from a single or multiple reagent cabinets. For multiple reagent cabinets, compare the reagent cabinet priorities and run the device sequentially from the reagent cabinet with the highest priority. Thus, by operating the device according to the danger priority, the chain reaction can be prevented in advance and the reagent cabinet can be safely managed.

Factors Affecting Nursing Students' Perception on Pediatric Patient Safety Culture and Nursing Activity (간호대학생의 입원아동 안전간호활동 인식 영향 요인)

  • Park, Eunsook;Oh, Won-Oak;Kim, Mirim
    • Child Health Nursing Research
    • /
    • v.23 no.4
    • /
    • pp.534-542
    • /
    • 2017
  • Purpose: The purpose of this study was to identify the factors that affect nursing students' perception of pediatric safety nursing activities for children during hospitalization. Methods: The study sample included 304 nursing students who had participated in pediatric nursing practice. Data were analyzed using SAS 9.3 program. Results: Regression analysis showed that the model's explanatory power was 37%. Safety policy and procedure, safety priority, disaster experience, and knowing a place of refuge were factors affecting the perception of safety nursing activities for children during hospitalization. Conclusion: Findings show that safety policy and procedures and safety priority are major factors that affect the perception of safety nursing activities and indicate that effective education programs on safety policy and procedure and safety priority are necessary to improve the perception of safety nursing activities.

Analysis of Risk Priority Number for Grid-connected Energy Storage System (계통연계형 에너지저장시스템의 위험우선순위 분석)

  • Kim, Doo-Hyun;Kim, Sung-Chul;Park, Jeon-Su;Kim, Eun-Jin;Kim, Eui-Sik
    • Journal of the Korean Society of Safety
    • /
    • v.31 no.2
    • /
    • pp.10-17
    • /
    • 2016
  • The purpose of this paper is to deduct components that are in the group of highest risk(top 10%). the group is conducted for classification into groups by values according to risk priority through risk priority number(RPN) of FMEA(Failure modes and effects analysis) sheet. Top 10% of failure mode among total potential failure modes(72 failure modes) of ESS included 5 BMS(battery included) failure modes, 1 invert failure mode, and 1 cable connectors failure mode in which BMS was highest. This is because ESS is connected to module, try, and lack in the battery part as an assembly of electronic information communication and is managed. BMS is mainly composed of the battery module and communication module. There is a junction box and numerous connectors that connect these two in which failure occurs most in the connector part and module itself. Finally, this paper proposes RPN by each step from the starting step of ESS design to installation and operation. Blackouts and electrical disasters can be prevented beforehand by managing and removing the deducted risk factors in prior.

A Study on the Priority Making of Human Error Prevention Business Using AHP (계층화분석기법(AHP)을 이용한 철도 인적오류 예방 사업의 우선순위 분석 연구)

  • Han, Kee-Youl;Back, You-Seoung
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.3
    • /
    • pp.111-117
    • /
    • 2012
  • In this paper to prevent human errors analyzed the causes of railway accidents and human error in last 5 years(2007~2011). The 2nd Railway Comprehensive Safety Plan currently being implemented in the safety business for prevention of human error. The accidents are often resulted from multiple causes with hardware failure and human errors. And prevention of human error associated with the implementation details of the priority projects, 14 projects were selected by draw. Then Analytic Hierarchy Process(AHP) methodology was used to select what projects were effective to human error.

Development of Curriculum for Agricultural Work Safety and Health Management Specialist Training Course (농작업 안전보건관리 전문가 양성과정의 교육과정 개발)

  • Lee, Hyeon-Gyeong;Chae, Hye-Seon;Park, Soo-In;Kim, In-Soo
    • Journal of Agricultural Extension & Community Development
    • /
    • v.29 no.3
    • /
    • pp.131-142
    • /
    • 2022
  • This study aims to develop a curriculum for nurturing experts who perform agricultural safety and health management tasks. This study was conducted in three stages. First, job definitions and job models of agricultural safety and health managers were derived through job analysis using the DACUM technique. Second, job demand analysis was conducted by conducting a survey on the difficulty, importance, and frequency of each task. Third, IPA analysis was performed as the first priority tasks of job demand analysis to present the courses and subjects of the training course for safety and health managers in agricultural work. The job of the agricultural safety and health manager was defined as "to conduct guidance and advice on safety and health education, risk factors, and evaluation and management of harmful factors to protect farmers' professional health and safety." The job model consisted of 4 tasks, 31 core tasks, and 67 detailed tasks. As a result of job demand analysis, there were 39 tasks in the 1st priority, 22 in the 2nd priority, and 6 in the 3rd priority. As a result of the IPA analysis, there were 13 'capacity development focused areas', 4 'capacity development effort areas', 11 'low priority areas', and 3 'continuous maintenance areas'.

The Analysis of the Priority and Progress Direction of Electrical Safety Technology using Analytic Hierarchy Process (계층분석과정(AHP)을 이용한 전기안전기술 우선순위 및 추진방향 분석연구)

  • Kim, Han-Sang;Yi, Geon-Ho;Kim, Dong-Woo;Jeon, Jeong-Chay;Lee, Ki-Yeon;Kim, Young-Seog;Jung, Jin-Soo
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.12
    • /
    • pp.1784-1791
    • /
    • 2013
  • Electrical safety technique is a disaster prevention technology to protect the life and property of the people and it has high correlation with all electricity industry. According to the latest statistics, loss of human life and property damage due to electrical fire have increased from 2011. Therefore, technological development for guarantee safety of electrical facilities for customer will become more important. In this paper, we drew priority and weigh for the electrical safety technology using analytic hierarchy process and present progress direction of each technology through Risk-Return assessment. We expect development of the research and development policies of government about electrical safety technology in a higher state and think that policymakers and experts will be more interested in these fields based on this paper.