• Title/Summary/Keyword: priority function

Search Result 430, Processing Time 0.03 seconds

A Study on Practical Method of Utility Curve for Deciding Priority Order of the Improvements in Traffic Safety Audit (교통안전진단 개선방안들의 우선순위 산정 연구)

  • Choi, Ji Hye;Kang, Soon Yang;Hong, Ji Yeon;Lim, Joon Beom
    • Journal of the Korean Society of Safety
    • /
    • v.31 no.3
    • /
    • pp.143-155
    • /
    • 2016
  • Recently, a massive loss of life and property is occurring in Korea due to traffic accidents, with the rapid increase in cars. For improvement of traffic safety, the Korea Transportation Safety Authority intensively analyzes accident data in local governments with low traffic safety index, performs a field investigation to extract problems and offers local governments improvements for problems, by conducting the 'Special Survey of Actual Conditions of Traffic Safety' each year, starting 2008. But local governments cannot strongly push forward the improvement projects due to the limited budget and the uncertainty of the improvement plan effects. Therefore, this study suggested a model which applied the Utility concept to the AHP theory, in order to efficiently decide a priority of the improvement plans in accident black spots in consideration of the limited budget of local governments. The number of accidents in each spot for improvement and accident severity, traffic volume, pedestrian volume, the improvement project cost and the accident reduction effect were chosen as evaluation factors for deciding a priority, and data about the improvement plan costs and the accident reduction effects, traffic accidents and traffic volume in the spots to undergo the special research on the real condition of traffic accident in the past were collected from the existing studies. Then, regression analysis was carried out and the Utility Curve of each evaluation factor was computed. Based on the AHP analysis findings, this study devised a priority decision method which calculated the weight and the utility function of each evaluation factor and compared the total utility values. The AHP analysis findings showed that among the evaluation factors, accident severity had the biggest importance and it was followed by the improvement plan cost, the number of accidents, the improvement effect, traffic volume and pedestrian volume. The calculated utility function shows a rise in utility, as the variables of the 5 evaluation factors; the number of accidents, accident severity, the improvement plan effect, traffic volume and pedestrian volume increase and a fall in utility, as the variables of the improvement plan cost increase, since the improvement plan cost is included in the budget spent by a local government.

Development of MCDM for the Selection of Preferable Alternative and Determination of Investment Priority in Water Resource Projects (수자원사업 대안선정 및 투자우선순위결정을 위한 다기준의사결정모형 개발)

  • Yeo, Kyudong;Kim, Gilho;Lee, Sangwon;Choi, Seungan
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.6B
    • /
    • pp.551-563
    • /
    • 2011
  • Water resource projects need an enormous national budget. Therefore, a reasonable and reliable decision making is required for the planning of water resource projects, but decision making has been mostly performed by economic analysis. The objective of this study is to develop a Multi-criteria Decision Making(MCDM) model which can assess the project in various aspects for the selection of preferable alternative and determination of investment priority in water resource projects. In this study, the criteria involves economic feasibility, policies, vulnerability, and sub-items which have weights obtained from the expert survey for the consistent evaluation. We also derived the utility function considering risk trend of each item based on the expert survey. Then, the total score was estimated by weights of each item and utility score of each attribute. The results show that vulnerability is a major contributor for the criteria. This study will contribute to the selection of proper water resource projects considering efficiency of project and fairness for vulnerable area.

Beam Scheduling and Task Design Method using TaP Algorithm at Multifunction Radar System (다기능 레이다 시스템에서 TaP(Time and Priority) 알고리즘을 이용한 빔 스케줄링 방안 및 Task 설계방법)

  • Cho, In-Cheol;Hyun, Jun-Seok;Yoo, Dong-Gil;Shon, Sung-Hwan;Cho, Won-Min;Song, Jun-Ho
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.21 no.1
    • /
    • pp.61-68
    • /
    • 2021
  • In the past, radars have been classified into fire control radars, detection radars, tracking radars, and image acquisition radars according to the characteristics of the mission. However, multi-function radars perform various tasks within a single system, such as target detection, tracking, identification friend or foe, jammer detection and response. Therefore, efficient resource management is essential to operate multi-function radars with limited resources. In particular, the target threat for tracking the detected target and the method of selecting the tracking cycle based on this is an important issue. If focus on tracking a threat target, Radar can't efficiently manage the targets detected in other areas, and if you focus on detection, tracking performance may decrease. Therefore, effective scheduling is essential. In this paper, we propose the TaP (Time and Priority) algorithm, which is a multi-functional radar scheduling scheme, and a software design method to construct it.

A Scheduling Algorithm for the Synthesis of a Pipelined Datapath using Collision Count (충돌수를 이용한 파이프라인 데이타패스 합성 스케쥴링 알고리즘)

  • Yu, Dong-Jin;Yoo, Hee-Jin;Park, Do-Soon
    • The Transactions of the Korea Information Processing Society
    • /
    • v.5 no.11
    • /
    • pp.2973-2979
    • /
    • 1998
  • As this paper is a scheduling algorithm for the synthesis of a pipelined datapath under resource constraints in high level synthesis, the proposed heuristic algorithm uses a priority function based on the collision count of resourecs. In order to schedule the pipelined datapath under resource constraints, we define the collision count and the priority function based on the collision count, a number of resource, and the mobility of operations to resolve a resource collision. The proposed algorithm supports chaining, multicycling, and structural pipelining to design the realistic hardware. The evaluation of the Performance is compared with other systems using the results of the synthesis for a 16point FIR filter and a 5th order elliptic wave filter, where in most cases, the optimal solution is obtained.

  • PDF

Analysis of the Priority Decision for Establishment Criteria of Environmental Sculptures in Urban Areas (대도시 옥의 환경조형물의 설치기준에 대한 우선순위 분석)

  • Lee, Sang-Seol;lee, Jeong
    • Journal of Environmental Science International
    • /
    • v.9 no.6
    • /
    • pp.489-494
    • /
    • 2000
  • This research focused on the priotity decision for establishment sriteria on the effects which environmental sculptures in urban area. The analysis performed in this study used the AHP(Analytic Hierarchy Process) that is recognized as a useful decision-making tool to select and evaluate alternatives through pairwise comparison in the context of hierarchical decision structure. The results obtained from the analysis drawn by collecting the professional opinions of 5 experts for environmental sculptures are as follows: 1. The orders of establish criteria priorities on environmental sculptures were harmony of environment> symbol> public> function. The harmony of environment was the most important priority because it showed the highest weight of criteria. 2. The alternative priorities of environmental sculptures were the meaning of work>setting place> social contribution> physical quality .The meaning of work showed the highest change in the weight of alternative. 3.The sensitivity analysis of environmental sculptures demonstrated that the rate of change in the alternative priorities of the public was stabilized although the criteria importance varied, while the harmony of environment, the symbol intimated and function of priorities has their rates of weight changed if the criteria priorities were high.

  • PDF

A Study on the Priority Ranking Algorithm for Bridge Management at Network Level (Network Level을 고려한 교량의 우선순위 산정 알고리즘에 관한 연구)

  • Kim Kwang-Soo;Kim Hyeong-Yeol;Park Sun-Kyu
    • Journal of the Korea Concrete Institute
    • /
    • v.17 no.3 s.87
    • /
    • pp.323-328
    • /
    • 2005
  • Bridge structures are properly designed in accordance with the design specifications with required safety margin. However, due to the heavy vehicle traffic and environmental attacks, bridge often requires repairs and the deteriorated one should be replaced or rehabilitated. In this paper, a prior ranking algorithm is proposed to assist a decision making process in bridge management at network level. Based on the literature survey for the existing studuies, two important factors which affect the decision making procedure for bridge management at network level are identified. These factors are implemented into the algorithm as a load carrying capacity function and traffic function, respectively.

A Study on the Application of DFMEA for Safety Design of Weapon System (무기체계의 안전 설계를 위한 DFMEA 적용에 관한 연구)

  • Seo, Yang Woo;Oh, Young Il;Kim, Hee Wook;Kim, So Jung
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.18 no.1
    • /
    • pp.46-57
    • /
    • 2022
  • In this paper, we proposed the DFMEA Implementation Method for safety design of Weapon System. First, we presented the process for DFMEA. And then, the case analysis of OOO missile was performed in accordance with the process presented. After defining the system requirements of OOO missile, failure definition scoring criteria was set. In order to clarify the definition of failure, the failure was classified into safety, reliability, maintainability and others. After performing the function analysis, the relationship matrix analysis was performed to identify the failure mode according to the function without omission. After clarifying the failure classification, mode of failure, cause of failure and effect were analyzed to calculate the severity, occurrence and detection values. After the action priority was judged, the recommended action according to the failure classification was identified for the determined action priority. The results of this study can be used as a relevant basis for the design reflection and resource re-allocation of stakeholders.

A Design for Efficient Similar Subsequence Search with a Priority Queue and Suffix Tree in Image Sequence Databases (이미지 시퀀스 데이터베이스에서 우선순위 큐와 접미어 트리를 이용한 효율적인 유사 서브시퀀스 검색의 설계)

  • 김인범
    • Journal of the Korea Computer Industry Society
    • /
    • v.4 no.4
    • /
    • pp.613-624
    • /
    • 2003
  • This paper proposes a design for efficient and accurate retrieval of similar image subsequences using the multi-dimensional time warping distance as similarity evaluation tool in image sequence database after building of two indexing structures implemented with priority queue and suffix tree respectively. Receiving query image sequence, at first step, the proposed method searches the candidate set of similar image subsequences in priory queue index structure. If it can not get satisfied results, it retrieves another candidate set in suffix tree index structure at second step. The using of the low-bound distance function can remove the dissimilar subsequence without false dismissals during similarity evaluating process between query image sequence and stored sequences in two index structures.

  • PDF

Evaluation of Risk Factors in Water Supply Networks using PROMETHEE and ANP (PROMETHEE와 ANP 기법을 활용한 상수도관망의 위험요소 평가)

  • Hong, Sung-Jun;Lee, Yong-Dae;Kim, Sheung-Kown;Kim, Joong-Hoon
    • IE interfaces
    • /
    • v.19 no.2
    • /
    • pp.106-116
    • /
    • 2006
  • In this study, the priority of risk factors in supplying water through water supply pipeline network was evaluated by PROMETHEE and ANP multi-criteria decision analysis. We chose 'corrosion', 'burst' and 'water pollution' in pipe as major reference criteria and selected eight risk factors to evaluate the priority, and then we compared the results of PROMETHEE with those of ANP. We also analyzed the results of the sensitivity analysis by changing the weights and parameters of preference functions in PROMETHEE. We investigated the possibility of integrating two methods by using the results of ANP as the weights of preference function in PROMETHEE. The priority of risk factors for supplying municipal water which is evaluated by this study may provide basic data to establish a contingency plan for accidents, or to establish the specific emergency response procedures.