• 제목/요약/키워드: priority decision

검색결과 596건 처리시간 0.027초

군 시설사업 우선순위선정을 위한 의사결정모형에 관한 연구 (A Study on the Decision Making Models for Evaluating the Priorities in the Army Facility Enterprise)

  • 정성환;이상헌
    • 한국국방경영분석학회지
    • /
    • 제27권2호
    • /
    • pp.37-55
    • /
    • 2001
  • The main purpose of this study is to review the current system and to develop a decision support system for evaluating the priorities among those possible alternatives in the army facility enterprise. This paper also provides an information system which can be effectively applied to various criteria and stages in decision making process such as Planning and Programming phases in PPBEES. The model base of decision support systems uses the concepts of the analytic hierarchy process along with the supplementary techniques such as TOPSIS and 0-1 integer programming. Both AHP and TOPSIS are used scoring approaches in the Planning phase and IP is induced at the Programming phase to give GO/NO-GO solution for each project. We use Expert Choice, Excel and LINDO s/w's to implement a prototyped model. The proposed methodology in this paper enables the decision makers to evaluate the priority based on quantitative and qualitative data in a systematic way.

  • PDF

간호사와 입원 환자가 지각한 임종기 치료선호도 (Comparing the Preference for Terminal Care in Nurses and Patients)

  • 김동순;소애영;이경숙;최정숙
    • 근관절건강학회지
    • /
    • 제20권3호
    • /
    • pp.214-224
    • /
    • 2013
  • Purpose: The purpose of this study was to identify the differences in preference for terminal care between hospitalized patients and nurses. Methods: A cross-sectional descriptive design was used in 79 patients and 107 nurses. The data were collected from August to October 2011, using the Preference for Care near the End of life Scale - Korean Version (PCEOL-K) with 5-point scale of 26 items. The reliability of the tool was Cronbach's ${\alpha}=.74$. Results: The mean score (SD) of PCEOL-K's sub-dimensions in nurses' priority was: (a) pain $3.70{\pm}0.63$, (b) spirituality $3.63{\pm}0.61$, (c) family $3.40{\pm}0.70$, (d) autonomous decision making $2.30{\pm}0.66$, and (e) decision making by healthcare professionals $2.14{\pm}0.64$. In patients' priority, the $M{\pm}SD$ score of each sub-dimension was: (a) pain $3.86{\pm}0.65$, (b) family $3.83{\pm}0.57$, (c) decision making by healthcare professionals $3.37{\pm}0.85$, (d) spirituality $3.01{\pm}0.80$, and (e) autonomous decision making $2.43{\pm}0.63$. Results indicated significant differences between nurses and patients regarding decision making by healthcare professionals (t=-11.28, p<.001), family (t=-4.66, p<.001), and spirituality (t=5.71, p<.001). Conclusion: The PCEOL-K of patients was higher than nurses'. A terminal care program for hospitalized patients at the end of life should be planned according to the results of PCEOL-K in nurses and patients.

수리시설개보수사업 선정을 위한 의사결정지원모델 (Decision Support Model for Selection Water Resources Facility Improvement Projects)

  • 남송현;박형근
    • 대한토목학회논문집
    • /
    • 제41권4호
    • /
    • pp.449-459
    • /
    • 2021
  • 농업용 저수지의 80 % 이상이 50년 이상 된 노후 시설물로 안전성 및 기능 저하가 발생하고 있다. 이로 인해 저수지의 붕괴 등 안전사고가 발생하고 있는 실정이다. 이에 따라서 저수지의 붕괴 등의 안전사고를 미연에 방지하고자 정밀안전진단을 실시하고 우선순위에 따라 수리시설개보수사업을 시행하고 있다. 하지만 사업 우선순위 선정의 대부분은 시설물 관리자의 주관적인 판단을 통해 이루어지고 있다. 이에 본 연구에서는 정밀안전진단 결과 및 기존의 수리시설 개보수사업의 의사결정 사례를 D/B화하여 80개의 가설을 설정하고 상관분석 및 유의성검정을 통해 45개의 변수를 선정하였다. 선정된 변수들을 로지스틱회귀분석을 이용하여 의사결정지원모델을 제시하였다. 의사결정지원모델의 변수는 총 21개가 채택되었으며 모델의 분류 정확도는 86.8 %로 나타났다. 본 연구는 수리시설개보수사업 선정을 위한 의사결정의 정량적인 지표를 제시 한 부분에 중요한 의의를 가진다.

AHP 기법을 이용한 스타트업의 액셀러레이터 선택 의사결정요인의 상대적 중요도와 우선순위 분석 (Analysis of relative importance and priority of decision-making factors in accelerator selection of startups using AHP technique)

  • 배상완;이동명
    • 디지털융복합연구
    • /
    • 제20권2호
    • /
    • pp.127-140
    • /
    • 2022
  • 최근 액셀러레이터가 새로운 스타트업 육성 기관으로 주목받고 있다. 본 연구는 스타트업이 액셀러레이팅 프로그램을 이용하고자 액셀러레이터를 선택할 때 의사결정요인의 상대적 중요도와 우선순위를 AHP 기법을 이용해 실증 분석하였다. 그 결과 스타트업 창업자는 의사결정요인의 중요도를 자금지원 요인, 프로그램 요인, 액셀러레이터 특성 요인 순으로 인식하고 있었고, 세부 요인 간 상대적 중요도는 스타트업 창업자와 액셀러레이터 종사자 간, 사업장 소재지 및 매출실적 유무에 따라 인식의 차이가 있는 것으로 나타났다. 이는 액셀러레이터의 자금지원 역량 강화와 스타트업의 니즈에 부합하는 맞춤형 서비스 향상의 필요성이 있음을 시사한다. 본 연구가 스타트업이 액셀러레이터를 선택할 때 의사결정기준으로 활용되고 액셀러레이팅 프로그램에 관한 추가 연구의 기초자료로 활용될 수 있을 것이다.

철도망 설계모형을 이용한 설계속도 수준별 고속철도망 투자우선순위 선정 (High-speed Rail Infrastructure Priority Decision Making on Level of Design Speed by Rail Network Design Problem)

  • 박진경;임용택;이준;엄진기;문대섭
    • 한국철도학회논문집
    • /
    • 제12권3호
    • /
    • pp.427-436
    • /
    • 2009
  • 본 연구는 철로를 신설 또는 확장 시 목표로 설정한 지표를 최적화시키는 최적 노선구간을 선정하여 철도망의 네트워크 효과를 고려하는 방법론인 철도망 설계모형(Railway Network Design Problem, RNDP)을 이용하여 설계속도 수준별 고속철도망의 노선축별 분석구간별 투자우선순위를 선정하였다. RNDP의 목적함수를 총 통행시간 최소화로 설정하여 분석한 결과 투자우선순위가 가장 높은 고속철도망 노선축은 서동축이며, 다음으로 서해축, 남해축 순으로 나타났다. 또한 노선축별 최적안은 서동축의 경우 전 구간을 400km/h급으로 신선을 건설하는 대안이, 서해축의 경우 전라선 익산$\sim$여수 구간을 200km/hr급으로 고속화하는 사업을 활용하고 이 구간을 제외한 나머지 신선 구간(송도$\sim$익산)을 400km/h급으로 건설하는 대안인 것으로 분석되었다. 마지막으로 남해축의 경우에는 경전선, 즉 순천$\sim$마산 구간을 200km/hr로 고속화하는 사업을 활용하여 나머지 신선 구간(목포$\sim$순천, 마산$\sim$부산)을 350km/h로 건설하는 대안인 것으로 분석되었다.

환경성 내분비계장애물질(EDCs)의 우선관리순위 결정법 개발 및 적용 (Development and Application of a Chemical Ranking and Scoring System for the Management of Endocrine Disrupting Chemicals)

  • 임미영;박지영;지경희;이기영
    • 한국환경보건학회지
    • /
    • 제44권1호
    • /
    • pp.76-89
    • /
    • 2018
  • Background: Exposure to endocrine disrupting chemicals (EDCs) has been considered one of the main causes of a range of endocrine diseases in modern society. An EDC priority list considering exposure, toxicity, and societal concern should be established for EDC management. Methods: The chemical ranking and scoring (CRS) system for EDCs was based on exposure, toxicity,and societal concern. The exposure score system was based on usage, circulation volume, bioaccumulation, and detection in consumer products. The toxicity score system was based on carcinogenicity and reproductive and developmental toxicity. The societal concern score system was based on domestic or international regulations and mass media reports. Results: A total of 165 EDCs were considered in the CRS system. The top-five priority EDCs were Bis(2-ethylhexyl) phthalate (DEHP), Benzene, Bisphenol A, Dibutyl phthalate (DBP) and Trichloroethylene. Phthalates, bisphenols and parabens were identified as priority chemical groups. Conclusion: We developed a CRS system for EDCs to identify priority EDCs for management. This will be a foundation to provide an EDC management plan based on scientific decision-making.

DBMS 아웃소싱 평가에 관한 연구모형 (A Study on The Evaluation of DBMS Outsourcing)

  • 정희진
    • 경영과정보연구
    • /
    • 제4권
    • /
    • pp.67-88
    • /
    • 2000
  • The purpose of this study is to present models for evaluation and selection of DataBase Management Systems(DBMS) suppliers. The major concern of management is that most decision problems have multiple, usually conflicting, criteria. The fuzzified multiple-objective programming models are given to accomodate the aspiration level and satisfaction level of decision makers. The proposed models are classified into two types, that is, pre-emptive priority and interpolated non-membership function model. Numerical examples illustrating each type of model are presented and the implications of these models are discussed.

  • PDF

PROMETHEE 기법을 이용한 댐 직하류 하천정비사업 투자우선순위 결정 (Determination of Investment Priority for River Improvement Project at Downstream of Dams Using PROMETHEE)

  • 김길호;선승표;여규동;김형수
    • 대한토목학회논문집
    • /
    • 제32권1B호
    • /
    • pp.41-51
    • /
    • 2012
  • 다양한 대안이 고려되는 SOC사업을 종합적으로 진행할 시 투입가능한 재원의 한계는 개별사업의 중요도를 바탕으로 한 투자우선순위를 필요로 한다. 특히, 댐 직하류 하천정비사업과 같이 내재된 가치가 복합적이고 판단기준이 다양한 경우 의사결정의 어려움에 직면할 수 있는데, 이는 다기준의사결정 기법을 활용함으로써 해결할 수 있다. 본 연구에서는 다기준의사결정 기법 가운데 다양한 대안을 고려할 수 있고, 투자우선순위 결정에서 장점이 있는 PROMETHEE을 활용하여 댐 직하류 하천정비사업 33개 대안에 대한 투자우선순위를 결정하였다. 이를 위해 댐 직하류 하천정비사업의 목적과 기능에 입각하여 7가지 세부 평가기준과 평가속성을 결정하였고, 평가기준별 가중치는 AHP 기법에서 제안하는 고유벡터법에 의해 산출하였다. 이를 바탕으로 PROMETHEE를 수행한 결과, 총 33개 대안 가운데 주암조절지댐, 운문댐, 용담댐 순으로 투자우선순위가 높은 것으로 나타났다. 본 연구에서 제시한 댐 직하류 하천정비사업의 투자우선순위는 향후 우선순위가 높은 대안을 대상으로 동시투자 혹은 단계적으로 투자하기 위한 의사결정자의 정책결정에 도움을 줄 것으로 판단된다.

하수관거 평가 및 정비 우선순위 의사결정도구 개발 (Development of sewer condition assessment and rehabilitation decision-making program(SCARD))

  • 한상종;황환국
    • 상하수도학회지
    • /
    • 제29권1호
    • /
    • pp.123-131
    • /
    • 2015
  • A CCTV inspection method has been widely used to assess sewer condition and performance, but Korea lacks a proper decision support system for prioritizing sewer repair and rehabilitation (R&R). The objective of this paper is to introduce the results that we have developed in the Sewer Condition Assessment and Rehabilitation Decision-making (SCARD) Program using MS-EXCEL. The SCARD-Program is based on a standardized defect score for sewer structural and hydraulic assessment. Priorities are ranked based on risk scores, which are calculated by multiplying the sewer severity scores by the environmental impacts. This program is composed of three parts, which are decision-making for sewer condition and performance assessment, decision-making for sewer R&R priority assessment, and decision-making for optimal budget allocation. The SCARD-Program is useful for decision-makers, as it enables them to assess the sewer condition and to prioritize sewer R&R within the limited annual budget. In the future, this program logic will applied to the GIS-based sewer asset management system in local governments.

분리공정 개선을 위한 설계 가이드 우선순위 결정방법론 (A Study on Deciding Priority of Optimal Design Guide for Disassembly Process)

  • 목학수;이재성;조종래
    • 산업공학
    • /
    • 제17권4호
    • /
    • pp.414-425
    • /
    • 2004
  • This study presents the decision of priority for optimal design guide to improve disassembly process. Disassembly process is divided into recognition, transfer and disassembly of assembly point and recognition, transfer and remove of grasp point. Significant influential factors are derived from analyzing the above process. And those factors are used for making the check list to evaluate the properties of parts in each process. Furthermore, the weight with considering disassembly process is also used to determine weight of each process. On the base of the above sequence, qualitative score of disassemblability of each process that is enabled to compare different disassembly processes can be acquired. Ultimately the score helps to decide the priority of design guide for disassembly process.