• 제목/요약/키워드: priority decision

Search Result 599, Processing Time 0.021 seconds

A Comparative Analysis on National Greenhouse Gas Reduction Implementation Strategies Priority Using AHP and ANP (AHP와 ANP를 이용한 부문별 온실가스 감축 이행 방안 중요도 비교 분석)

  • Lee, Sang-Youp;Kim, Kwang-Mo
    • Journal of Environmental Policy
    • /
    • v.14 no.1
    • /
    • pp.33-52
    • /
    • 2015
  • The purpose of this paper is to analyze the sector-specific greenhouse gas reduction implementation strategies priority using the multi-criteria analysis methods (AHP and Feedback ANP). Our analysis demonstrates that the highest priority among the evaluation criteria is given to the feasibility compared to the efficiency and the effectiveness in most of the sectors. In the public and the building sectors, it has been found that the governmental driving force is absolutely crucial in technological dissemination and diffusion. The results and the main findings are as follows. Firstly, the priority of the policy evaluation criteria has been changed by analysis methods. Secondly, the total weight and the priority of each sector's alternatives also have been changed. Finally, the priority of the alternatives for criteria has been changed by the analysis methods.

  • PDF

An open Scheduling Framework for QoS resource management in the Internet of Things

  • Jing, Weipeng;Miao, Qiucheng;Chen, Guangsheng
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.12 no.9
    • /
    • pp.4103-4121
    • /
    • 2018
  • Quality of Service (QoS) awareness is recognized as a key point for the success of Internet of Things (IOT).Realizing the full potential of the Internet of Things requires, a real-time task scheduling algorithm must be designed to meet the QoS need. In order to schedule tasks with diverse QoS requirements in cloud environment efficiently, we propose a task scheduling strategy based on dynamic priority and load balancing (DPLB) in this paper. The dynamic priority consisted of task value density and the urgency of the task execution, the priority is increased over time to insure that each task can be implemented in time. The scheduling decision variable is composed of time attractiveness considered earliest completion time (ECT) and load brightness considered load status information which by obtain from each virtual machine by topic-based publish/subscribe mechanism. Then sorting tasks by priority and first schedule the task with highest priority to the virtual machine in feasible VMs group which satisfy the QoS requirements of task with maximal. Finally, after this patch tasks are scheduled over, the task migration manager will start work to reduce the load balancing degree.The experimental results show that, compared with the Min-Min, Max-Min, WRR, GAs, and HBB-LB algorithm, the DPLB is more effective, it reduces the Makespan, balances the load of VMs, augments the success completed ratio of tasks before deadline and raises the profit of cloud service per second.

A Study on Development Priority of Undeveloped Urban Neighborhood Park in Case of Daegu Metropolitan City (미개발 근린공원의 개발 우선순위 결정 -대구광역시를 대상으로-)

  • 이기철;김경완
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.29 no.1
    • /
    • pp.80-91
    • /
    • 2001
  • The purpose of this research is to provide a basic knowledge to open up for undeveloped park in process of the park policy establishment by setting up the priority of park development and valuation factor, valuation index as well as building a basic material to undeveloped neighborhood park in Daegu Metropolitan City. Thirteen urban neighborhood parks(1,841,663$m^2$) in the Daegu Metropolitan City were selected for this study. Analyzing and reviewing the previous research and literature review were conducted, and the evaluation index and analysis criteria were constructed to decide the development priority of parks. The results of this research are as follows; 1) Following to the result of the expert questionnaire test in order to estimate weight of valuation factors. It had a high score in available population, and estimated amount of the gross compensation, unpurchased land rate. On the other hand park rate of autonomous district, altitude, rate of population increase in autonomous district and a low score. 2) Generally, most f the plain type parks had a high score in the Sea level, land using pattern, an estimated amount of the gross compensation, but hill type parks had a high score the rate of green covered, park area for one person of administration building. 3) Daebong, Soosung, Dosan, 2.28 youth, Kyungnam parks were selected high priority. Soochang, Donsibong, Janggi, Dongin parks were selected middle priority. Bokhyun, Galsan, Manchon, Gusoosan parks, which were selected low priority. This research for undeveloped park is a basic research step to open up. Three many difficult things in shortage of the basic material for building valuation factor and measuring of the method measurement. The application of weight which make a decision importance among the valuation factor should have ore reasonable study and more scientific research from now because there still remains a lot of shortage of positive materials in there.

  • PDF

Suggestion of Priority Decision Method for Performance Evaluation Based on Risk Index for Small and Medium Sized Bridges (위험도 지수 기반 중소규모 교량 성능평가 우선순위 결정 방안 제안)

  • Lee, Hee-Hyun;Shin, Byoung-Gil;Lee, Yeong-Il;Kim, Young-Min
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.6
    • /
    • pp.70-76
    • /
    • 2019
  • This paper presents a methodology for priority decision of performance evaluation of small-and-medium-sized highway bridges. This methodology could be used for establishing a maintenance strategy of those bridges which are not liable to the law of the Special Act on the Safety Control and Maintenance of Establishments and are thought laid under blind spot. The risk index are calculated considering vulnerability and social influence, then the bridges are classified as three types, one requiring immediate evaluation, the other one requiring evaluation within next year, and the third one observing, according to the index. The suggested method was applied to a small bridge under service and its field applicability verified. From this study, it was judged that this methodology could be used appropriately for establishing maintenance strategy and saving the maintenance budget.

Assessment of Port Development Priority with Conflicts among Decision Makers -From the Perspective of Environment-friendly Port Development- (의사결정자의 대립하 항만개발 우선순위 평가 -환경친화적 항만개발의 관점에서-)

  • Jang, Woon-Jae
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.17 no.1
    • /
    • pp.53-60
    • /
    • 2011
  • In this study, the priority was assessed and the compensation relationships were analyzed with regard to the issue of port development with conflicts among decision makers. First, the assessment factors were selected by the relevant literatures on port development, and fuzzy structure modeling was used to select assessment factors via structuralization analysis. Second, the local residents, port users, and local government were chosen as the main port-development related entities, and the analytic hierarchy process was used to calculate the total assessment value. Third, the justice based on majority power rule method was used as an assessment method that would minimize the amount of complaints according to the total assessment results and the alternative selection when a partnership was formed among the assessment entities. Moreover, the compensation issue according to the alternative selection was quantified, and the compensation relationships were analyzed. As a result, it was found that port development in Busan must be the top priority in terms of port development in South Korea, that awareness of environmental issues must be promoted among the port users, and that the local governments must promote environmental incentive policies for Environment-friendly port development.

Modified Watershed Algorithm for Extracting Correct Edge and Reducing Processing Time (정확한 경계 추출 및 수행시간 단축을 위한 개선된 워터쉐드 알고리즘)

  • Park, Dong-In;Kim, Tae-Won;Ko, Yuh-Ho;Choi, Jae-Gark
    • Journal of Korea Multimedia Society
    • /
    • v.13 no.10
    • /
    • pp.1463-1473
    • /
    • 2010
  • In this paper, we propose a modified watershed algorithm to extract more correct edge and reduce processing time. Two new algorithms are proposed in this paper. The first one is applying two conventional watershed expansion methods known as rainfall and immersion simulation jointly. We analyze the advantage and problem of each simulation and then propose a new expansion method that keeps the advantage and removes the problem in order to extract more correct edge and reduce processing time. The second is a new priority decision algorithm to obtain more correct edge of a region. Some zero-crossing points of gradient are expected to be edge of a region but the conventional method has a limitation that it cannot extract those points as edge. Therefore we propose a new priority decision algorithm for watershed in order to get more correct edge. We compare the proposed method with the conventional method through experiments and prove that the proposed method can extract more correct edge of region.

A Study on Priority Evaluation of the Rope-type Platform Safety Door(RPSD) Installation by Multi-criteria Decision Analysis (다기준 분석에 의한 로프형 승강장 안전도어의 설치 우선순위 산정에 관한 연구)

  • Jung, Byung Doo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.3
    • /
    • pp.639-645
    • /
    • 2015
  • Recently, a study on the commercialization of Rope type Platform Safe Door (RPSD) technology has commenced. The study focuses on RPSD, in which a rope screen ascends to allow safe passage from the platform to the transit vehicle in aboveground stations. Currently, a pilot installation has taken in place with Daegu Metro Line 2 in MoonYang station starting from March of 2013. However, there is a need to select an appropriate pilot installation's object for the improvement in the future RPSD. An appropriate designation would correspond with the needs of the railroad corporation and as a historic railway platform with safe facilities. This study tried to usa Analytic Hierarchy Process (AHP) to determine the priority of the KTX stations to attain a list of appropriate designations for future RPSD installations by analyzing the followings: management of the facilities, operational risks, and intent of business projects. As a case study, it was applied to the evaluation of the KTX stations. For the application, it used relative measurement to calculate the weight of upper level structuring, and absolute measurement for low level structuring instead of pairwise comparisons.

The Application of a New "CIDEAR" Model for Selecting and Evaluating Cross Impact R&D Projects (상호영향형 R&D과제군의 평가선정을 위한 새로운 "CIDEAR" 모형의 적용)

  • 박준호;권철신;홍석기
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2003.11a
    • /
    • pp.25-28
    • /
    • 2003
  • The $\ulcorner$CIDEAR$\lrcorner$ model proceeds the following six steps : $\ulcorner$Decision Theory & Evaluation Model$\lrcorner$, $\ulcorner$AR Decision & Evaluation Model$\lrcorner$, $\ulcorner$Resource & Performance Analysis Model$\lrcorner$, $\ulcorner$Cross Impact Assumption Model$\lrcorner$, $\ulcorner$Priority Oder Decision Model$\lrcorner$, and $\ulcorner$Efficiency Cause Analysis Model$\lrcorner$ - In this study, twenty-one R&D projects of a leading company in electronic industry are selected to examine the usefulness of the constructed $\ulcorner$CIDEAR$\lrcorner$ model. Simulation method, Excel, Lindo(Linear Interactive and Discrete Optimizer) and Team EC are used in this case study.

  • PDF

A Study on application limitation of AHP priority vector with Expert measurement (전문가 설문에 의한 AHP 가중치 산출의 적용한계에 관한 연구)

  • Kim, Woong-Yi;Kim, Do-Hyun;Choi, Yun-Chul
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.18 no.3
    • /
    • pp.92-98
    • /
    • 2010
  • The AHP methodology compares criteria, or alternatives with respect to a criterion, in a natural, pairwise mode. AHP has been applied in a wide variety of applications multi objective decision making being just one. If a group of expert with different aspect, they need some way to revise expert group. We proposed the concatenation of expert to survey the AHP pairwise question for multi-attribute decision making. In this paper, we suggest a way to revise the expert's priorities in hierarch using concept of different group opinion.

A Research for Weight Decision of Waterproofing Methods Selection Evaluation Item using the AHP (AHP기법을 이용한 방수공법 선정 평가항목의 가중치 결정에 관한 연구)

  • Choi, Sung-Min;Lim, Jong-Kwon;Oh, Sang-Keun;Seo, Chee-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.205-211
    • /
    • 2008
  • Recently, selects method of waterproofing where is suitable with method and material physical properties, construction technique, Productive technique and specifications and maintenance techniques evaluation for the same evaluation method is coming to be presented. Respects the application which select system is substantial objectively reflects a weight to evaluation item the research for is necessary. This research the evaluation which in order is effective and the decision-making to be possible about technically countermeasures for a quality security from waterproofing materials, method selection processes, clearly responsible dividing of construction and maintenance techniques. A sets weight of evaluation item for right select system, it stratify the causes which affect in priority based on AHP.

  • PDF