• Title/Summary/Keyword: prefabricated building

Search Result 81, Processing Time 0.022 seconds

Vibration analysis and FE model updating of lightweight steel floors in full-scale prefabricated building

  • Petrovic-Kotur, Smiljana P.;Pavic, Aleksandar P.
    • Structural Engineering and Mechanics
    • /
    • v.58 no.2
    • /
    • pp.277-300
    • /
    • 2016
  • Cold-formed steel (CFS) sections are becoming an increasingly popular solution for constructing floors in residential, healthcare and education buildings. Their reduced weight, however, makes them prone to excessive vibrations, increasing the need for accurate prediction of CFS floor modal properties. By combining experimental modal analysis of a full-scale CFS framed building and its floors and their numerical finite element (FE) modelling this paper demonstrates that the existing methods (based on the best engineering judgement) for predicting CFS floor modal properties are unreliable. They can yield over 40% difference between the predicted and measured natural frequencies for important modes of vibration. This is because the methods were adopted from other floor types (e.g., timber or standard steel-concrete composite floors) and do not take into account specific features of CFS floors. Using the adjusted and then updated FE model, featuring semi-rigid connections led to markedly improved results. The first four measured and calculated CFS floor natural frequencies matched exactly and all relevant modal assurance criterion (MAC) values were above 90%. The introduction of flexible supports and more realistic modelling of the floor boundary conditions, as well as non-structural $fa{\c{c}}ade$ walls, proved to be crucial in the development of the new more successful modelling strategy. The process used to develop 10 identified and experimentally verified FE modelling parameters is based on published information and parameter adjustment resulting from FE model updating. This can be utilised for future design of similar lightweight steel floors in prefabricated buildings when checking their vibration serviceability, likely to be their governing design criterion.

Evaluation of Residential Performance in Commercialization of Flexible Unit Infra Free Residential for Disaster (재난 시 대응을 위한 Flexible-Unit형 인프라 프리(임시)주거의 성능평가)

  • Park, Beungyong;Cho, Jinkyun;Jeong, Yongdae;Lee, Wonhak
    • Journal of the Korean Solar Energy Society
    • /
    • v.38 no.6
    • /
    • pp.37-49
    • /
    • 2018
  • In this paper a new kind of unit-prefabricated building is shown. The unit-prefabricated buildings are made up living unit, energy unit, water unit. The design trend implemented the energy insulation, solar PV panels, energy storage system which are maintained for zero energy buildings. We made a prototype for zero energy flexible residential unit. The first step, we was evaluated the physical performance, insulation, airtightness. The second step, we was evaluated energy performance building to design heating and cooling system to combined PV system. As a results, the insulation performance wall was $0.18W/(m^2{\cdot}K)$. The results of air-tightness was 12.13 ACH@50 (1/h). The building energy demand ratings and solar energy generation has the possible to be ballanced.

Analysis of North Korea's Residential Environment Satisfaction According to Construction Method (건축공법에 따른 북한의 주거환경 만족도 분석 연구)

  • Kim, Eun-Young;Baek, Cheong-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.222-223
    • /
    • 2020
  • Recently, as the era of economic cooperation on the Korean Peninsula approaches, the role of the building sector, such as humanitarian reorganization of North Korean housing, is increasing. The purpose of this study is to find out the current location of North Korean housing standards through the North Korean Housing Survey. For the survey, a survey was conducted through 79 North Korean defectors. The main construction methods of North Korean housing are reinforced concrete, steel framed, wooden framed, masonry, and reinforced concrete walled and prefabricated. The residential environment satisfaction items consist of durability, waterproof, heating, ventilation, heat insulation, air tightness, mining, soundproofing, disaster safety, fire safety, and crime prevention. The result is as follows. The housing construction method in North Korea, which lived at that time, consisted of 21 people (30.88%) of reinforced concrete frames, 18 people (26.47%) of wooden frames, 17 people (25%) of masonry walls, 5 people of prefabricated structures (7.35%), and reinforced concrete. Two people (2.94%) were walled. Among these, the wooden frame type had the lowest satisfaction level for each item, and the reinforced concrete had a high level of dissatisfaction in the items of heating, confidentiality, and disaster safety, and the other item had a high level of satisfaction. The masonry wall type has a relatively high satisfaction level in terms of insulation, confidentiality, mining, and disaster safety.

  • PDF

A Comparative Analysis for the Energy Performance of the Prefabricated Residential Modular Spaces (주거용 조립식 단위공간의 유형별 에너지성능 분석)

  • Park, Jongil;Han, Seung-Hoon
    • KIEAE Journal
    • /
    • v.17 no.5
    • /
    • pp.87-94
    • /
    • 2017
  • Purpose: Prefabricated modular space such as a container construction has recently been interested unlike the conventional construction method, and their scale have expanded from small buildings such as cafes, houses and pensions to shopping centers, complex cultural spaces where shows and exhibitions are possible doing. In this way, the container is in the spotlight as an advantage such as mobility, flexibility, correspondence, economic efficiency, recyclability and so on. However, there are no specific guidelines and standard design methods in aspects of structural calculation, functional insulation and environmental configuration. Therefore, as the first step to resolve these problems, this study has focused on the field of environmental performance of container construction, presented appropriate guidelines and searched ways to improve performances. Method: For this study, seven types of the modular building were chosen and compared, and their energy performances have been analyzed using a proven simulation tool. Essential methodology and terminology were examined to estimate and judge their efficiency. Result: In conclusion, energy performances depend on specific configuration of combined unit spaces, and design guidelines cold be set up for promoting their use in the practical field.

Construction Application of a Newly Developed Form-Latticed Prefabricated Steel Reinforced Concrete Column (Form-LPSRC 기둥 개발 및 적용 연구)

  • Baek, Hojin;Lee, Seung-Hwan;Kim, Sooyoung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.487-495
    • /
    • 2014
  • Shortening the construction duration of structural frame work is extremely important because the work accounts for a major percentage of all cost and duration in large projects. For this reason, new construction methods to reduce the duration of structural frame work are being continuously studied and developed. A PSRC composite column, which uses steel angles instead of H-beams, has the advantages of flexural strength and ductility. Moreover, with this PSRC technique, conventional work for reinforcing bars in columns in practice can be skipped. However, one limitation exists in which the form work is still required. This research proposes a Form-LPSRC column method that is prefabricated with the column frame that includes permanent forms attached. Feasibility was examined with mock-up specimens and finally, the technique applied to real practice. Compared to the conventional SRC column method, this study demonstrated that the proposed technique has many advantages in construction duration, cost, quality, safety and environment.

Priority Derivation of Modular House Cost Reduction Factors through Case Analysis (시공사례 분석을 통한 모듈러 주택 원가절감 우선순위 항목 도출)

  • Ryu, Kuk-Mu;Moon, Ye-Ji;Cho, Byoung-Hoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.66-67
    • /
    • 2016
  • Modular construction is attracting attention as the solution of recent problems in construction site. Such as lack of construction workforce, increasing labor costs, work delay due to extreme weather events and strengthening government regulations. However, despite the many advantages, Modular construction has not been activated dueto high construction costs compared to other construction methods. Accordingly, the object of this study is priority derivation of prefabricated house cost reduction factors and use as basic research data. For research performance, we have analyzed the blueprint and bill of quantities of a modular construction based public dormitory which was built in 2013. In result, the proportion of modular construction and on-site construction is 66% and 34%, and the construction cost proportion by activity was devided in to construction(79%), machinery(7%), electricity(5%) and civil(9%). Among these results in order to reduce costs, interior finishing(19.4) steel-frame(16.9%), metal works(13.5%), RC(11.8%), joinery(7.3%) is the order requires focused management.

  • PDF

Effect of vertical reinforcement connection level on seismic behavior of precast RC shear walls: Experimental study

  • Yun-Lin Liu;Sushil Kumar;Dong-Hua Wang;Dong Guo
    • Earthquakes and Structures
    • /
    • v.26 no.6
    • /
    • pp.449-461
    • /
    • 2024
  • The vertical reinforcement connection between the precast reinforced concrete shear wall and the cast-in-place reinforced concrete member is vital to the performance of shear walls under seismic loading. This paper investigated the structural behavior of three precast reinforced concrete shear walls, with different levels of connection (i.e., full connection, partial connection, and no connection), subjected to quasi-static lateral loading. The specimens were subjected to a constant vertical load, resulting in an axial load ratio of 0.4. The crack pattern, failure modes, load-displacement relationships, ductility, and energy dissipation characteristics are presented and discussed. The resultant seismic performances of the three tested specimens were compared in terms of skeleton curve, load-bearing capacity, stiffness, ductility, energy dissipation capacity, and viscous damping. The seismic performance of the partially connected shear wall was found to be comparable to that of the fully connected shear wall, exhibiting 1.7% and 3.5% higher yield and peak load capacities, 9.2% higher deformability, and similar variation in stiffness, energy dissipation capacity and viscous damping at increasing load levels. In comparison, the seismic performance of the non-connected shear wall was inferior, exhibiting 12.8% and 16.4% lower loads at the yield and peak load stages, 3.6% lower deformability, and significantly lower energy dissipation capacity at lower displacement and lower viscous damping.

The Design and Protective Capacity Assessment of the Prefabricated PC Arch Ammo Magazines (아치형 조립식 PC 탄약고 설계 및 방호성능 평가)

  • Park, Jang-Kweon;Lim, Chul-Won;Ryu, Dong-Woo;Son, Ki-Young;Baek, Jong-Hyuk;Park, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.6
    • /
    • pp.615-621
    • /
    • 2014
  • This study suggests the design and assembly drawing of the prefabricated precast concrete arch ammo magazines using the numerical analysis as well as the explosion verification test. The protective capacity of the proposed magazines is identified with the maximum support rotation angles measured by explosion verification tests according to the U.S. Unified Facility Criteria 3-340-02. Using numerical analysis, it is examined that oval-type members are better than the semi-circle ones in terms of protective capacity. Based on this numerical results, the design and assemble drawing for the prefabricated precast concrete arch ammo magazine are developed. It is identified that the structure constructed by invented design and assembly drawing has enough protective capacity against blast pressure caused by 133.75kg TNT explosion. The detonation point cannot be open due to the military security. In sum, it could be concluded that the ammo magazine proposed in this study has reliable protective capacity with enough redundancy. The redundancy means that there are more economic design approach with reducing the curved wall thickness.

A Study on the Reduction Plan About Prefabricated Wall Construction Error Rates for BIM-based Modular Construction (BIM기반 모듈러 건축의 조립식 벽체 시공 오차율 저감방안에 대한 연구)

  • Suh, Bong-Gyo;Bae, Seong-Jae;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.213-214
    • /
    • 2013
  • Recently, modular construction has been begun to introduce actively for improvment of productivity in the construction industry. By the way, the construction technology is being IT through BIM. This is why modular construction needs BIM technology. In this study, we analyze the problems in the current modular construction at factory production stage. The way to extract 3D shop drawings using BIM is suggested to solve this problem.

  • PDF

Case Study : BIM for Planning, Simulating, and Implementing Complex Site Logistics

  • Kim, JongHoon;Cohen, Fernando Castillo
    • Journal of KIBIM
    • /
    • v.5 no.4
    • /
    • pp.47-52
    • /
    • 2015
  • This paper presents a case study using Building Information Modeling (BIM) for planning, simulating, and implementing complex site logistics in a headquarter office building construction project in Silver Spring, MD. As part of the project a prefabricated 92ft structural tube steel pedestrian connector bridge was installed between two adjacent buildings in the city of Silver Spring, MD. There were multiple significant challenges to deliver, offload, prepare, and install the connector bridge safely, on time, and with the minimum disturbances to the neighbors. BIM was of the foremost importance to visualize, simulate, analyze, improve, and communicate the site logistics plan from delivery to installation of the connector bridge. As a result of the effort, GC of the project was able to prepare a highly detailed plan, communicate it effectively to all stakeholders, and flawlessly execute the work as planned. This case study would provide a useful reference for contractors who are seeking a better planning method that enables generation of more accurate, implementable, optimized plans for complex site logistics.