• 제목/요약/키워드: precedence diagram

검색결과 10건 처리시간 0.021초

보-기둥구조 PC공동주택 골조공사 작업관계 분석 (Relationship Analysis of Field Work in Beam-Column System Frame Work of the Precast Concrete Public Apartment Building)

  • 김기호;김진원;김민준;이동건;손정락;이범식
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 가을 학술논문 발표대회
    • /
    • pp.41-42
    • /
    • 2022
  • This study analyzed the process related to the linkage between on-site work targeting the middle size Precast Concrete(PC) public apartment building with beam-column system and prepared on-site works flow relationship diagram in which the wet process consists of core Critical Path(CP) to prepare a network diagram of the Precedence Diagram Method(PDM). Through this study, it is expected that it will be possible to maximize the project management capability by suggesting a method to minimize risk factors and the optimized process management of the beam-column system PC public apartment building.

  • PDF

Spatiotemporal chronographical modeling of procurement and material flow for building projects

  • Francis, Adel;Miresco, Edmond;Le Meur, Erwan
    • Advances in Computational Design
    • /
    • 제4권2호
    • /
    • pp.119-139
    • /
    • 2019
  • Planning and management building projects should tackle the coordination of works and the management of limited spaces, traffic and supplies. Activities cannot be performed without the resources available and resources cannot be used beyond the capacity of workplaces. Otherwise, workspace congestion will negatively affect the flow of works. Better on-site management allows for substantial productivity improvements and cost savings. The procurement system should be able to manage a wider variety of materials and products of the required quality in order to have less stock, in less time, using less space, with less investment and avoiding multiple storage stations. The objective of this paper is to demonstrate the advantages of using the Chronographic modeling, by combining spatiotemporal technical scheduling with the 4D simulations, the Last Planner System and the Takt-time when modeling the construction of building projects. This paper work toward the aforementioned goal by examining the impact that material flow has on site occupancy. The proposed spatiotemporal model promotes efficient site use, defines optimal site-occupancy and workforce-rotation rates, minimizes intermediate stocks, and ensures a suitable procurement process. This paper study the material flow on the site and consider horizontal and vertical paths, traffic flows and appropriate means of transportation to ensure fluidity and safety. This paper contributes to the existing body of knowledge by linking execution and supply to the spatial and temporal aspects. The methodology compare the performance and procurement processes for the proposed Chronographic model with the Gantt-Precedence diagram. Two examples are presented to demonstrate the benefits of the proposed model and to validate the related concepts. This validation is designed to test the model's graphical ability to simulate construction and procurement.

Development of a Neural Network for Optimization and Its Application to Assembly Line Balancing

  • Hong, Dae-Sun;Ahn, Byoung-Jae;Shin, Joong-Ho;Chung, Won-Jee
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2003년도 ICCAS
    • /
    • pp.587-591
    • /
    • 2003
  • This study develops a neural network for solving optimization problems. Hopfield network has been used for such problems, but it frequently gives abnormal solutions or non-optimal solutions. Moreover, it takes much time for solving a solution. To overcome such disadvantages, this study adopts a neural network whose output nodes change with a small value at every evolution, and the proposed neural network is applied to solve ALB (Assembly Line Balancing) problems . Given a precedence diagram and a required number of workstations, an ALB problem is solved while achieving even distribution of workload among workstations. Here, the workload variance is used as the index of workload deviation, and is reflected to an energy function. The simulation results show that the proposed neural network yields good results for solving ALB problems with high success rate and fast execution time.

  • PDF

원자력연구개발사업의 공정관리 적용 사례 연구 (A Study on the Application of Scheduling & Planning for Nuclear R &D Projects : Cas of LMR Project)

  • 한도희
    • 기술혁신학회지
    • /
    • 제2권3호
    • /
    • pp.118-128
    • /
    • 1999
  • This study attempts to provide an efficient method for managing the Nuclear R&D projects. It should be noted that the technology and experiences to develop a well-balanced plan and mon-itoring for the R&D project are not yet well established when compared with the commercial con-structionand engineering projects. This study recommends that the R&D project manager utilize the scheduling techniques to establish an integral management system taking in to account the un-certainties in the research environment. Based upon the results of a case study for the Liquid Metal Reactor Design Technology Development Project which is led by the KAERI this study also con-firms that it is possible to run the national nuclear R&D projects with the Scheduling & Planning.

  • PDF

변전설비의 구조적 중요도와 고장 분석을 통한 유지보수 우선순위 선정 (Decision of Maintenance Priority Order for Substation Facility through Structural Importance and Fault Analysis)

  • 이성훈;이윤성;김진오
    • 조명전기설비학회논문지
    • /
    • 제27권4호
    • /
    • pp.23-30
    • /
    • 2013
  • Reliability Centered Maintenance(RCM) is one of most widely used methods in the modern power system to schedule a maintenance cycle and determine the priority of inspection. A precedence study for the new structure of rearranged system should be performed due to introduction of additional installation. This paper proposes a new method to evaluate the priority of maintenance and inspection of the power system facilities. In order to calculate that risk index, it is required that the reliability block diagram should be analyzed for the power system. Additionally, a fault cause analysis is also performed through the event-tree analysis.

시장지향적 접근법에 의한 E-비즈니스 커리큘럼 개발 (Development of I-business Curriculum Using Market-Oriented Approach)

  • 전종근;조재균;정석찬;박기남
    • 한국전자거래학회지
    • /
    • 제7권2호
    • /
    • pp.97-111
    • /
    • 2002
  • E-business curriculum needs to be developed reflecting requirements of the industry which involve a close relation with a job performed in the field, and a professional knowledge and an expert skill. In this paper, we present a method based on a market-oriented approach for developing an I-business curriculum. For the purpose, we analyze the opinion data resulting from the surveyed opinions of respondents working for I-business companies and evaluate the importance of each course being involved in the curriculum with respect to the job classification (e.g., Web planner, Web master, Web programmer, Web marketer, Web designer, Web PD), and then, complete a flow diagram considering precedence and relative difficulty among the selected courses. The E-business curriculum developed by the proposed method is useful to provide guidelines for determining courses required toward a desired job and for making a partial amendment of the curriculum.

  • PDF

식혜(食醯) 생산(生産)라인의 공정(工程)/배치(配置) 설계(設計)에 대한 사례 연구 (A Case Study for a Process/Layout Design of a Sikhye Production Line)

  • 양문희
    • 산업공학
    • /
    • 제16권4호
    • /
    • pp.450-462
    • /
    • 2003
  • In this paper, we deal with a process and layout design for producing a planned amount of Sikhye in a given limited time period under a reasonable production schedule. We represent a Sikhye production line as a vector N, the element of which denotes the number of tanks required in each process and our objective is to find an appropriate vector which minimizes the total investment cost. We suggest a systematic method for finding an appropriate N and an appropriate layout to N. In detail, first, we decide the required sequence of processes and the required operations for each process and we estimate standard operating times. Second, constructing a precedence diagram, we find a critical path in order to reduce the total production lead time for a batch of Sikhye. Third, given a limited N space, we manage to construct manually each production schedule using both the processing times of the critical operations and transfer times. Finally, we find an optimal vector N which gives a minimum investment cost and meets both the time constraint and quantity constraint. In addition, with the estimated relative size of each tank, we suggest an appropriate conceptual layout design including an expansion area for future demands, based on the span technique used in the field of architectural design.

교육품질 향상을 위한 e-비즈니스 커리큘럼개발에 QFD와 컨조인트분석의 실증적 적용에 관한 연구 (The Study on Empirical Application of QFD and Conjoint Analysis to e-business Curriculum Development for the Advance of Educational Quality)

  • 박기남;조재균;정석찬;전종근
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2002년도 춘계공동학술대회
    • /
    • pp.678-685
    • /
    • 2002
  • e-business curriculum needs to be developed reflecting requirements of the stakeholder which involve a close relation with a industrial and educational job performed in the field. In this paper, we present a new methodology for developing a market-oriented and stakeholder-led e-business curriculum using quality function deployment(QFD) and conjoint analysis. For this purpose, we analyze the data resulting from the surveyed opinions of respondents working for e-business companies, the interviewed results with professors and students and evaluate the importance of each course being involved in the curriculum with respect to the job classification (e.g.. Web planner. Web master. Web programmer. Web marketer. Web designer), and then. complete a curriculm flow diagram(CFD) considering precedence and relative difficulty among the selected courses. The e-business curriculum developed by the proposed method is useful to provide guidelines for determining courses required toward a desired job and for making a partial amendment of the curriculum.

  • PDF

작업공간과 자원의 여유시간 최소화를 통한 반복작업 공정계획기법 (Network Compression by Saying Idle Time of Resources and Spaces for Repetitive Activities)

  • 이규진
    • 한국건설관리학회논문집
    • /
    • 제1권3호
    • /
    • pp.75-80
    • /
    • 2000
  • 공간의 분할이 많은 건축공사에서는 반복적 특성으로 인해 공정계획상에 다수의 대안이 존재한다. 공사기간은 각 액티비티의 기간뿐 아니라 반복되는 액티비티의 배열방법에 의해서도 많은 영향을 받는다. 본 연구는 각 액티비티에 적정한 선행 액티비티를 할당함으로써 여유시간을 최소화하는 공정계획기법을 제시하는 것을 목적으로 진행되었다. Line of Balance 기법을 기본으로 하는 기존연구와는 달리 본 연구에서는 AON방식의 네트워크 기법을 기본으로 하여 공간과 자원의 두 축 사이에 액티비티를 배열하였다. 각 액티비티별로 자원과 공간의 양방향으로 가장 적절한 선행 액티비티를 검색하여 여유시간을 최소화한다. 본 연구에서 제시한 액티비티 배열방법을 공동주택공사 건설공사를 대상으로 적용한 결과, 액티비티 배열을 달리함에 따라서 다수의 대안이 존재함을 확인할 수 있었으며 그중 적정대안을 찾아낼 수 있었다. 본 기법은 공동주택공사와 같은 다수의 유사공간으로 구성된 건설공사의 공정 계획에 도움을 줄 수 있을 것으로 판단된다.

  • PDF

양측 조립라인 균형문제의 병렬군집 알고리즘 (Parallel Clustering Algorithm for Balancing Problem of a Two-sided Assembly Line)

  • 이상운
    • 한국인터넷방송통신학회논문지
    • /
    • 제22권1호
    • /
    • pp.95-101
    • /
    • 2022
  • NP-난제로 알려진 양측 조립라인 균형문제는 주로 메타휴리스틱 방법들을 적용하여 해를 구하고 있다. 본 논문은 총 작업완료시간 W와 순환시간 c가 주어진 양측 조립라인의 선행순서도에서 좌측, 우측과 좌·우측 무관으로 공정들을 분류하고, 좌측과 우측 각각에 대해 M* = ${\lceil}$W/c${\rceil}$개의 작업대에 Ti = c* ± α < c, c* = ${\lceil}$W/m*${\rceil}$이 되도록 공정들을 할당하는 병렬군집 알고리즘을 제안하였다. 제안된 알고리즘을 4개의 실험데이터, 17개의 c에 적용한 결과, 기존의 메타휴리스틱 방법들에 비해 최소 작업대 수 m*를 구하였으며, Tmax < c로 순환시간을 단축하였다. 또한, 제안된 알고리즘은 휴리스틱 방법임에도 불구하고, 조립라인 효율성의 극대화와 작업자간 작업시간 편차를 최소화시킬 수 있었다.