• Title/Summary/Keyword: precedence diagram

Search Result 10, Processing Time 0.023 seconds

Relationship Analysis of Field Work in Beam-Column System Frame Work of the Precast Concrete Public Apartment Building (보-기둥구조 PC공동주택 골조공사 작업관계 분석)

  • Kim, Ki-Ho;Kim, Jin-Won;Kim, MIn-Jun;Lee, Dong-Gun;Sohn, Jeong-Rak;Lee, Bum-Sik
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.41-42
    • /
    • 2022
  • This study analyzed the process related to the linkage between on-site work targeting the middle size Precast Concrete(PC) public apartment building with beam-column system and prepared on-site works flow relationship diagram in which the wet process consists of core Critical Path(CP) to prepare a network diagram of the Precedence Diagram Method(PDM). Through this study, it is expected that it will be possible to maximize the project management capability by suggesting a method to minimize risk factors and the optimized process management of the beam-column system PC public apartment building.

  • PDF

Spatiotemporal chronographical modeling of procurement and material flow for building projects

  • Francis, Adel;Miresco, Edmond;Le Meur, Erwan
    • Advances in Computational Design
    • /
    • v.4 no.2
    • /
    • pp.119-139
    • /
    • 2019
  • Planning and management building projects should tackle the coordination of works and the management of limited spaces, traffic and supplies. Activities cannot be performed without the resources available and resources cannot be used beyond the capacity of workplaces. Otherwise, workspace congestion will negatively affect the flow of works. Better on-site management allows for substantial productivity improvements and cost savings. The procurement system should be able to manage a wider variety of materials and products of the required quality in order to have less stock, in less time, using less space, with less investment and avoiding multiple storage stations. The objective of this paper is to demonstrate the advantages of using the Chronographic modeling, by combining spatiotemporal technical scheduling with the 4D simulations, the Last Planner System and the Takt-time when modeling the construction of building projects. This paper work toward the aforementioned goal by examining the impact that material flow has on site occupancy. The proposed spatiotemporal model promotes efficient site use, defines optimal site-occupancy and workforce-rotation rates, minimizes intermediate stocks, and ensures a suitable procurement process. This paper study the material flow on the site and consider horizontal and vertical paths, traffic flows and appropriate means of transportation to ensure fluidity and safety. This paper contributes to the existing body of knowledge by linking execution and supply to the spatial and temporal aspects. The methodology compare the performance and procurement processes for the proposed Chronographic model with the Gantt-Precedence diagram. Two examples are presented to demonstrate the benefits of the proposed model and to validate the related concepts. This validation is designed to test the model's graphical ability to simulate construction and procurement.

Development of a Neural Network for Optimization and Its Application to Assembly Line Balancing

  • Hong, Dae-Sun;Ahn, Byoung-Jae;Shin, Joong-Ho;Chung, Won-Jee
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2003.10a
    • /
    • pp.587-591
    • /
    • 2003
  • This study develops a neural network for solving optimization problems. Hopfield network has been used for such problems, but it frequently gives abnormal solutions or non-optimal solutions. Moreover, it takes much time for solving a solution. To overcome such disadvantages, this study adopts a neural network whose output nodes change with a small value at every evolution, and the proposed neural network is applied to solve ALB (Assembly Line Balancing) problems . Given a precedence diagram and a required number of workstations, an ALB problem is solved while achieving even distribution of workload among workstations. Here, the workload variance is used as the index of workload deviation, and is reflected to an energy function. The simulation results show that the proposed neural network yields good results for solving ALB problems with high success rate and fast execution time.

  • PDF

A Study on the Application of Scheduling & Planning for Nuclear R &D Projects : Cas of LMR Project (원자력연구개발사업의 공정관리 적용 사례 연구)

  • 한도희
    • Journal of Korea Technology Innovation Society
    • /
    • v.2 no.3
    • /
    • pp.118-128
    • /
    • 1999
  • This study attempts to provide an efficient method for managing the Nuclear R&D projects. It should be noted that the technology and experiences to develop a well-balanced plan and mon-itoring for the R&D project are not yet well established when compared with the commercial con-structionand engineering projects. This study recommends that the R&D project manager utilize the scheduling techniques to establish an integral management system taking in to account the un-certainties in the research environment. Based upon the results of a case study for the Liquid Metal Reactor Design Technology Development Project which is led by the KAERI this study also con-firms that it is possible to run the national nuclear R&D projects with the Scheduling & Planning.

  • PDF

Decision of Maintenance Priority Order for Substation Facility through Structural Importance and Fault Analysis (변전설비의 구조적 중요도와 고장 분석을 통한 유지보수 우선순위 선정)

  • Lee, Sung-Hun;Lee, Yun-Seong;Kim, Jin-O
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.27 no.4
    • /
    • pp.23-30
    • /
    • 2013
  • Reliability Centered Maintenance(RCM) is one of most widely used methods in the modern power system to schedule a maintenance cycle and determine the priority of inspection. A precedence study for the new structure of rearranged system should be performed due to introduction of additional installation. This paper proposes a new method to evaluate the priority of maintenance and inspection of the power system facilities. In order to calculate that risk index, it is required that the reliability block diagram should be analyzed for the power system. Additionally, a fault cause analysis is also performed through the event-tree analysis.

Development of I-business Curriculum Using Market-Oriented Approach (시장지향적 접근법에 의한 E-비즈니스 커리큘럼 개발)

  • 전종근;조재균;정석찬;박기남
    • The Journal of Society for e-Business Studies
    • /
    • v.7 no.2
    • /
    • pp.97-111
    • /
    • 2002
  • E-business curriculum needs to be developed reflecting requirements of the industry which involve a close relation with a job performed in the field, and a professional knowledge and an expert skill. In this paper, we present a method based on a market-oriented approach for developing an I-business curriculum. For the purpose, we analyze the opinion data resulting from the surveyed opinions of respondents working for I-business companies and evaluate the importance of each course being involved in the curriculum with respect to the job classification (e.g., Web planner, Web master, Web programmer, Web marketer, Web designer, Web PD), and then, complete a flow diagram considering precedence and relative difficulty among the selected courses. The E-business curriculum developed by the proposed method is useful to provide guidelines for determining courses required toward a desired job and for making a partial amendment of the curriculum.

  • PDF

A Case Study for a Process/Layout Design of a Sikhye Production Line (식혜(食醯) 생산(生産)라인의 공정(工程)/배치(配置) 설계(設計)에 대한 사례 연구)

  • Yang, Moon-Hee
    • IE interfaces
    • /
    • v.16 no.4
    • /
    • pp.450-462
    • /
    • 2003
  • In this paper, we deal with a process and layout design for producing a planned amount of Sikhye in a given limited time period under a reasonable production schedule. We represent a Sikhye production line as a vector N, the element of which denotes the number of tanks required in each process and our objective is to find an appropriate vector which minimizes the total investment cost. We suggest a systematic method for finding an appropriate N and an appropriate layout to N. In detail, first, we decide the required sequence of processes and the required operations for each process and we estimate standard operating times. Second, constructing a precedence diagram, we find a critical path in order to reduce the total production lead time for a batch of Sikhye. Third, given a limited N space, we manage to construct manually each production schedule using both the processing times of the critical operations and transfer times. Finally, we find an optimal vector N which gives a minimum investment cost and meets both the time constraint and quantity constraint. In addition, with the estimated relative size of each tank, we suggest an appropriate conceptual layout design including an expansion area for future demands, based on the span technique used in the field of architectural design.

The Study on Empirical Application of QFD and Conjoint Analysis to e-business Curriculum Development for the Advance of Educational Quality (교육품질 향상을 위한 e-비즈니스 커리큘럼개발에 QFD와 컨조인트분석의 실증적 적용에 관한 연구)

  • Park Gi Nam;Jo Jae Gyun;Jeong Seok Chan;Jeon Jong Geun
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2002.05a
    • /
    • pp.678-685
    • /
    • 2002
  • e-business curriculum needs to be developed reflecting requirements of the stakeholder which involve a close relation with a industrial and educational job performed in the field. In this paper, we present a new methodology for developing a market-oriented and stakeholder-led e-business curriculum using quality function deployment(QFD) and conjoint analysis. For this purpose, we analyze the data resulting from the surveyed opinions of respondents working for e-business companies, the interviewed results with professors and students and evaluate the importance of each course being involved in the curriculum with respect to the job classification (e.g.. Web planner. Web master. Web programmer. Web marketer. Web designer), and then. complete a curriculm flow diagram(CFD) considering precedence and relative difficulty among the selected courses. The e-business curriculum developed by the proposed method is useful to provide guidelines for determining courses required toward a desired job and for making a partial amendment of the curriculum.

  • PDF

Network Compression by Saying Idle Time of Resources and Spaces for Repetitive Activities (작업공간과 자원의 여유시간 최소화를 통한 반복작업 공정계획기법)

  • Yi Kyoo Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.3 s.3
    • /
    • pp.75-80
    • /
    • 2000
  • In scheduling multi-unit projects, several alternatives can exist in network construction due to repetitiveness of their activities. Project duration is affected not only by the duration of each activity but also by the arrangement of repeating activities in such projects. This paper provides a network compression method that assigns predecessors to each activity to minimize its float time. Different to the previous efforts that utilized line of balance as the base scheduling-model, this research adopts precedence diagram arranged in two coordinates, the space axis and the resource one. This method seeks the most appropriate predecessors for each activity in each direction of the two coordinates for the purpose of minimizing the idle resource and space. This activity arrangement method was applied to a multi-unit apartment-construction project, to prove its capability of network compression. The result shows that the method successfully sought room for saving construction duration by changing the activity arrangement. The network compression method presented in this research can be utilized in multi-unit construction projects such as apartment complex projects.

  • PDF

Parallel Clustering Algorithm for Balancing Problem of a Two-sided Assembly Line (양측 조립라인 균형문제의 병렬군집 알고리즘)

  • Lee, Sang-Un
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.22 no.1
    • /
    • pp.95-101
    • /
    • 2022
  • The two-sided assembly line balancing problem is a kind of NP-hard problem. This problem primarily can be solved metaheuristic method. This paper suggests parallel clustering algorithm that each left and right-sided workstation assigned by operations with Ti = c* ± α < c, c* = ${\lceil}$W/m*${\rceil}$ such that M* = ${\lceil}$W/c${\rceil}$ for precedence diagram of two-sided assembly line with total complete time W and cycle time c. This clustering performs forward direction from left to right or reverse direction from right to left. For the 4 experimental data with 17 cycle times, the proposed algorithm can be obtain the minimum number of workstations m* and can be reduce the cycle time to Tmax < c then metaheuristic methods. Also, proposed clustering algorithm maximizes the line efficiency and minimizes the variance between workers operation times.