• Title/Summary/Keyword: power river

Search Result 288, Processing Time 0.027 seconds

Monthly Water Balance Analysis of Hwanggang Dam Reservoir for Imjin river in Border Area using Optical Satellite (광학위성을 활용한 임진강 접경지역 황강댐 저수지의 월단위 물수지 분석)

  • KIM, Jin-Gyeom;KANG, Boo-Sik;YU, Wan-Sik;HWANG, Eui-Ho
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.24 no.4
    • /
    • pp.194-208
    • /
    • 2021
  • The Hwanggang Dam in North Korea is located upstream of the Imjin River which is a shared river in the border area. It is known to have a reservoir capacity of 350 million cubic meters and releases a discharge primarily for generating hydroelectric power and partly for transferring to the Yesung River basin. Due to the supply of water from the Hwanggang Dam to another basin, the flow of the Imjin River has decreased, which has a negative impact on the water supply, river maintenance flow, water quality, and ecological environment in Korea. However, due to the special national security issue of the South and North Korea border region, the hydrological data is not shared, and the operation method of the Hwanggang Dam is unknown, so there is a risk of damage to the southern part of the downstream area. In this study, the monthly diversion as the long-term runoff concept was derived through the calibrated hydrological model based on optical remotely sensed Images and water balance analysis. As a result of the water balance analysis from January 2019 to September 2021, the average diversion of the Hwanggang Dam was 29.2m3/s, which is equivalent to 922 million tons per year and 45.6% of the annual inflow of 2.02 million tons into the Hwanggang Dam.

Seasonal variation in longitudinal connectivity for fish community in the Hotancheon from the Geum River, as assessed by environmental DNA metabarcoding

  • Hyuk Je Lee;Yu Rim Kim;Hee-kyu Choi;Seo Yeon Byeon;Soon Young Hwang;Kwang-Guk An;Seo Jin Ki;Dae-Yeul Bae
    • Journal of Ecology and Environment
    • /
    • v.48 no.1
    • /
    • pp.32-48
    • /
    • 2024
  • Background: Longitudinal connectivity in river systems strongly affects biological components related to ecosystem functioning, thereby playing an important role in shaping local biodiversity and ecosystem health. Environmental DNA (eDNA)-based metabarcoding has an advantage of enabling to sensitively diagnose the presence/absence of species, becoming an efficient/effective approach for studying the community structure of ecosystems. However, little attention has been paid to eDNA-based biomonitoring for river systems, particularly for assessing the river longitudinal connectivity. In this study, by using eDNA we analyzed and compared species diversity and composition among artificial barriers to assess the longitudinal connectivity of the fish community along down-, mid- and upstream in the Hotancheon from the Geum River basin. Moreover, we investigated temporal variation in eDNA fish community structure and species diversity according to season. Results: The results of species detected between eDNA and conventional surveys revealed higher sensitivity for eDNA and 61% of species (23/38) detected in both methods. The results showed that eDNA-based fish community structure differs from down-, mid- and upstream, and species diversity decreased from down to upstream regardless of season. We found that there was generally higher species diversity at the study sites in spring (a total number of species across the sites [n] = 29) than in autumn (n = 27). Nonmetric multidimensional scaling and heatmap analyses further suggest that there was a tendency for community clusters to form in the down-, mid- and upstream, and seasonal variation in the community structure also existed for the sites. Dominant species in the Hotancheon was Rhynchocypris oxycephalus (26.07%) regardless of season, and subdominant species was Nipponocypris koreanus (16.50%) in spring and Odontobutis platycephala (15.73%) in autumn. Artificial barriers appeared to negatively affect the connectivity of some fish species of high mobility. Conclusions: This study attempts to establish a biological monitoring system by highlighting the versatility and power of eDNA metabarcoding in monitoring native fish community and further evaluating the longitudinal connectivity of river ecosystems. The results of this study suggest that eDNA can be applied to identify fish community structure and species diversity in river systems, although some shortcomings remain still need to be resolved.

Depositional Landforms in Jiwoo Drainage Basin (지우천 유역의 퇴적지형 연구)

  • Oh, In-Sun
    • Journal of the Korean association of regional geographers
    • /
    • v.15 no.2
    • /
    • pp.192-203
    • /
    • 2009
  • The purpose of this paper is to elucidate the formative processes of depositional landforms in Jiwoo drainage basin which located in the most upstream reach of Namgang River. Through the analysis of morphologic characteristics and sedimentary facies, the formative processes can be summarized as follow: First, the high depositional landforms(Sapyeong, Eungam, Naedongdyttle site) were formed by gelifluction process in the periglacial environment during the last glacial period. And the relative height over river bed of them is getting lower from upper to downstream. The extent of the high depositional landforms is assumed about 1 kilometer downstream far from the confluence of Jiwoo stream and Namgang River. Second, the sediments in the gentle slope at Jangseungbuldle were carried by gelifluction process during the last glacial stage after the deep-weathered bedrock had formed a gentle slope. Third, the high depositional landforms were dissected during warm and humid environment of postglacial stage, and some sediments of them were left in the river bed. Later, as the more upstream high depositional landforms were dissected completely, stream power was getting more than resistance(sediment storage) and the low depositional landforms(Sapyeong, Yongchusa, Deungbangdle site) were formed.

  • PDF

The design of 111m high steel towers with 220kv double circuits crossing 12 km wide Bangladesh River (230KV 2회선승 111M 높이 철탑설계 (I) (강폭 12km인 Bangladesh Jamana강 횡단용))

  • 이재숙
    • Journal of the Korean Professional Engineers Association
    • /
    • v.15 no.4
    • /
    • pp.12-24
    • /
    • 1982
  • East Parts of Bangladesh have been benifited by low cost energy generated by domestic natural gas but West parts where energy generated by imported fuel. Bangladesh Government authority has very much concerned to transmit the low cost electricity to the West from the East for past several years. To solve such concerns, cross-country 230kv double circuits Power transmission line was proposed, however there was a big obstacle for the realization of this line to cross the Jamuna river which has 12 km long width with a deep muddy river bed. A consultant engineering firm named Merz-Mclellan anyway finalized this plan and a world-wide bid was announced on June 31, 1979. Due to the expected difficulty to construct the towers on sea like area, only three construction groups have participated. including a Korean joint venture organization of Samsung-Korean Developement corporation-Kolon Electric Machinery company. After 3 months bid evaluation, contract was awarded to Korean Consosium and KEM Co was in charge of designing steel towers with anchor bolts and base plates beside to electrical engineering field. Then KEM Co have faced and over-comed many unenpected technical difficulties such as forced eccentricity joint on base plate, distorsion issue of 60mm thick plates welding, threading anchor bolts, tad heat treatment of some anchor bolts, disagreement from Consultant Engineer on multiplying factor of leg stresses for 45$^{\circ}$ wind and on reducing O.L.F for wind loads on cables for such 1220km long spans. After spending two years long period for designing and engineering towers, base plates, and anchor bolts, first shipment of tower was finally realized on Nov. 8, 1981 and on the other hand KDD has proceeded concrete caisson work on schedule at Jamuna river site and expected to complete tower erection and stringing of cables within this year of 1982 which was original completion target.

  • PDF

Evaluation of Organic Matter and Trace Metal Contamination in Surface Sediments around the Geum River Estuary using Sediment Quality Guidelines (퇴적물 오염기준을 이용한 금강 하구역 표층 퇴적물내 유기물 및 미량금속 오염 평가)

  • Hwang, Dong-Woon;Lee, In-Seok;Choi, Minkyu;Kim, Sook-Yang;Choi, Hee-Gu
    • Korean Journal of Fisheries and Aquatic Sciences
    • /
    • v.46 no.6
    • /
    • pp.930-940
    • /
    • 2013
  • We evaluated contamination with organic matter and trace metals by analyzing grain size, ignition loss (IL), chemical oxygen demand (COD), acid volatile sulfide (AVS), and trace metals (Al, Fe, Cu, Pb, Zn, Cd, Ni, Cr, Mn, Hg, and As) in surface sediments at 28 stations around the Geum River estuary in July 2008. The surface sediments in the estuary were mainly composed of coarse sediment (sand and muddy sand), with mean grain size (Mz) ranging between $2-4{\O}$. The high concentrations of IL, COD, and trace metals were mainly found at stations in front of the Gusan outer port and industrial complex, and near the Seocheon coast with relatively fine sediments. In addition, the concentrations of IL and all trace metals, except Pb and As, showed good positive correlations with Mz, indicating that the concentrations of organic matter and trace metals were mainly dependent on sediment grain size. The concentrations of COD, AVS, and trace metals in most sediments did not exceed the sediment quality guideline (SQGs). Although the sediments in the study region are not polluted with organic matter and trace metals, there are many point sources of pollutants, such as Gusan port and industrial complex, Janghang refinery, and a thermoelectric power plant around the Geum River estuary. Thus, the management of coastal environments through periodic monitoring of organic matter and trace metals is required in the future.

Deriving Channel Width-discharge Relationship from Remote Sensing Imagery and Digital Elevation Models (원격영상자료와 수치고도모형으로부터 하폭-유량 관계식 도출)

  • Kim, Jong Chun;Paik, Kyungrock
    • Journal of Korea Water Resources Association
    • /
    • v.48 no.8
    • /
    • pp.685-693
    • /
    • 2015
  • We propose a method for deriving the relationship between channel width and discharge from remote sensing products. Stream widths at points distributed along a river network can be measured from high-resolution remote imagery. Further, corresponding drainage area for these points can be calculated using digital elevation models, making it possible to construct width-drainage area relation. On the other hand, the relationship between the flow discharge and the drainage area is obtained from historical data measured at ground stations. By coupling these two relationships, we can finally derive the width-discharge relationship which comprises an important component of downstream hydraulic geometry. The proposed method was tested for the Nakdong River and the Seomjin River, successfully capturing power-law exponents in the width-discharge relationships reported in earlier studies. The proposed approach can serve as an alternative for obtaining the hydraulic geometry relationship under the limits of ground data.

The Evaluation of Bed Protection as Placing Methods of Mortar (모르타르 타설 방법에 따른 하상보호공의 안정성 평가)

  • Kim, Jong-Tae;Kim, Chang-Sung;Kang, Joon-Gu;Yeo, Hong-Koo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.2
    • /
    • pp.1102-1108
    • /
    • 2014
  • This study was to compare the protection abilities of an SPF through ground or underwater casting. A mat of 1/10 scale was made and then mortar was placed on the ground and submerged conditions. A limit velocity of each mat was estimated with this experiment. As a result of the test, the mat failed because of the decrease of bearing power in the center of the waterway. On the one hand, the edge of the mat, where the velocity is slow, secures stability. The result of the limit velocity analysis suggests that a velocity of ground placement with 6.51m/s and underwater casting with 9.80m/s is the minimum to ensure stability. When SPF mat with a thickness of 0.50m is replaced with a concrete block, it is calculated to need a maximum thickness of 2.21m.

A Design and Implementation of CDMA based Electronic Float Flow Pattern System (CDMA기반 전자부자 흐름 패턴 시스템 설계 및 구현)

  • Kim, Dong-Hyun;Lee, Chae-Seok;Kim, Jong-Deok
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.16 no.12
    • /
    • pp.2619-2627
    • /
    • 2012
  • The electronic float flow pattern system can predict a rate of flow of river by monitoring a location of float in remote with location measurement technology and a variety of communication technology. Now, to analyze the flow pattern of the natural streams, we use the manual floats in many forms. The measurement of a rate of flow using a manual float measures the distance and time of the manual float directly and uses it. It is inefficient for measurement method and exact a rate of flow of river. To overcome this problems, we designed and implemented the electronic float using CDMA, GPS, and RF module. Then, to get the location information and a rate of flow information, we designed and implemented the monitoring system for the electronic float flow pattern. The short life cycle of electronic float using the battery decreases the utility of the electronic float flow pattern system. Then, we design the power saving method to reduce the power of the electronic float in electronic float flow pattern system.

Designing dam operations for better aquatic species' habitat and economic outcomes in a regulated river

  • Kang, Hyeongsik;Choi, Byungwoong
    • Journal of Korea Water Resources Association
    • /
    • v.52 no.spc2
    • /
    • pp.823-833
    • /
    • 2019
  • This study presents the impact of natural flow patterns on downstream fish habitat and economic outcomes in the Dal Stream, Korea. The study reach is 3.35 km long, located downstream form the Goesan Dam. To assess such impact, this study performed physical habitat simulations. The River2D model was used for the computation of the flow and the HSI model for the habitat simulation. Two physical habitat variables, flow depth and velocity, were used. The Zacco platypus, Zacco temminckii, Coreoleuciscus splendidus, and Opsariichthys bidens were selected as the target species in the study area. Using the building block approach (BBA), the scenarios for the hydropeaking mitigation were presented. Scenario 1 and scenario 2 were proposed by using the magnitude - duration concept and averaged the hydrologic data over the each month, respectively. Simulation results indicated that the scenarios effects significantly increased by about 18.6% for the weighted usable area (WUA). In addition, hydroelectric power benefits with both scenarios were investigated. It was revealed that the change of storing and releasing water decreased by about 27% for hydroelectric power benefits. In order to increase economic benefits, the scenario was modified with the discharges corresponding to the hydropeaking condition except the flood season. As a result, the hydroelectric power benefits were almost the same, however the aquatic habitat for the target species increased by about 5%. The change of dam re-operations through natural flow patterns provides an opportunity to minimize environmental and economic benefits in order to balance water management.

Maximizing of hydropower generation of Hwacheon Reservoir using HEC-ResPRM model

  • Karimizadeh, Keivan;Choi, Changwon;Yi, Jaeeung
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.219-219
    • /
    • 2015
  • Hwacheon Reservoir is one of the reservoirs, which are located on the North Han River in South Korea. Construction of this reservoir was started in 1939 and completed in 1944. At the upstream of this reservoir there are Peace Reservoir, which is located in South Korea and Imnam Reservoir, which is located in North Korea. After construction of Imnam Reservoir, inflow regularity of Hwacheon Reservoir was changed and inflow of Hwacheon Reservoir also, was decreased. Peace Reservoir is used to decrease flood and damage at downstream due to unexpected release from Imnam Reservoir. This reservoir also, has a special role to regulate inflow of Hwacheon Reservoir. Hwacheon Reservoir has an important role for hydropower generation and flood control. Capacity and maximum discharge capacity of Hwacheon Reservoir are 1018 million $m^3$ and $9500m^3/s$, respectively. This reservoir has four generators to produce power and it is one of the important reservoirs for hydropower generation in South Korea. Due to the important role of this reservoir in generating power, maximization of hydropower generation of this reservoir is important and necessary. For this purpose, HEC-ResPRM model was applied in this study. HEC-ResPRM is a useful and applicable model to operate reservoirs and it gives optimal value for release to maximize power by minimizing penalty functions. In this study, after running the model, amount of release was optimized and hydropower generation was maximized by allocating more water for hydropower release instead of spillway release. Also, the model increased release in dry period from October to June to prevent high amount of release in flood season from July to September.

  • PDF