• Title/Summary/Keyword: power monitoring

Search Result 2,821, Processing Time 0.031 seconds

A Study on Analysis of Propagation Speed of Power Frequency by Generation Drop (발전기 탈락에 따른 주파수의 전파속도 해석에 관한 연구)

  • Kim, Hak-Man;Park, Chul-Won
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.63 no.4
    • /
    • pp.295-300
    • /
    • 2014
  • The frequency is an important operating parameter of a power system. There is an increasing importance of constant monitoring of frequency to achieve stable power supply by WAMS(wide area monitoring system) and FNET(Frequency Monitoring Network). This paper is part of development of a network-based frequency monitoring and failure prediction system for wide-area intelligent protection relaying. In this paper, analysis of propagation speed of power frequency by generation drop using the PSS/E was carried out. For dynamic analysis, the 11 metropolitan areas offices of KEPCO divided into five groups of Seoul, Gangwon, Chungcheong, Honam, and Yeongnam group, study was performed.

Security Monitoring System for Apartment House Building Using Paver Line Carrier (전력선 통신을 이용한 집단주택 안전관리 시스템)

  • Kim, In-Soo;Kim, Kwan-Ho;Kim, Yo-Hee
    • Proceedings of the KIEE Conference
    • /
    • 1993.07a
    • /
    • pp.476-478
    • /
    • 1993
  • Instead of installing new communication wiring to each house in the apartment house building. the power distribution network. which is already installed in the building. can be use as communication medium. In a safty management, by adoption of power line communication system, at remote we can monitor safty related sensors such as fire, gas leakage, burglar intrusion and emergency call which are located at each house. From this viewpoint, we developed security monitoring system for apartment house building using power lines. Security monitoring system consists of Power Line Communication-Sub Controller (PLC-SC). Power Line Communication-Main Controller (PLC-MC) and Management System (MS). Between a PLC-MC and a PLC-SC, the transmission rate is 1200 bps in power lines and modulation technique is frequency shirt keying (FSK). In between a PLC-MC and a MS, the transmission rate is 1200 bps in communication line (RS-485). As a result of this research. transmission loss is 0.1dB per meter of intrabuilding distribution network. Transmission can be reach in 250 meters. So it is enough to communicate for security monitoring system in apartment house building.

  • PDF

Low-power Environmental Monitoring System for ZigBee Wireless Sensor Network

  • Alhmiedat, Tareq
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.11 no.10
    • /
    • pp.4781-4803
    • /
    • 2017
  • Environmental monitoring systems using Wireless Sensor Networks (WSNs) face the challenge of high power consumption, due to the high levels of multi-hop data communication involved. In order to overcome the issue of fast energy depletion, a proof-of-concept implementation proves that adopting a clustering algorithm in environmental monitoring applications will significantly reduce the total power consumption for environment sensor nodes. In this paper, an energy-efficient WSN-based environmental monitoring system is proposed and implemented, using eight sensor nodes deployed over an area of $1km^2$, which took place in the city of Tabuk in Saudi Arabia. The effectiveness of the proposed environmental monitoring system has been demonstrated through adopting a number of real experimental studies.

Input Signal Selection Circuits Development of Electronic Cards for Thermal Degradation in Nuclear Power Plant (원전 열화 전자카드의 입력신호 선택회로 개발)

  • Kim, Jong-ho;Che, Gyu-shik
    • Journal of Advanced Navigation Technology
    • /
    • v.23 no.6
    • /
    • pp.554-560
    • /
    • 2019
  • Excore Nuclear Flux Monitoring System in Nuclear Power Plant monitors continuous reactor power up to maximum 200%. The monitoring method, however, has to be different depending on the reactor power level. Because the logarithmic pulse signals must be counted and processed exactly due to large uncertainty if their levels are low, on the other hand, they must be processed through statistical methodolgies if theirs are high to get exact monitoring values, in point of thermal degradation view. Therefore, we developed thermal degradation input signal selection circuit to transfer low level reactor power monitoring circuit to high level reactor power circuit at rated value in this paper. We proved their validities through testing them using real data used in nuclear power plant and analyzed their results. And, These methods will be used to measure the neutron level of excore nuclear flux monitoring system in nuclear power plant.

A Basic Study on the Monitoring of Grinding Burn by Grinding Power Signatures (연삭동력에 의한 Grinding Burn 검지를 위한 기초적 연구)

  • 이재경
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.6 no.1
    • /
    • pp.18-26
    • /
    • 1997
  • Grinding burn formed on the ground surface is related to the maximum temperature of workpiece surface and wheel tempertaure in the grinding process. The thermal characteristics of workpiece and grinding conditions on the surface tempertaure of the oxidation growing layer after get out of contact with the grinding wheel. The assumption used in grinding power signatures leads to the local temperature distribution between grinding wheel and workpiece, i.e., a single curve determines temperatures anywhere within the grinding wheel at anytime. This information is useful in the study of the grinding burn penetration into the wheel and thus provides an presentation of grinding trouble monitoring for the burning. On the basis of grinding power signatures in the wheel, thermally optimum grinding conditions are defined and controlled. To cope with grinding burn, the use of grinding power signatures is an effective monitoring systems when occurring the grinding process. In this paper, the identified parameters suggested in this study which are derived from the grinding power signatures are presented, and prediction model by grinding power utilized a linear regression algorithm is applied.

  • PDF

Site Monitoring System of Earthquake, Fault and Slope for Nuclear Power Plant Sites (원자력발전소의 부지감시시스템의 운영과 활용)

  • Park, Donghee;Cho, Sung-il;Lee, Yong Hee;Choi, Weon Hack;Lee, Dong Hun;Kim, Hak-sung
    • Economic and Environmental Geology
    • /
    • v.51 no.2
    • /
    • pp.185-201
    • /
    • 2018
  • Nuclear power plants(NPP) are constructed and operated to ensure safety against natural disasters and man-made disasters in all processes including site selection, site survey, design, construction, and operation. This paper will introduce a series of efforts conducted in Korea Hydro and Nuclear Power Co. Ltd., to assure the safety of nuclear power plant against earthquakes and other natural hazards. In particular, the present status of the earthquake, fault, and slope safety monitoring system for nuclear power plants is introduced. A earthquake observatory network for the NPP sites has been built up for nuclear safety and providing adequate seismic design standards for NPP sites by monitoring seismicity in and around NPPs since 1999. The Eupcheon Fault Monitoring System, composed of a strainmeter, seismometer, creepmeter, Global Positioning System, and groundwater meter, was installed to assess the safety of the Wolsung Nuclear Power Plant against earthquakes by monitoring the short- and long-term behavioral characteristics of the Eupcheon fault. Through the analysis of measured data, it was verified that the Eupcheon fault is a relatively stable fault that is not affected by earthquakes occurring around the southeastern part of the Korean peninsula. In addition, it was confirmed that the fault monitoring system could be very useful for seismic safety analysis and earthquake prediction study on the fault. K-SLOPE System for systematic slope monitoring was successfully developed for monitoring of the slope at nuclear power plants. Several kinds of monitoring devices including an inclinometer, tiltmeter, tension-wire, and precipitation gauge were installed on the NPP slope. A macro deformation analysis using terrestrial LiDAR (Light Detection And Ranging) was performed for overall slope deformation evaluation.

Development of firing equipment and monitoring system for electric power conversion system for high voltage and large current (고압 대전류용 전력변환 점호장치 및 감시시스템 개발)

  • Lee Joo-Hyun;Lim Ick-Hun;Ryu Ho-Sun
    • Proceedings of the KIPE Conference
    • /
    • 2006.06a
    • /
    • pp.481-484
    • /
    • 2006
  • A electric power conversion system in a pumped storage power plant is important equipment for converting electric motor kinetic energy into electric power. A electric power conversion monitoring system consists of high voltage thyristor firing equipment, fault detection module, data gathering module, real time data processing equipment and man machine interface system. This paper describes electric power conversion system overview, the developed SFC monitoring system configuration including system characteristics, and successful application result to San-Cheong pumped storage power plant.

  • PDF

UsN based Soundness Monitoring Diagnosis System of Power Transmission Steel Tower (UsN 기반의 송전철탑 건전성 감시진단시스템 기본설계)

  • Lee, Dong-Cheol;Bae, Ul-Lok;Kim, Woo-Jung;Min, Bung-Yun
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.56 no.1
    • /
    • pp.56-62
    • /
    • 2007
  • In this paper, design method for power tower hazard diagnosis/predition system based on UsN was proposed. The proposed method used multi-hybrid sensors to measure rotation, displacement, and inclination state of power tower, and made decision/prediction of hazard of power tower. System design was made with requirement analysis of monitoring for transmission power facility and use of MEMS and optic fiber sensors. For hazard decision, analysis of correlation was made using sensor output. LN based on IEC61850,international standard for digital substation, was also proposed. For transmission facility monitoring, digital substation and power tower were considered as parts of power facility networks.

Design and Implementation of Intelligent Aircraft Power Measurement System Based on Embedded (지능형 항공기 전력 계측 임베디드 시스템에 설계 및 구현)

  • Choi, Won-Huyck;Jie, Min-Seok
    • Journal of Advanced Navigation Technology
    • /
    • v.17 no.6
    • /
    • pp.664-671
    • /
    • 2013
  • In this paper, in an aircraft power can be measured by wireless AEMS (aircraft electric power measurement monitoring system) system is proposed. AEMS has been design based on current commercialized power measuring systems analysis with improvement and connects it with most talked about item, smart phone and monitoring system. And also adopting real time power measuring system, constitute more practical power measuring system by controlling electricity usage in real time.

Hand-Held Power Quality Monitoring System for Factory Electrical Installation (공장 전기 설치를 위한 휴대용 전력품질 모니터링 시스템)

  • Choi, Sang-Yule
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.15 no.3
    • /
    • pp.113-118
    • /
    • 2015
  • High-power semiconductor devices and microprocessors in factory electrical installation so sensitive to power quality measurements such as harmonic currents, voltage fluctuations, flicker, current imbalance. Therefore, the little change of power quality can influences the productivity of factory electrical machines. Troubleshooting these problems requires accurate measurements and analysis of power quality with monitoring instruments that can effectively locate issues and identify solutions. In this paper, the author presents hand-held power quality monitoring system to locate issues and identify solutions. The proposed system consists of two parts, One is to develop hand-held power meters by using NI(National Instrument) DAQ(Data Acquisition) and WLAN. Another is develop power quality monitoring MMI(Man-Machine Interface) using LabView software. To demonstrate the validity of the proposed algorithm, variable tests are carried out.