• Title/Summary/Keyword: power distribution line

Search Result 812, Processing Time 0.031 seconds

The Development of Fault and Lightning Stroke Section Location System for Overhead Transmission Line (가공지선 전류 검출 방식의 송전선 사고 및 낙뢰 구간 검출 시스템 개발)

  • Lee C.Y.;Kim J.N.;Oh D.J.;Ha C.W.;Kim D.W.
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.584-586
    • /
    • 2004
  • This paper deals with the development of on-line fault and lightning stroke section locating system for branched overhead transmission line. The section locating algorithm of this system i3 by analyzing the distribution pattern of current flowing through the overhead ground wire. It composes of three parts; current sensors, local remote terminal unit(RTU) and analysis program at surveillance tenter. Double Rogowski coil sensor having integrating amplifier was designed as current sensor. In order for current pattern analysis, the transmitted waves from each sensor wert synchronized by GPS tim c clock in RTU. While, lightning stroke location are judged only by polarity information of lightning currents. This design has a benefit in simplicity of signal processing unit of RTU.

  • PDF

MARS/MASTER Solution to OECD Main Steam Line Break Benchmark Exercise III

  • Jeong, Jae-Jun;Joo, Han-Gyu;Chung, Bub-Dong;Ha, Kwi-Seok;Lee, Won-Jae;Cho, Byung-Oh;Zee, Sung-Quun
    • Nuclear Engineering and Technology
    • /
    • v.32 no.3
    • /
    • pp.214-226
    • /
    • 2000
  • In an effort to assess the performance of KAERI's coupled 3D kinetics - system T/H code, MARS/MASTER, Exercise III of the OECD main steam line break benchmark is solved. The analysis model of the reference plant, TMI-1 - a 2772 MWth B&W plant, consists of three major components: a core neutronics model involving 241$\times$28 neutronic nodes, a vessel 3D T/H model consisting of 374 hydrodynamic volumes, and a 1D system T/H model containing 157 hydrodynamic volumes. The results show that there is a significant amount of flow mixing occurring in the upper and lower plenum regions and the core power distribution evolves to a highly localized shape due to the presence of a stuck rod, as well as the asymmetric flow distribution. It is judged that MARS/MASTER properly captures these drastic 3-dimensional effects. Comparisons with other results submitted to OECD confirm the accuracy of the MARS/MASTER solution.

  • PDF

Anti-Contamination Capability of Gas Insulated Switch for Distribution Line (배전용 가스개폐기의 내 오손 성능향상 대책)

  • Kim, Ju-Yang;Song, Il-Keun;Kim, Chan-Young;Han, Jae-Hong
    • Proceedings of the KIEE Conference
    • /
    • 1998.11c
    • /
    • pp.758-760
    • /
    • 1998
  • This paper provides the results of performance investigation of gas insulated switches(G/S) for distribution power system. In order to investigate anti-contamination capability of G/S we carried out electrical tests and material analysis on the body of G/S and it's accessories. Through this experiment we found out the lead cable of G/S had not anti-contamination capability and G/S had insufficient interval between each phase. In order to improve the performance of G/S for heavy contamination area it is indispensable to replace the lead cable to the new cable which has anti-contamination ability.

  • PDF

The Development of the Optical Network for the Automation Systems in Electric Power Companies (전력자동화서비스를 위한 광네트워크 설계 및 모뎀개발)

  • Kim, Myong-Soo;Hyun, Duck-Hwa;Cho, Seon-Ku
    • Proceedings of the KIEE Conference
    • /
    • 2002.07d
    • /
    • pp.2543-2545
    • /
    • 2002
  • There are many applicable services such as remote metering, load control, distribution line automation, Pole transformer Monitoring having their own networks in the electric power company. The application of the optical network technology as the back-born network to the Automation Systems in KEPCO is potentially beneficial in reliability, speed, and expandability. The 1-core and 2-core optical modems were developed and used by the Distribution Automation System. But, They had some disadvantages and advantages. So, We designed the new optical modems applied each advantages. This paper presents some of design efforts and test results for the multi-channel optical modem at KRPRI.

  • PDF

A Study on Stable Operating for Buan S/S Byunsan D/L (2728 02) Power Distribution Area Connected with Wind Power Generator (부안 S/S 변산 D/L(2728 02) 공급구역을 대상으로 한 풍력발전시스템 계통연계 시 보호협조 방안)

  • Jang, Mi-Hye;Shin, Baek-Sik;Song, Weon-Jin;Kim, Yeong-Min;Kim, Dong-Yong
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2008.06a
    • /
    • pp.508-509
    • /
    • 2008
  • A creation of large and small scale wind farm was considered to proper already, as according to real Jeonbuk Saemangeum project. A grow larger to be construction of the new and renewable energy thema park as well as creation possibility of large scale wind farm afterward. Therefore, in this paper was proposed a counterplan on D/L protection cooperation of Buan S/S Byunsan D/L (2728 02) power distribution line in case of connected with wind power generator.

  • PDF

Optimal Congestion Management Based on Sensitivity in Power System with Wind Farms (민감도를 이용하여 풍력단지가 연계된 송전계통의 최적혼잡처리)

  • Choi, Soo-Hyun;Kim, Kyu-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.12
    • /
    • pp.1965-1970
    • /
    • 2016
  • This paper studies generator rescheduling technique for congestion management in power system with wind farms. The proposed technique is formulated to minimize the rescheduling cost of conventional and wind generators to alleviate congestion subject to operational line overloading. The generator rescheduling method has been used with incorporation of wind farms in the power system. The locations of wind farms are selected based upon power transfer distribution factor (PTDF). Because all generators in the system do not need to participate in congestion management, the rescheduling has been done by generator selection based on the proposed generator sensitivity factor (GSF). The selected generators have been rescheduled using linear programming(LP) optimization techniques to alleviate transmission congestion. The effectiveness of the proposed methodology has been analyzed on IEEE 14-bus systems.

The Trend of suppression technology of harmonics for distribution system (고조파 유출 억제기술의 동향)

  • Koh Hee Seog;Lee Hyun Moo;Lee Chung Sik
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.330-332
    • /
    • 2004
  • Reliance on electric power has increased together with customer's demand for delightful and convenient linging. Recently, as appeared in the rapid growth of the technology of power electronics, the installation and apparatus using semiconductor applicotion is widly supplied and used from a household goods to industrial goods. However, these machine generate harmonics current and voltage for electric power system. The harmonics current is increased voltage distortion and generate a lot of interference in the electric power system. In this paper, the trend of the trend of suppression technology of harmonics outflow and the fundamental theory about the suppression of harmonics current in the distribution system are investigated and evaluated Therefore we look forward to supply electric power of good quality to satisfy the harmonics current guide line which is applied to household goods in the world.

  • PDF

Optimal DG Placement in a Smart Distribution Grid Considering Economic Aspects

  • Buaklee, Wirote;Hongesombut, Komsan
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.4
    • /
    • pp.1240-1247
    • /
    • 2014
  • The applications of Distributed Generation (DG) in a smart distribution grid environment are widely employed especially for power balancing and supporting demand responses. Using these applications can have both positive and negative impacts on the distribution system. The sizing and location of their installations are the issues that should be taken into consideration to gain the maximum benefit from them when considering the economic aspects. This paper presents an application of the Bat Algorithm (BA) for the optimal sizing and siting of DG in a smart distribution power system in order to maximize the Benefit to Cost Ratio (BCR), subjected to system constraints including real and reactive power generation, line and transformer loading, voltage profile, energy losses, fault level as well as DG operating limits. To demonstrate the effectiveness of the proposed methodology and the impact of considering economic issues on DG placement, a simplify 9-bus radial distribution system of the Provincial Electricity Authority of Thailand (PEA) is selected for the computer simulation to explore the benefit of the optimal DG placement and the performance of the proposed approach.

A Study on Conducted EMI Emission Characteristics in 3-Phase PWM Converter (3상 PWM 컨버터의 전도성 EMI 특성에 관한 연구)

  • 채영민;고재석;목형수;최규하;홍순찬;백수현;이은웅
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.2 no.2
    • /
    • pp.41-48
    • /
    • 1997
  • Nowadays, EMI emission characteristics, which causes harmful effect on power distribution system and other equipments, have been studied in field of Power electronics, vigoriously. So, in this paper, the conducted EMI emission is measured and compared for 3-phase diode rectifier and PWM converter according to switching frequency variation and current control method change using LISN(Line Impedance Stabilization Network) and spectrum analyzer.

  • PDF

A study on the Safety of metro-railroad electric power feed system (도시철도 전력 급전시스템에 대한 안전성 연구)

  • Lee, Bong-Jae;Park, Weon-Chan;Kim, Woo-Seob;Jeong, Seong-Yeong
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.390-398
    • /
    • 2008
  • While road traffic of sharp rise of an international oil price and capital Seoul reaches to critical point, and a use passenger drives recklessly on the subway which is a cradle of public transportation, the depths analyzes an electric power feed system regarding a ground wealth electric car line of the subway Line 2 East Section which is a long distance (Seongsu $\sim$ Gangbyeon), and future, electric power supply Feeder Distribution Center prepares to Operational Headway shortening along an ATO signal method change by feeder increase supplement, and ensure safety to an electric power supply system, and will solve inconvenience of safe operation and use passenger.