Performance measurement is not an easy task. However, it is necessary to measure the expected value of the informatization project to be invested, to help the successful progress of the informatization project, and to confirm the result of the informatization project. This study describes the evaluation systems of the defense informatization project in Korea used after the end of the informatization project (post-implementation evaluation stage). In the post-implementation evaluation stage of proposed system, the informatization project is evaluated in terms of performance achievement, project plan compliance, project management, and economic validity. For each element, this study suggests metrics and practical measurement method. With metrics and their method, it can be evaluated which project is better than others. Moreover, the lessons learned can be developed. Under scarce budget condition, defense organizations can make better performance from IT project with the evaluation system suggested in this study.
The performance of the construction project is to be evaluated within 60 days of completion, according to relevant laws. It evaluates cost, construction period, design change, re-construction, safety, etc. for each project stage. And the project owners are inputting the evaluation results of the construction work into the construction project information system(CALS). The post-evaluation result information entered in this way can be referred to in the basic design of the construction project by referring to the related contents if there is a similar construction in the future. And It can also be used to predict and respond to the required period and cost by analyzing the accumulated data. In this study, in order to provide reference data that can be used in similar projects in the future, the latest analysis methods are reviewed and the possibility of future application is considered. Accordingly, this study intends to focus on the construction cost part among the indicators such as construction cost, construction period, design change, and re-construction that are currently being dealt with in post evaluation.
건설산업의 규모는 증가하고 있으며 국가 산업 전체에 미치는 영향도 크다. 그러나 건설사업 수행과정에서 공사비 증액, 공사 기간 지연, 안전사고 발생, 품질 문제 등이 발생하고 있다. 본 논문은 사후평가를 수행한 토목시설물 공사를 대상으로 공사 수행과정 중 공사비, 공사 기간, 설계변경 성과를 분석하였다. 토목시설물을 종류별, 공사 성격별, 공사 규모별, 계약 성질별, 입찰방식별로 구분하여 분석을 수행하였다. 이를 통해 공공사업으로 수행한 토목시설물 공사의 계획, 설계, 시공과정에서 공사비와 공사 기간 등의 예측과 그 결과를 비교하였다. 사업수행성과 데이터의 입력 오류 가능성이 있으므로 사후평가센터의 사후평가 직접 수행과 설계변경 시행지침의 변경을 제안하였다. 그리고 데이터의 지속적인 수집을 통해 시설물별 세부 분석을 제안하였다.
The decision making procedure of consumer's post purchase is important because post purchase evaluation function is the physiological variables in repurchasing. The previous studies of post-purchase decision making showed that consumer compared the expectation of pre-buying with the performance of the product of post-buying. After consumers evaluates the products, consumer is satisfactory or dissatisfactory with products. And the satisfaction effects repurchase intention. The criteria which consumer didn't consider can be important to consumer after buying. Therefore the research problems are as follows; 1. To reveal the consumer's post-purchase clothing evaluative criterita and to indentify the dimensions of post-purchase clothing evaluative criteria. 2, To examine a causal model of the repurchase intention by post- purchase clothing evaluative criteria, satisfaction and brand attitude, A questionnaire was developed and administered 530 women living in Taejeon, and social daytime wear was selected as a clothing item for the study. Consumer's post-purchase clothing evaluative criteria were composed of six dimensions; Fit, Utility, Management, Transformation, Wearing/sewing, Esthetic factor. The main causal model of repurchase intention is that post-purchase clothing evaluative criteria - satisfaction - brand altitude - repurchase intention. Finally we found that the post-purchase clothing evaluative criteria were important because the repurchase intention depended on post-purchase clothing evaluation, too.
This paper addresses three central decision-making problems frequently encountered in developing evaluation checklists for ex-post evaluation of R&D projects at private R&D centers: 1) what kind of evaluation elements and factors should be included in the evaluation forms\ulcorner 2) how much weight should be assigned to each evaluation factor and element\ulcorner and 3) could the same evaluation elements and factors with weights be applied all the project type(research, development, and engineering)\ulcorner To answer these questions, we identified the evaluation elements/factors based on the review of relevant literature and measured the perceptions of researchers, R&D managers, and top managements of the three private R&D centers to get the information about the importance levels of the elements and the weights of the factors for each of the three project types. The findings include that 1) all the evaluation elements derived from the literature exhibited high importance levels, and 2) the importance levels of the elements and the weights of the factors were quite varied along the project types. Theoretical and practical implications of the findings for ex-post evaluation of R&D projects are discussed.
Increasing the user's need in the building facilities, the architects, engineers, and building managers must consider the user's opinion when they plan and construct the buildings. When planning and managing of the buildings, accepting the user's opinion is desirable and indispensible to solve the Problems about the architectural facilities between suppliers and users. To supply the efficient working environments, use the check listing tools and operate the post occupancy evaluation. The real estate and development company is selected for the evaluation. It is renovated in 2000 to fit in its working environment. The process of the evaluation is proceeded both private and group working spaces and facility and management of the buildings with 10 categories. Following the result of Post occupancy evaluation, the users of the building are mostly satisfied with their working environments after the renovation. However, the categories in thermal environment and indoor air and supply for office work need to be improved in advance.
In this paper, post-earthquake capacity evaluation method of reinforced concrete buildings was studied. Substructure pseudo-dynamic test and static loading test of first story column in a four-story R/C building was carried out in order to investigate the validity of the evaluation method proposed in the Damage Assessment Guideline (JBDPA 2001). In pseudo-dynamic test, different levels of damage were induced in the specimens by pre-loading, and input levels of seismic motion, at which the specimens reached to the ultimate stage, were examined. From the experimental result, no significant difference in damage levels such as residual crack width between the specimens under static and pseudo-dynamic loading was found. It is shown that the seismic capacity reduction factors ${\eta}$ can provide a reasonable estimation of post-earthquake seismic capacity of R/C buildings suffered earthquakes.
자연재해는 발생 자체를 막는데 한계가 있기 때문에 피해저감을 위해서는 예방사업을 통해 재해발생을 사전에 예방하는 것이 중요하다. 자연재해발생의 증가와 함께 자연재해와 관련된 예방사업에 대한 관심이 높아지고 있으며, 이와 관련된 투자도 증가하고 있다. 이와 함께 자연재해예방사업에 대한 투자 시, 그 파급효과 등을 검증할 수 있는 평가 역시 중요한 과제로 대두되고 있다. 자연재해예방사업과 같은 국가 공공투자사업을 평가하기 위해서 비용편익분석과 같은 정량적 분석을 통한 연구는 지속적으로 수행되고 있다. 정량적 분석방법만으로 사업의 효과를 충분히 설명하지 못한다는 문제점에도 불구하고 재해관련 분야에서 효과분석이나 평가를 위한 다양한 방법이 제시되지 못하고 있는 것이다. 본 연구에서는 정성적 분석을 통한 자연재해예방사업의 사후평가를 위해서 자연재해예방사업의 사후평가에 영향을 미치는 항목들을 도출하고, 구조방정식모델(SEM : structural equation modeling)을 통해 사후 평가항목과 사업효과 간 인과관계 분석 및 가중치를 산정하였다. 이를 바탕으로 자연재해예방 사업에 대한 사후평가지수 산정식을 제시하였다.
건설공사의 품질을 확보하고 예산의 절감을 도모하는 등 건설 프로젝트의 성공 여부를 판단하기 위해서는 객관적인 평가지표와 그에 대한 투명성 확보가 필요하다. 건설부문을 포함한 공공사업의 경우 대규모 예산투입이 이루어지고 있지만 그 결과물로 인한 편익을 산정하기 어려울 경우가 많아 공공사업의 효율성과 효용성이 떨어진다고 인식되고 있다. 따라서 본 연구에서는 500억 원 이상의 공공공사 중 사후평가를 실시하는 시설물에 대한 소비자 만족도를 정량화하는 것을 범위로 하여, 공공공사 사후평가 시 체계적이고 정량적인 측정이 가능할 수 있도록 주민 호응도와 사용자 만족도 항목을 중심으로 하는 사후평가 측정기준을 제안하고자 한다.
Traumatic brain injury(TBI) used to be developed after a severe traumatic event. Therefore TBI usually induces acute or chronic stress reaction. I reviewed the concept, epidemiology, biological or psychosocial etiology, diagnosis and treatment of post-traumatic stress disorder (PTSD), and discussed about PTSD or stress reaction after TBI. Early evaluation and management of stress reaction after TBI are important.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.