Acknowledgement
This study was financially supported by Hanbat National University Financial Accounting Research Fund 2022 year.
References
- Ahn, J., Baek, S., Yun, S., Lee, K. and Han, S. (2023). "Analysis of major cases of road construction change order." Proceedings of KICEM Annual Conference, pp. 245-246 (in Korean).
- Ji, S., Park, M., Lee, H. and Yoon, Y. (2008). "Direction for improving cost estimation and management of construction projects: comparing to australian system." Korean Journal of Construction Engineering and Management, Vol. 9, No. 2, pp. 170-181 (in Korean).
- Jung, E., Yeom, D., Kim, J. and Kim, Y. (2021). "Development of construction cost estimation model for elementary, middle and high school facilities." Korean Journal of Construction Engineering and Management, Vol. 22, No. 3, pp. 69-78, https://doi.org/10.6106/KJCEM.2021.22.3.069 (in Korean).
- Kim, H. and Kim, H. (2023). "A study on the development of construction budget estimating model for public office buildings based on artificial neural network." Korean Journal of Construction Engineering and Management, Vol. 24, No. 5, pp. 22-34, https://dx.doi.org/10.6106/KJCEM.2023.24.5.022 (in Korean).
- Kim, K., Lee, D. and Kim, T. (2015). "A study for error analysis for post evaluation system on the construction projects." Korean Journal of Construction Engineering and Management, Vol. 16, No. 2, pp. 77-85, https://doi.org/10.6106/KJCEM.2015.16.2.077 (in Korean).
- Kim, J., Lee, J. and Lee, M. (2023). "A study on the improvement of long-term continuing construction contracts dispute using FGI." Korean Journal of Construction Engineering and Management, Vol. 24, No. 2, pp. 79-87, https://dx.doi.org/10.6106/KJCEM.2023.24.2.079 (in Korean).
- Koo, B., Yu, J. and Park, J. (2015). "Formal estimation method for optimal budget appropriation of highway construction projects under long-term construction contracts." Journal of the Korean Society of Civil Engineering, Vol. 35, No. 6, pp. 1405-1412, https://doi.org/10.12652/Ksce.2015.35.6.1405 (in Korean).
- KOSTAT (2003). Domestic value of construction orders received, https://kosis.kr/statHtml/statHtml.do?orgId=365&tblId=TX_365 05_A000&conn_path=I2 (Accessed: August 26, 2023).
- Kwon, Y. and Kim, K. (2023). "A study on the problems and improvement plan of the post-evaluation system for construction work." Proceedongs of KICEM Annual Conference 2023, pp. 291-292 (in Korean).
- Lee, K. and Lee, H. (2011). "The study of analysis for costincreasing factors on public construction projects." Conference Proceedings of the Regional Association of Architectural Institute of Korea, pp. 105-108.
- Lee, K. and Park, H. (2018). "Development of the qualitative model for post construction evaluation." Journal of the Korean Society of Civil Engineers, Vol. 38, No. 5, pp. 733-739, https://doi.org/10.12652/Ksce.2018.38.5.0733 (in Korean).
- Lee, J., Tae, Y., Baek, S. and Kim, K. (2022). "A study of improvements in the standards of cost estimate for the new excellent technology in construction." Korean Journal of Construction Engineering and Management, Vol. 23, No. 5, pp. 65-76, https://dx.doi.org/10.6106/KJCEM.2022.23.5.065 (in Korean).
- Lee, J. and Yun, H. (2021). "Improvement plan through analysis of the current status of construction period calculation of public construction projects." Korean Journal of Construction Engineering and Management, Vol. 22, No. 3, pp. 12-20, https://doi.org/10.6106/KJCEM.2021.22.3.012 (in Korean).
- Mun, J. and Yun, S. (2023). "Analyzing planning performance of road construction projects using preliminary feasibility analysis data." Korean Journal of Construction Engineering and Management, Vol. 24, No. 1, pp. 3-11, https://dx.doi.org/10.6106/KJCEM.2023.24.1.003 (in Korean).
- Nam, S. and Park, H. (2020). "A study on the construction cost index for calculating conceptual estimation: 1970-1999." Journal of the Korean Society of Civil Engineering, Vol. 40, No. 5, pp. 527-534, https://doi.org/10.12652/Ksce.2020.40.5.0527 (in Korean).