• Title/Summary/Keyword: plant facilities

Search Result 946, Processing Time 0.023 seconds

Performance Evaluation of Rice Mill Plant By a Computer Simulation

  • Chung, Jong-Hoon
    • Agricultural and Biosystems Engineering
    • /
    • v.2 no.1
    • /
    • pp.7-14
    • /
    • 2001
  • A rice mill plant with a capacity of 3 t/h was constructed with automated facilities at Chonnam National University. A simulation model was developed with SLAMSYSTEM for evaluation and improving the rice mill process. The developed model was validated in the views of hulling efficiency, milling efficiency, milled rice recovery, other materials produced, at bottlenecks in the processes. The results of hulling efficiency, milling efficiency, milled rice recovery in the simulation were, respectively, 81.1%, 89,5%, and 73.1%, while those of the actual mill plant were 81.5%, 90.2%, and 73.5%. The simulation results including the rates of other materials(chaff, bran, broken rice, stone, etc) produced in the processes were almost similar with those of the actual process. In the simulation the bottlenecks were found out in the process for separating brown rice and sorting colored rice. These phenomena also appeared in the actual process. It needed to increase the hourly capacities of the brown rice separator and the rice color sorter. As the developed model could well express the automated rice mill plant, it could be used for designing and improving rice mill plants.

  • PDF

A Study on Unused Energy Management of Jeju City Waste Environment Center (제주시 폐기물환경사업소의 미활용에너지 활용방안 연구)

  • Kim, S.H.;Kwon, K.R.;Park, Y.C.
    • Journal of Power System Engineering
    • /
    • v.8 no.1
    • /
    • pp.48-54
    • /
    • 2004
  • In this study, waste heat of Jeju City Waste Environment Center is investigated and the utilization method is suggested with economical analysis of additional investment that needed for new facility. Energy balance of the typical facilities is considered in this study such as incineration plant and LFG power plant. The payback period of the investment which is used for the LFG power plant waste heat utilization facility is about 2.4 years and the economic profit of the facility during 10 years operation is up to 926 million won.

  • PDF

Cost comparison of pretreatment processes in large SWRO desalination plant (대규모 해수담수화 플랜트에서의 전처리공정 비용 분석)

  • Kim, Youngmin;Kim, Jin-Ho;Lee, Sangho;Lee, Chang-Kyu;Park, Kwang Duk;Choi, June-Seok
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.27 no.5
    • /
    • pp.555-560
    • /
    • 2013
  • A cost analysis method for pretreament processes of a large scale seawater desalination plant was considered using a cost estimation model, WaTER (Water Treatment Estimation Routine). This model is based on cost functions of U.S. EPA to conduct economic analysis of water treatment facilities. A virtual seawater desalination plant which has pretreatment production capacity of $100,000m^3$ per day was chosen as a model plant. Dual media filtration and microfiltration systems were compared as pretreatment process, and the following reverse osmosis process was modeled. As a result, microfiltration showed a price competitiveness in condition of operating with reverse osmosis process by reducing the loads of water treatment and membrane cleaning despite it's high annual cost.

Assessment of environmental impacts of LID technologies on vegetation

  • Choi, Hyeseon;Hong, Jungsun;Geronimo, F.K.F.;Kim, Lee-Hyung
    • Membrane and Water Treatment
    • /
    • v.10 no.1
    • /
    • pp.39-44
    • /
    • 2019
  • LID facilities do not consider environmental factors, and due to inappropriate vegetation planting causing degradation in efficiency due to plant damage and difficulty in maintenance. Therefore, in this study, assessment of impact environmental factor by seasonal variation of chlorophyll and growth of vegetation planted in LID technologies and change of pollutant reduction were conducted. In the case of B-SJ and B-RI, growth rate decreased after summer (August), and B-MG showed steady growth until autumn (September). Chlorophyll was found to increase during spring season while it decreased during autumn season. The chlorophyll concentration was found to affect the plant growth pattern. TN reduction efficiency was highest with greater than 80% efficiency in summer, and it was analyzed that plants were identified as the main factor affecting the seasonal reduction efficiency of TN. Also, temperature and relative humidity were analyzed to affect plant growth, activity and pollutant removal efficiency. Plant type and growth pattern are considered as factors to be considered in selection of appropriate plant types in LID technologies.

Emission Characteristics of Odor Compounds from Fundamental Environmental Facilities in an Industrial Complex Area in Daegu City (대구시 산업단지 환경기초시설의 악취발생 특성)

  • Lee, Chan-Hyung;Jeon, Hyun-Sook;Shin, Myung-Cheol;Kim, Eun-Deok;Jang, Yun-Jae;Kwon, Byoung-Youne;Song, Hee-Bong
    • Journal of Environmental Health Sciences
    • /
    • v.42 no.4
    • /
    • pp.246-254
    • /
    • 2016
  • Objectives: This study evaluated the odor emission characteristics from fundamental environmental facilities at an industrial complex area in Daegu City. Methods: The odor samples were collected from May 2015 to January 2016 and were analyzed for specified offensive odor substances. The odor quotient and the odor contribution was calculated. Results: Ammonia was detected in all samples monitoring specified odor compounds, followed by hydrogen sulfide and acetaldehyde. According to contribution analysis, hydrogen sulfide shows the highest contribution in all facilities. At wastewater treatment plants A and B and sewage treatment plant F, it was followed by acetaldehyde. At wastewater treatment plant C, it was followed by imethyl sulfide. Conclusion: The major component of odor can be determined by evaluating the degree of contribution to the odor intensity rather than the concentration of the individual odor components. To increase the effectiveness of odor reduction, policies focused on materials with a high odor contribution are needed rather than focusing on high-concentration odor compounds.

Performance Evaluation of the Cast-in-place Anchor Bolt in Non-cracked Concrete used in Power Plant Facilities (비균열 콘크리트에 매립된 발전설비 정착부 선 설치 앵커의 구조성능 평가)

  • Kim, Dong-Ik;Jong, Woo-Young
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.11
    • /
    • pp.250-258
    • /
    • 2019
  • The seismic performance and stability of operating facilities installed in domestic power plants need to be verified because of the increased incidence of earthquakes resulting in power plant damage due to the overturning failure of electric operating facilities. In this study, a structural performance evaluation of the anchor bolts constructed to setup the operating facilities on concrete slabs was carried out through an on-site inspection of power plants, called Daechung-Dam. M10 J hook and M12 J hook anchor bolts were installed in the field unit. According to the ASTM E 488-96 specifications, anchor bolt pullout and shear tests were carried out and compared with the anchor-bolt design standards. The results from the tension and shear pullout tests showed that the M10 and M12 J hook anchor bolts had higher performance than the required design load. Thus, they were found to be safe enough. Nevertheless, more research in the field of analytical study will be needed in the near future.

Construction of the Heat Pump System Using Thermal Effluents for Greenhouse Facilities in Jeju and Evaluation of Cooling Performance (제주 시설온실 냉난방을 위한 발전소 온배수 활용 열펌프 시스템 구축 및 냉방성능 평가)

  • Lee, Yeon-Gun;Heo, Jaehyeok;Lee, Dong-Won;Hyun, Myung-Taek
    • Journal of Energy Engineering
    • /
    • v.27 no.4
    • /
    • pp.70-79
    • /
    • 2018
  • A heat pump system using the thermal effluent from the Jeju thermal power plant of KOMIPO was constructed with the capacity of 300 RT to supply cool or hot water to greenhouse facilities located 3 km from the power station. The way of transporting heat from the thermal effluent to greenhouses at a long distance was optimized, and a monitoring system to measure the water temperature and detect a leakage in a pipe conduit was also installed. This paper presents the system configuration of the constructed heat pump system for air conditioning and heating of greenhouse facilities in Jeju, and the characteristics of major components deployed in the system. The preoperational tests of the heat pump system were conducted during the summer season in 2018 for evaluation of its cooling performance. The operational stability and cooling performance of the heat pump system were confirmed by investigating the measured fluid temperature and flow rate, and COP of the heat pump in a cooling mode.

A Study on a PCB Manufacturing Plant's Fire Risk Assessment due to the Mitigation of Fire Protection Zone and an Improvement Way through Estimation of Sprinkler Demand Water Flow Rate (방화구획 완화에 따른 PCB공장의 화재위험평가 및 스프링클러 요구살수유량 산정을 통한 기준개선안에 관한 연구)

  • Oh, Chan-Wook;Oh, Ryun-Seok;Choi, Jun-Ho
    • Fire Science and Engineering
    • /
    • v.33 no.2
    • /
    • pp.56-62
    • /
    • 2019
  • A sprinkler is a fire extinguishing equipment installed in a protected area where a detector or head detects a fire and automatically puts out the fire. However, the Ministry of Land, Infrastructure and Transport's "Regulations on Building Evacuation and Fire Protection Standards, etc." stipulate that fire compartment area should be reduced to three times by installing sprinkler facilities in the case of factories and warehouses. In this study, fire hazard was analyzed for a real PCB factory which mitigated the fire protection zone by sprinkler installation, and the head opening characteristics of sprinkler facilities through computer simulation, installation standards of sprinkler facilities, thermal performance, operating range, and the amount of water sprayed to identify the problems of operation of sprinkler facilities in case of fire, and to suggest the grounds such as required sprinkling flow rate for system improvement.

Enhancement of Desulfurization System Efficiency in 1,000 MW Coal-Fired Power Plants (1,000 MW 석탄화력발전소 대기환경오염물질 제거효율 향상을 위한 탈황설비 성능개선)

  • Lee, Young-Su;Moon, Seung-Jae
    • Plant Journal
    • /
    • v.17 no.2
    • /
    • pp.32-41
    • /
    • 2021
  • Recently, air environmental issues such as fine dust have rapidly emerged as national issues, and intensive environmental regulations are being applied to coal-fired power plants. This study introduces the case of improving the performance of desulfurization facilities for removing sulfur oxides and dust, which are the main air pollutant emitters of coal-fired power plants, and conducted four case studies to improve the performance of 1,000 MW power plants currently in operation and carried out construction. Liquid ratio was increased by remodeling the absorption tower of desulfurization facilities, and vaporization reaction was promoted by increasing the flow rate of oxidized air. In addition, the gas heater leakage rate was improved to improve the efficiency of final desulfurization facilities. It is expected that performance improvement work considering harmony with existing facilities will satisfy the regulations(25ppm of sulfur oxides, 5mg/Sm3) that will be applied from 2023, and can be referred to other thermal power plants for review and application.

A Quantity Prediction Model for Reinforced Concrete and Bricks in Education Facilities Using Regression Analysis

  • Lee, Jong-Kyun;Kim, Boo-Young;Kim, Jang-Young;Kim, Tae-Hui;Son, Kiyoung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.5
    • /
    • pp.506-512
    • /
    • 2013
  • Since the amendment of the law on the private sector investment in social infrastructure in January of 2005, the government has been actively promoting Build-Transfer-Lease (BTL) projects. Notably, most new educational facilities have been built as BTL projects. For these facilities, the unit cost per unit area has been applied to predict construction costs. However, since construction costs are mostly managed after the detailed design phase, the costs can be estimated incorrectly. For this reason, cost management is needed in the planning phase, with a sound approximate estimate to prevent the wasteful use of funds. To address this shortcoming, this study aims to develop a quantity prediction model for education facilities using regression analysis in the planning phase. The developed model is focused on the required quantities of reinforced concrete and bricks. In order to achieve the objective, the data of 44 educational facility projects collected from Gyeonggi-do was used in the regression model. This study can be utilized by major stakeholders to accurately predict construction costs by estimating the appropriate quantities of reinforced concrete and bricks in the planning design phase.