• Title/Summary/Keyword: plant construction

Search Result 2,247, Processing Time 0.027 seconds

Establishment of Critical Work Models through the Evaluation of Technology Competitiveness (산업설비 기술수준 평가를 통한 주요업무 도출 및 모델 구축방안 연구)

  • Park Su-Hyun;Ha Seung-Ho;Kim Kyong-Min;Park Chan-Hyuk;Kim Kyong Ju
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.526-530
    • /
    • 2004
  • The portion of plant industry has increased within construction market. In spite of plant industry is dynamic field which leads state-of-the-art and creates a value, phased information management and knowledge intensive business accomplishment are insufficient. Henceforth plant is expected to demand increment of industrial project from hereafter international plant industry market. The continuous plan technique and know-how accumulation are urgent from domestic. 1'his research analyzes the areas in which domestic plant industry is insufficient and then elicits project management key success factors from current operation process. In addition, this research compares domestic plant level with overseas plant level. This study establishes work models for critical work phases based on the analysis of domestic plant technical level.

  • PDF

Development of the Estimation Software for a Petrochemical Plant (화공플랜트 견적 소프트웨어 개발에 관한 연구)

  • Min, Bong-Ki;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.8 no.1
    • /
    • pp.50-59
    • /
    • 2012
  • The current dual-watchdog estimation system has individually calculated the construction, the engineering and the procurement cost. The dual-watchdog estimation system is inefficient and prolonged estimation period because of the lack of the interoperability and the difference of material unit cost and construction unit cost. In order to resolve this problem, new estimation software was developed. The estimation software is developed by making up for the weak points in existing estimation method. The cost data with the same standard is the key point. And this software enhanced accuracy and speed of the data search in stylized estimation standard. A summary of the construction, the engineering and the procurement cost was generated in this estimation software. The unit rate about the labor cost, equipment and expense through a sheet was handled. The developed estimation software has five categories on engineering cost, procurement cost, construction cost and subcontractor management sheet. In this study, the estimation software to supplement the faults of the existing estimation method was developed. And estimation software on petrochemical projects increases an efficiency of the estimation work.

  • PDF

A Study on the Dispute Boards in International Medium and Long-term Transaction - Focus on the Construction Contract - (중장기 국제거래에서 분쟁해결위원회에 관한 고찰 - 건설계약을 중심으로 -)

  • Yu, Byoung Yook
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.57
    • /
    • pp.79-108
    • /
    • 2013
  • International transactions of plant and construction project need to time to time for completing the contract. During the performing the contract there may arise many claims and disputes it should be settled rapidly for processing schedule of works. However, arbitration and litigation for settlement of dispute are inappropriate in time and expense under the specifications of plant and construction project. Dispute boards are one of the successful resolution method of dispute prior to litigation or arbitration. If the dispute board was failed, of course, it may be allowed to continue into litigation or arbitration. As the creative methods of parties agreement, dispute boards may be expected to avoid claims and dispute in long and medium international contract. The purpose of this paper is to explore the specification and limitations of dispute boards that may clear disputes under long and medium contract of construction and procurement. It needs to be understand to determine whether is the useful methods for resolving dispute in the international project. This paper considers the specific natures of dispute board and its rules, procedures and problems including ICC and FIDIC for the contract of long and medium transaction.

  • PDF

Analysis on the Changes of Teachers' Consciousness and Ambivalent Attitude through the Environmental Education Training (환경교육 직무연수를 통한 교사들의 의식변화와 양면가치태도 변화 분석)

  • Lee, Jin-Heon;Sung, Jung-Jin;Choi, Jin-Ha
    • Hwankyungkyoyuk
    • /
    • v.18 no.1 s.26
    • /
    • pp.120-133
    • /
    • 2005
  • This study investigated the changes of consciousness and ambivalent attitudes about the important environmental issues among the teachers who enrolled the environmental education training. Experimental and control groups were composed with 47 and 30 person, respectively. Environmental issues were constructions of sea-wall, nuclear power plant and dam. Cronbach alpha of the self-developed questionnaire was $0.6909{\sim}0.8992$. Score were made with 5 Likert scales for consciousness, and with semantic differential half scale for ambivalent attitudes. Almost teachers(94.0% and 97.1%) have above 10 years teaching career. Strangers in environmental program were 53.2%. After environmental training, teachers' consciousness was significantly changed to negative about the construction of sea-wall for the farm field and industry complex area(p=0.019), and about the construction of dam for disaster like flood(p=0.026), and for adverse effects of citizen by fog(p=0.042). They were also significantly changed to negative about the construction of nuclear power plant for economical energy(p=0.004)', no-emission of greenhouse gases(p=0.033)', 'alternative energy(p=0.000)', 'destruction of ecology(p=0.052)' and 'social fear(p=0.009)'. The consciousness of teachers who have the experience of environmental training, were significantly changed to negative about the construction of nuclear power plant. Scores of teachers' ambivalent attitudes were made lower in experimental than control group about the construction of sea-wall and nuclear power plant. After education training, they were made lower so much as -10.0% in control, but higher much as +4.4% in experimental, and severely higher much as 86.5% in teachers who had experienced the environmental training about construction of sea-wall. Their scores were made lower so much as -3.3% in control, but much as -6.4% in control.

  • PDF

Information Breakdown Structure of Engineering Phase for Plant Project through Business Analysis (산업설비 업무 분석을 통한 설계단계 정보 분류체계)

  • Song, Young-Woongl;Cho, Hang-Min;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.3-15
    • /
    • 2009
  • Recently, it has increased projects in the Oil and Gas industry as growing plant of overseas construction market. Therefore, domestic companies need to set some aggressive plans up that secure competitiveness of international plant business such as enhancing productivity, technological ability and statistical management. Specifically in the Oil and Gas industry of overseas plant business requires implying information in EPC (Engineering, Procurement and Construction, below EPC) more, but it has not been suggested an appropriate breakdown system for contents that manages the information each EPC phase, which lead to problems such as revision of design document, occurring duplicated work and omissions of each participant. For these problems, we find market share decreasing and competitiveness running down. Thus, for increasing practical use of contents management system and construction industry's information, this paper suggests a contents breakdown system based on BPM (Business Process Management), defines business process and systematizing knowledge needed, and finally analyzing contents information that establish information among industrial facilities in Design phase which is the weakest part of domestic companies.

Virtual Design and Construction (VDC)-Aided System for Logistics Monitoring: Supply Chains in Liquefied Natural Gas (LNG) Plant Construction

  • Moon, Sungkon;Chi, Hung-Lin;Forlani, John;Wang, Xiangyu
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.195-199
    • /
    • 2015
  • Many conventional management methods have emphasized the minimization of required resources along the supply chain. Accordingly, this paper presents a proposed method called the Virtual Design and Construction (VDC)-aided system. It is based on object-oriented resource control, in order to accomplish a feed-forward control monitoring supply chain logistics. The system is supported by two main parts: (1) IT-based Technologies; and (2) VDC Models. They enable the system to convey proactive information from the detection technology to its linked visualization. The paper includes a field study as the system's pre-test: the Scaffolding Works in a LNG Mega Project. The study demonstrates a system of real-time productivity monitoring by use of the RFIDbased Mobile Information Hub. The on-line 'productivity dashboard' provides an opportunity to display the continuing processes for each work-package. This research project offers the observed opportunities created by the developed system. Future work will entail research experiments aimed towards system validation.

  • PDF

An Analytical Study on the Optimal Set-point of the Hybrid Plant (복합열원설비 운전온도 최적 설정에 관한 해석적 연구)

  • Jeon, Jong-Ug;Lee, Sun-Il;Lee, Tae-Won;Kim, Yong-Ki;Hong, Dae-Hie;Kim, Yong-Chan
    • Proceedings of the SAREK Conference
    • /
    • 2007.11a
    • /
    • pp.352-357
    • /
    • 2007
  • The objective of this study is to find the optimal set-point of a hybrid Plant, which is combined by renewable energy plant of the GSHP(Ground Source Heat Pump) and the conventional plant(chiller, boiler). The work presented in this study was carried out by using the EnergyPlus(Version 2.0). In order to validate the simulation model, field data were measured from a building. The GSHP was used as a base plant and the conventional plant as the assistant plant. Various temperatures were controlled (zone summer set-point, zone winter set-point, chilled water temperature, hot water temperature) to find the optimal set-point temperature of the system. The influence of the various set-points were analyzed seasonally.

  • PDF

A Domestic Power Companies' Strategy to Enter Asian Thermal Power Plant Market (국내 발전기업의 아시아 화력발전플랜트 시장 진출전략)

  • Park, Chang-Hyun;Moon, Seung-Jae
    • Plant Journal
    • /
    • v.7 no.4
    • /
    • pp.58-66
    • /
    • 2011
  • The power plant companies reached the culmination for growth in the domestic market. Besides, we have faced many challenges such as an electricity opening market trend for overseas, banning the use of coal due to the United nations framework convention on climate change, and the meticulous attention regarding the government's electricity charge plan. On the other hand, the overseas business has been a critical issue since China and many other developing countries expanded their projects abroad. Another factor is that power plant industry is being privatized, and it made the market regulation a bit loose. Thus, the market environment became favorable toward those companies which planned many overseas businesses. In this research, the power plant company's current condition for construction and operation as well as its technical competitiveness were analyzed, and an alternative plan using SWOT analysis for entering an oversea market was made. It dealt with both internal and external factors. Also, examined was the current situation under the power plant industry dealing with restructure for electric industry, lack of fossil fuel, and the United nations framework convention on climate change. From the research, it was suggested that many successful strategies to enter the overseas business by using the market trend I researched.

  • PDF