• Title/Summary/Keyword: pc modular

Search Result 52, Processing Time 0.024 seconds

Shear Strength of Prestressed PC-CIP Composite Beams with Vertical Shear Reinforcement (전단 철근 보강된 프리스트레스 PC와 CIP 합성보의 전단강도)

  • Suh, Jung-Il;Park, Hong-Gun;Hong, Geon-Ho;Kang, Su-Min;Kim, Chul-Goo
    • Journal of the Korea Concrete Institute
    • /
    • v.27 no.4
    • /
    • pp.399-409
    • /
    • 2015
  • Recently, the use of composite construction method using precast (PC) and cast-in-place (CIP) concrete is increased in modular construction. For PC members, pre-tensioning is used to improve efficiency of the structural performance. However, current design codes do not clearly define shear strength of prestressed PC-CIP composite members. In this study, 22 specimens were tested to evaluate shear strength of prestressed composite members with vertical shear reinforcement. The test variables were the area ratio of high-strength (60 MPa) to low-strength concrete (24 MPa), prestressing force of strands, shear span-to-depth ratio(a/d), and vertical shear reinforcement ratio. The test results showed the prestressing force did not completely restrain diagonal cracking of non-prestressed concrete in the web. Thus, the effect of prestress force was not insignificant in the effect for monolithic beams. The vertical shear strength and horizontal shear strength of the composite beams were compared with the strength predictions of KCI design method.

A Study on Work Measurement System Development Applying MODAPTS Technique (MODAPTS 기법을 이용한 작업시간 관리시스템에 관한 연구)

  • 신현표;송한상
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.16 no.27
    • /
    • pp.43-49
    • /
    • 1993
  • The purpose of this study is to develope a computer-generated work measurement system for creating and maintaining standard data as well as labor standards applying MODAPTS(Modular Arrangement of Predetermined Time Standards) technique. The system consists of three major parts. The first part is a work measurement program applying MODAPTS technique for work standards. The second part is a work scheduling program which calculate each operator's machine and job allocations, operation and load schedules, wage and wage incentives and direct labor costs etc. The last part is the case study application program for R-Instrument Manufacturing Industry. The whole system is programmed by dbase-Ⅲ and by pop-up mu for IBM PC compatibles.

  • PDF

A Development of Decision Support System for Nurse Scheduling (일 대학병원 간호직원 근무 스케쥴링 전산화 개발 사례)

  • 최용선;이은숙;박정호
    • Journal of Korean Academy of Nursing
    • /
    • v.25 no.1
    • /
    • pp.80-87
    • /
    • 1995
  • The critical problem of nurse scheduling in the hospital is determining the day-to -day shift assignments for each nurse for the specified period in a way that satisfies the given requirements of the hospital. As nurse scheduling involves many factors and requirements, manual scheduling requires much time and effort to produce an adequate schedule. A PC - based decision support system, developed in Turbo - C/sup ++/, for nurse scheduling was introduced. The system is composed of 4 sub-systems : 1) Entering basic information for each nursing unit : 2) Generation of an appropriate initial schedule and revised schedule for a given period, maximally satisfying each nurse's duty requests : 3) Provision of variety of statistical information, and 4) Help messages for each modular function. Icons and a mouse are used for easier graphic user interface and reducing the need for typing efforts. This system can help nurses develop quick and easy schedule generation and allow more time for the patient care.

  • PDF

디지털기술과 산업 전환 : 전자산업의 사례

  • Bae, Yeong-Ja
    • Journal of Technology Innovation
    • /
    • v.11 no.2
    • /
    • pp.219-238
    • /
    • 2003
  • This study aims to investigate the impact of wide use of digital technology, in particular, the Internet, on innovation process and corporate strategy in electronics industry. The introduction of digital technology has changed innovation process, business model and organizational structure of the electronics companies. With the wide use of digital technology, the entire value chain of electronics industry from procurement, sales, and marketing to R&D and manufacturing has been restructured. This paper examine how digital technology has changed firms' behaviors in various areas through e-commerce, virtual reality and simulation, the rise of a new type of firm called EMS (Electronics Manufacturing Services), and etc. Amidst these changes building up innovation-friendly organization has emerged as a critical concern for firms. Due to the striking decrease of transaction cost, a network type of organization has proliferated, and a business function turns into a modular organization. As a whole, digital technology has pushed electronics firms into developing their own business model, which takes consideration of standardization of business platform and their core competency.

  • PDF

Customer participatory design for mass customization(Focused on development of interactive design toolkit) (매스커스터마이제이션을 위한 소비자 참여 디자인 방법(인터랙티브 디자인 툴킷의 개발을 중심으로))

  • 변재형
    • Archives of design research
    • /
    • v.16 no.4
    • /
    • pp.5-14
    • /
    • 2003
  • This study suggest the development and application of the Interactive Design Toolkit as a participatory design method for general customer who are non-expert on design activity to participate in design process of mass customization. In order to let general customers to express their design needs, we have to make a familiar and direct communication method for them. And, customer's design needs should be transformed into digital media. This study define the Interactive Design Toolkit as a design tool for customer participation by direct manipulation of computer system for simulation of design needs by customer themselves. The Interactive Design Toolkit is based on a PC-based image perception system and its application. User can make virtual models in virtual space by manipulating physical objects in real world. And, The toolkit can be used in the field of participatory design for deliverer side customization, especially in system kitchen which is manufactured and distributed in modular system. More improved design toolkit for manipulating 3 dimensional shape is needed for consumer product design and car styling.

  • PDF

Design, Implementation and Test of New System Software Architecture for Autonomous Underwater Robotic Vehicle, ODIN-III (시험용 자율 무인 잠수정, ODIN-III의 새로운 시스템 소프트웨어 구조의 설계와 구현 및 실험)

  • 최현택;김진현;여준구;김홍록;서일홍
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.10 no.5
    • /
    • pp.442-449
    • /
    • 2004
  • As underwater robotic vehicles (URVs) become attractive for more sophisticated underwater tasks, the demand of high performance in terms of accuracy and dexterity has been increased. An autonomous underwater robotic vehicle, ODIN (Omni-Directional Intelligent Navigator) was designed and built at the Autonomous Systems Laboratory of the University of Hawaii in 1991. Since 1991, various studies were conducted on ODIN and have contributed to the advancement in underwater robotics. Its refurbished model ODIN II was based on VxWorks in VMEbus. Recently, ODIN was born again as a PC based system, ODIN III with unique features such as new vehicle system software architecture with an objective-oriented concept, a graphical user interface, and an independent and modular structure using a Dynamic Linking Library (DLL) based on the Windows operating system. ODIN III software architecture offers an ideal environment where various studies for advanced URV technology can be conducted. This paper describes software architecture of ODIN III and presents initial experimental results of fine motion control on ODIN III.

VEHICLE ELECTRIC POWER SIMULATOR FOR OPTIMIZING THE ELECTRIC CHARGING SYSTEM

  • Lee, Wootaik;Sunwoo, MyoungHo
    • International Journal of Automotive Technology
    • /
    • v.2 no.4
    • /
    • pp.157-164
    • /
    • 2001
  • The vehicle electric power system, which consists of two major components: a generator and a battery, which have to provide numerous electrical and electronic systems with enough electrical energy. A detailed understanding of the characteristics of the electric power system, electrical load demands, and the driving environment such as road, season, and vehicle weight is required when the capacities of the generator and the battery are to be determined for a vehicle. An easy-to-use and inexpensive simulation program may be needed to avoid the over/under design problem of the electric power system. A vehicle electric power simulator is developed in this study. The simulator can be utilized to determine the optimal capacities of generators and batteries. To improve the expandability and easy usage of the simulation program, the program is organized in modular structures, and is run on a PC. Empirical electrical models of various generators and batteries, and the structure of the simulation program are presented. For executing the vehicle electric power simulator, data of engine speed profile and electric loads of a vehicle are required, and these data are obtained from real driving conditions. In order to improve the accuracy of the simulator, numerous driving data of a vehicle are logged and analyzed.

  • PDF

Adaptation of a Key Distribution Scheme for VSAT Satellite Communications (VSAT 위성통신 보호를 위한 키 분배 방식의 적용)

  • Park, Jeong-Hyeon;Im, Seon-Bae
    • The Transactions of the Korea Information Processing Society
    • /
    • v.6 no.1
    • /
    • pp.115-122
    • /
    • 1999
  • This paper presents a key distribution scheme based on the Yacobi scheme that does not use the secret key provided by key distribution center, but uses instead a random number generated y the user. The scheme is independent of the exposure of the secret key. this paper also presented the key distribution schemes based on the Diffie-Hellman (DH) and ID (identity). The schemes based on the solving of the discrete logarithm and prime resolution into factors are better on the expose of secret key. The proposed scheme based on the DH was applied to VSAT satellite communications and simulated on PC using Montgomery algorithm for modular and MD5 (Message Digest) for hashing function.

  • PDF

Establishment of Remote Monitoring System for Wind Turbine Test Sites Based on Hierarchical Architecture (계층적 구조를 갖는 풍력발전 실증단지 원격 풍황 모니터링 시스템 구축)

  • Cho, Byung-Ha;Lee, Jeong-Wan
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.26 no.9
    • /
    • pp.81-87
    • /
    • 2009
  • In this paper, remote monitoring system for wind turbine site is developed. This system is a hierarchical reliable monitoring system connected by wireless communication channels between monitoring host computer and modular slave measuring subsystems. The design of this systems; the slave measuring subsystems is placed in meteorological tower and wind turbine, and the supervisory host computer is in the safety zone. The slave measuring subsystems signals are from a meteorological tower, wind turbine generator and tower. For monitoring and command function, the supervisory computer is implemented with a PC using graphic user interface. This system can be transferred the information among host computer and remote computers through the Ethernet. Consequently we can get reliability but economic system. The system has the concept of universality and modularity, so it is simple and easy to implement in wind turbine test sites.

Comparison of Raw Material Inventory Management Policies for a Precast Concrete Production Plant (프리캐스트 콘크리트 제작공장에 대한 원자재 재고관리 정책 비교)

  • Kwon, Hyeonju;Jeon, Sangwon;Lee, Jaeil;Jeong, Keunchae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.5
    • /
    • pp.41-54
    • /
    • 2024
  • In this study, we compare and analyze the performance of three inventory management policies for raw material inventory management in a Precast Concrete production plant: Fixed Order Quantity Policy (FOQP), Fixed Order Interval Policy (FOIP), and (s, S) Ordering Policy (sSOP). In order to make more realistic conclusion, we developed and utilized the ARENA simulation model, a performance evaluation tool that considers the variance of raw material demand and supply for the entire production process in a PC production plant using multiple raw materials. For the three policies, reorder point, order quantity, target level, and order interval parameters were initialized by using Economic Order Quantity (EOQ) model and then optimized through OptQuest. As a result of optimization, inventory management costs were reduced by an average of 97.28% compared to the EOQ model that does not consider the variance of demand and supply. After setting three influencing factors, Project Occurrence Cycle (POC), Raw Material Lead-time (RML), and Unit Stock-out Cost (USC), a performance evaluation was conducted for the three policies. As a result of evaluation, the inventory management costs of FOQP and sSOP, which determine order intervals by considering inventory levels by real-time or daily, were 30.6% and 27.9% lower than FOIP with fixed order intervals respectively. In addition, inventory management costs were affected by RML and USC factors excluding POC, but the differences were 2.17% and 2.09% respectively, which were not large due to the optimization of parameters for responding the variance of raw material demand and supply.