A Study on Work Measurement System Development Applying MODAPTS Technique

MODAPTS 기법을 이용한 작업시간 관리시스템에 관한 연구

  • Published : 1993.05.01

Abstract

The purpose of this study is to develope a computer-generated work measurement system for creating and maintaining standard data as well as labor standards applying MODAPTS(Modular Arrangement of Predetermined Time Standards) technique. The system consists of three major parts. The first part is a work measurement program applying MODAPTS technique for work standards. The second part is a work scheduling program which calculate each operator's machine and job allocations, operation and load schedules, wage and wage incentives and direct labor costs etc. The last part is the case study application program for R-Instrument Manufacturing Industry. The whole system is programmed by dbase-Ⅲ and by pop-up mu for IBM PC compatibles.

Keywords