• 제목/요약/키워드: payback

검색결과 176건 처리시간 0.02초

6kW급 태양열 온수급탕 시스템의 실증실험 및 분석 (제4보 경제성비교 및 경쟁력강화) (Verification Experiment and Analysis for 6kW Solar Water Heating System (Part 4 : Comparing Economics and Raising Competitiveness))

  • 이봉진;강채동;이상렬;홍희기
    • 설비공학논문집
    • /
    • 제17권3호
    • /
    • pp.232-242
    • /
    • 2005
  • It has been recognized that solar water heating systems are economically inferior to conventional gas water-heaters and boilers using light oil as fuel in spite of having practical possibilities among other alternative energy facilities in Korea. The solar system, however, should be revaluated due to the sharp rise of oil prices recently. We have calculated the energy amount and cost through a series of research projects for the system by experiment and simulation, which lead to analyzing reliable life cycle costs. For the economic analysis, the gas water-heater and light oil boiler were taken as base cases while the solar systems implemented with these facilities were compared as alternatives. As a result, the solar system using the light oil as an auxiliary fuel surpassed the light oil boiler in economics. And a $50\%$ government subsidy for the initial cost is needed to maintain competitiveness with the gas hot-water heater. With this support, the simple payback period of the system can approach 12.8 years under $20\%$ additional curtailment of expenditure.

포항철강산업단지 내부 폐열 회수를 위한 에너지 교환망 구축 방안 분석 (An Analysis on the Construction of Energy Exchange Network to Recover Waste Heat Energy in Pohang Steel Industrial Complex)

  • 이광구;정인경;전희동
    • 청정기술
    • /
    • 제17권4호
    • /
    • pp.406-411
    • /
    • 2011
  • 포항철강산업단지에서 발생하는 폐열을 회수하기 위하여 주요 기업의 폐에너지 발생 규모에 대한 데이터베이스를 설문조사를 통해 구축하고, 가시적인 기법을 적용하여 에너지 교환망 구축방안을 고려하였다. 폐열의 온도 수준, 유효에너지 발생량, 폐에너지 발생 기업과 예상 수요 기업의 거리, 구축비용 등의 관점에서 잠재성이 높은 에너지 교환망을 제시하고 경제성을 평가하였다. 최종 제안된 4개 기업의 에너지 교환망의 투자비 회수기간은 평균 2.8년이고, 에너지 절감량은 연간 4,778 TOE로 분석되었다. 현재 사용되는 LNG를 폐열 회수로 대체하면 연간 약 11,160 $CO_2$ ton을 감축할 수 있다.

학교시설 임대형민간투자사업(BTL)의 VE.LCC 사례 분석 (VE.LCC Case Analysis on the Build-Transfer-Lease(BTL) Projects of School facility)

  • 이도형;박우진;주국식;조기훈
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.143-148
    • /
    • 2008
  • 본 연구는 BTL 사업 중 학교시설에 대한 VE LCC를 적용한 결과에 대한 효과를 분석한 것이다. BTL 사업은 민간사업자가 자금을 투자하여 공공시설을 건설 한 후 시설의 소유권을 정부에 이전하는 대신 일정기간동안 시설의 사용 수익권한을 획득하여 그 권한을 정부에 임대하고 그 임대료로 투자비를 회수하는 사업방식이다. 정부는 건설기술관리법 시행령 제 38조의 13 '설계의 경제성 등 검토'를 제정하여 100억 이상의 건설공사에 경제성 검토를 실시하도록 법적으로 제도화하였다. 학교시설 BTL 사업은 2006년부터 시작되었지만, 학교시설 BTL 사업의 특성상 사업실적이 적고, VE 워크샵 수행기간도 짧고, VE 적용 후 데이터베이스 구축이 타 사업에 비하여 적은 실정이다. 따라서 본 연구에서는 최근 학교시설 BTL 사업 설계 VE 사례분석을 통하여 VE LCC의 효과를 분석하고, VE 데이터베이스로 활용하고자 한다.

  • PDF

엑셀 스프레드시트를 활용한 온실가스 정보시스템 구축 (An Establishment of Greenhouse Gas Information System using Excel Spreadsheets)

  • 이해중;정영배
    • 산업경영시스템학회지
    • /
    • 제40권4호
    • /
    • pp.129-136
    • /
    • 2017
  • Climate change is the biggest environmental issue of our times. A variety of activities to reduce greenhouse gas emissions have been in progress to observe the Kyoto Protocol. Especially, the Energy Target Scheme is created to reduce greenhouse emission with the supervision of Korean government. This includes Green-house Gas Information Systems to promote activities in the private sector to reduce green-house gas emissions, to cut a cost of energy use, and to reduce GHG emissions. Also, the system has calculated the amount of greenhouse gases. Without any additional investment, 2.75% savings are increased over the previous year. In service sector, a cooperation of customers and employees is necessary. A reduction of GHG emissions requires a proper service organization, considering an amount of investment and payback period. Without any additional investment or replacement, employees can save energy easily turning off ventilation systems an hour before employees' departure, installing timers to turn off water purifiers and vending machines after some period of no use. The Green-house Gas Information System is similar to that of Environmental Management System. However, the Excel is the best program to calculate an amount of green-house gas emissions, and to assess for a reduced amount of GHG emissions. A goal of this research is to propose a practical method in the private sector to calculate an amount of green-house gases. The Green-house gas Information System based on Excel spreadsheet gives standards for good evaluation. The greenhouse gas information system establishes and executes the policies and objectives related to greenhouse gas emissions Similar to ISO 14001 environment management system structures, the advantages of using simplified Excel Sheet for calculating GHG emissions and reducing GHG emissions are easy to access.

회귀분석을 이용한 소각장의 소각열 회수 경제성 분석 연구 (Economic Assessment of the Heat Recovery from Incineration Plants Based on Regression Analysis)

  • 윤정민;손형민;박동윤;장성주
    • 자원리싸이클링
    • /
    • 제23권3호
    • /
    • pp.3-12
    • /
    • 2014
  • 본 연구에서는 대표적인 폐기물 최종 처리시설인 소각장을 대상으로 소각열 회수에 따른 경제성 분석을 수행하였다. 국내에서 운영 중인 소각장의 건설 및 운영비용, 소각열 회수량에 대한 함수식을 회귀분석을 통해 도출하였으며, 이를 바탕으로 생애주기비용을 비교함으로써 소각열 회수에 대한 경제성을 비교 분석하였다. 도출된 회귀식으로 일일 80톤 처리규모의 소각장을 기준으로 경제성 분석을 진행한 결과, 소각열 회수시 추가 설비 및 인건비로 인한 초기투자 비용 및 운영비용이 크지만, 열회수에 따른 LNG 대체효과로 계산시 11년 이상 운영할 경우 미회수 소각장과 비교하여 경제적 우위성이 있었다. 또한 열 판매와 온실가스 감축효과를 편익으로 계산할 경우 19년의 자본회수기간이 소요됨을 확인하였다.

단열 도료 코팅 창호의 냉난방부하 특성분석 및 경제성 평가 (The Estimation of Heating, Cooling Load and Economical Efficiency Analysis of Insulation Paint Coating Windows)

  • 정열화;김병수
    • 한국태양에너지학회 논문집
    • /
    • 제31권6호
    • /
    • pp.95-102
    • /
    • 2011
  • The purpose of study is to estimate heating, cooling load performance and economic efficiency in office building with applied the functional paint. this paint can reduced SHGC(Solar Heat Gain Coefficient) on the glazing surface by coating. In this study, estimated to compared with double glazing, low-e glazing, IP(Insulation Paint) and IPu(Insulation UV-Cut Paint) coating glazing. As a result of this study, 1)heating & cooling load Analysis, SHGC value and U-factor of double glazing is about 0.70 and 3.29($W/m^2K$). low-E glazing is about 0.65 and 2.70($W/m^2K$). Two-side it is about 0.27 and 3.25($W/m^2K$). When compared to double glazing, annual heating & cooling load of low-E glazing, Two-side IPu and IP paint coating glazing is 3,012MWh($124kWh/m^2$), 2,910MWh($120kWh/m^2$), 2,867MWh($118.4kWh/m^2$) and 2,867MWh($118.4kWh/m^2$). It i sreduced to 2.0%, 5.2%, 6.7%, and 6.7% respectively. 2)the estimation of economic efficiency, low-e glazing installed in office building can not recover the investment within a lifetime 40years. but IPu and IP paint, two-side coating in glazing, have a payback period of 13 years respectively.

몽골의 가정용 PV-ES 하이브리드 시스템 개발을 위한 연구 (The Study on Development of PV-ES hybrid system for Mongolian Household)

  • ;;박준형
    • 전기학회논문지
    • /
    • 제66권12호
    • /
    • pp.1905-1912
    • /
    • 2017
  • In recent years, Ulaanbaatar, a capital of Mongolia has witnessed major problem that air quality reaches hazardous level during the winter season. Coal combustion for heating of every house in "Ger" district is main reason. One way to reduce the air pollution is mass usage of electric heater. However, there are several difficulties such as overload and degradation of transformers and other equipment used in distribution and transmission systems as well as power shortage occurrence in evening peak period due to residential consumption. This study aims to contribute for solving the air pollution and power shortage problem in Mongolia. One possible solution could be distributed generation (DG) with photovoltaic (PV) penetration. In this study, PV with energy storage (ES) hybrid system to reduce peak load is analyzed. We proposed the suitable structure of PV-ES hybrid for Mongolian household, and suggested several operation scenarios. Optimal operation algorithm is carried out based on a comparison aspect from economical, grid impact and PV penetration possibility. The economic analyse shows annual income of 520USD, and has a payback period of 8 years for selected scenario. The proposed PV-ES system structure is verified by experimentation set on the building rooftop in city center. The suggested scenario is planned to apply for system in further research.

바이오매스 폐기물의 에탄올 생산 공정의 기술경제성 평가 (Techno-economic Evaluation of an Ethanol Production Process for Biomass Waste)

  • 곽인섭;황종하;이시훈
    • 공업화학
    • /
    • 제27권2호
    • /
    • pp.171-178
    • /
    • 2016
  • 세계 각국은 석유자원의 고갈로 인한 고유가, 지구온난화 등의 환경문제를 해결하기 위하여 많은 노력을 하고 있다. 그중 기존 화석연료를 대체할 수 있는 재생 가능한 청정 에너지원으로 바이오 연료가 주목받고 있다. 그러나 기존의 바이오연료 생산기술은 식량자원인 사탕수수, 옥수수 등을 사용하므로 이를 대체하는 기술개발이 요구되고 있다. 이에 본 연구에서는 식량자원을 대체할 폐기물의 가스화와 혼합 알코올 합성공정이 연계된 간접 알코올 전환 공정의 기술 경제성 평가를 수행하였다. 국내에서 공급되는 바이오매스 폐기물 자원량을 고려한 2000톤/일 급의 전환 공정에서 매일 533000 L의 연료용 에탄올을 생산한다고 가정하였고 이를 위해 필요한 경제성 자료는 기발표된 자료들로부터 계산되어 경제성 분석에 이용되었다. 경제성 분석은 원금회수기간과 내부수익률(internal rate of return, IRR) 및 순현재가치(Net Present Value, NPV)로 진행되었으며, 원료비용과 초기 투자비, 주요 공정비용 및 에탄올 가격 변화, 운용비용의 민감도 분석을 진행하여 각 항목별 민감도를 고찰하였다.

스프링클러 설비투자의 경제적 효용성 분석에 관한 연구 (A Study on the Economic Utility Analysis of Sprinkler System Installation)

  • 김용달;최영화;윤명오
    • 한국화재소방학회논문지
    • /
    • 제24권1호
    • /
    • pp.31-39
    • /
    • 2010
  • 우리나라는 선진국에 비하여 스프링클러설비 의무 설치대상이 다소 제한적인데도 불구하고 대부분의 건축물 소유주 또는 운영주체들은 법률에서 지정하고 있는 설치대상 건축물에 한해서만 설치하거나, 건축물 설계 시 스프링클러설비의 설치대상 기준에 해당되지 않도록 하는 경향이 있다. 이는 건축물의 화재 안전성 보다는 스프링클러설비 설치비용의 절감이 우선적이라고 생각하고 있기 때문으로 사료된다. 따라서 본 연구에서는 스프링클러설비를 설치하고 관리하는데 소요되는 제반 비용을 투자의 개념으로 하여 이로부터 얻을 수 있는 급부를 추정하였다. 결과적으로 스프링클러설비의 투자비용과 설치하였을 경우 얻을 수 있는 경제적 이득을 경제적 효용성 분석을 통하여 비교한 결과, 초기 투자비용 회수기간이 건축물의 내구연한의 약 1/20 수준으로 나타났으며 효용성도 비용의 2배 이상으로 나타났다. 따라서 스프링클러 설치는 경제적 효용성을 갖춘 제도로 볼 수 있어 적극적인 확대를 고려해 보는 것이 바람직할 것이다.

DR콩고 루붐바시 슬래그재처리사업(再處理事業)의 경제성(經濟性) 평가(評價) (Feasibility Analysis on Slag Reprocessing Project in Lubumbashi, Democratic Republic of the Congo)

  • 김유정;김대형
    • 자원리싸이클링
    • /
    • 제21권1호
    • /
    • pp.49-59
    • /
    • 2012
  • 콩고민주공회국(Democratic Republic of Congo, 이하 DR콩고)은 세계적 자원부국으로 특히 코발트, 철광석, 구리, 다이아몬드 등이 풍부하다. 주요 광물자원의 대부분을 수입에 의존하고 있는 한국은 2008년부터 콩고정부와 한국이 항만 건설을 지원하고, 그 보상으로 루붐바시 슬래그재처리를 통해 아연, 코발트, 구리 등 유용광물을 회수해가는 프로젝트에 대한 검토를 추진하여 왔다. 본 연구는 DR콩고의 루붐바시 슬래그 재처리 사업에 대한 경제성 분석을 수행한 것으로, 연구 결과에 따르면 투자회수기간(pay back period)은 6.7년, 순현재가치(NPV) 3,400만달러, 내부수익률(IRR)은 17.4%로 나타났다. 또한 세제, 고정비용, 운영비용, 지원가격 등에 대한 불확실성을 적용한 민감도 분석 결과 프로젝트의 순현재가치는 최저 -2,480만달러에서 최대 9,270만달러로 나타났다.