• Title/Summary/Keyword: pay-back period

Search Result 23, Processing Time 0.021 seconds

An Economic Feasibility Study of Manganese Nodule in Korea Area: Clarion-Clipperton Fracture Zone (심해저 망간단괴 개발사업의 경제적 타당성 재평가)

  • Nam, Kwang-Hyun;Oh, Wee-Yeong;Kwon, Suk-Jue
    • Ocean and Polar Research
    • /
    • v.26 no.2
    • /
    • pp.187-197
    • /
    • 2004
  • The purpose of this paper is to investigate economic feasibility of manganese nodules in Korea area (Clarion-Clipperton Fracture Zone). We assumed that the production scale of manganese nodules were 3.0MT or 1.5MT and analyzed that the capital cost and operating cost were estimated in the four sectors, exploration, mining, transportation and metallurgical process. The capital cost and operating cost evaluation reflects the latest technical practices. First, for analyzing economic feasibility, the scenario suggests that the production of 4 metals can be made for 25 years. Assuming the discount rate at 8.0%, equity capital at 50% and tax at 27%. When manganese nodule were mininged 3.0 MT, economic feasibility analyses showed that IRR was 12.8 and pay-back period was 9.2 years, and when manganese nodules were mininged 1.5 MT, economic feasibility analyses showed that IRR was 4.0 and pay-back period was 11.8 years. This study indicated there is economic validity of at the product of manganese nodules 3.0 MT. In addition, we carried out a sensitivity analysis at the change of cobalt price on mining 1.5 MT. The result of sensitivity analysis clearly showed that economic validity is high at increasing of cobalt price 50% up.

Economic Evaluation of the HAM300 Yarding Operation with Tree-Length Harvesting Method in Larix kaempferi Forest Stands (낙엽송 전간수확작업에서 HAM300을 이용한 집재작업의 작업일수 및 작업량을 고려한 경제성 분석)

  • Lee, Eunjai;Im, Sangjun;Lee, Sung-Jae;Han, Sang-Kyun
    • Journal of Korean Society of Forest Science
    • /
    • v.109 no.1
    • /
    • pp.72-80
    • /
    • 2020
  • Two strategies for calculating economic feasibility are the machine rate and cash-flow methods. This study used the cash-flow method to evaluate the economic feasibility of the HAM300 yarding operation for extracting tree length logs in Larix kaempferi forest stands. In financial analysis based on 7-year cash-flow, the net present value and pay-back period method were used. We analyzed two scenarios: operating opportunities (50, 100, 150, and 200 days per year) and productivity change yield (7.5 and 10.5 ㎥/scheduled machine hour: SMH). The analysis indicated that high rates of return on extraction activity investment can be achieved when machines are used for >150 days per year. In addition, improved productivity (10.5 ㎥/SMH) increased financial feasibility compared to current productivity (7.5 ㎥/SMH) when machines were operated for 100 days per year. These results suggest that the appropriateness of HAM300 harvesting depends on the number of annual operating days and productivity.

Analysis of Life Cycle Cost for Heat Source Equipments in Buildings for Adolescent Trainees (청소년 수련관의 열원설비 대안별 생애주기 비용에 관한 연구)

  • Ahn, Chang-hwan;Pang, Seung-ki;Baik, Yong-gyu
    • KIEAE Journal
    • /
    • v.5 no.3
    • /
    • pp.25-31
    • /
    • 2005
  • Computer simulations were performed for Heating Ventilating and Air-Conditioning (HVAC) systems to figure out more efficient maintenance methods for the building used for adolescent trainees. This study aims at suggesting design alternatives for optimum operation and performing life cycle cost (LCC) for each alternative. First, the capacity of the heat source equipment was determined using annual maximum heating and cooling loads. Annual loads were calculated and applied to the alternative for the purpose of calculating annual energy cost. Second, several types of data were collected to predict energy cost. Finally, the pay back period for each alternative was calculated using total cost estimation during standard duration period. This study indicates that the absorption chiller that does not occupy most part of a mechanical room, and does not need much operation cost was most economical.

A Study on the Factors Affecting the Low Back Pain of Workers in Hospital (병원 근무자의 요통 발생 요인에 관한 연구)

  • Jeong, Jin-Young;Son, Kyung-Hyun
    • Journal of Korean Physical Therapy Science
    • /
    • v.16 no.3
    • /
    • pp.55-66
    • /
    • 2009
  • Background: The purpose of this research was to investigate the factors affecting the low back pain of workers in hospital. 214 subjects waking at two general hospitals in Yosu city participated in this survey. Subjects consisted of doctors, nurses, medical engineers, officers and general laborers. The survey data were collected by a written questionnaire which made out by themselves for 25 days, from fourth August to 29th August, 2008. Methods: The questionnaire consisted of four categories, general, occupational, working habitual and the daily living characteristics. The collected data were analyzed by Chi-square test based on the present or absent of low back pain. Results: 1. In the general characteristics, low back pain had no significant relationship to all factors, sex, ago, body mass index, weight and height. 2. In the occupational characteristics, the phase of distribution of low back pain had statistical significant differences in the working hours a week, satisfaction of pay, satisfaction of occupation(p<0.05). However low back pain did not significantly related to the kind of occupation, period of work and degree of stress. 3. In the habitual characteristics, low back pain was significantly influenced by working posture, frequency of using lumbar and heavy material lifting, monotonous repetition of working operation and noise(p<0.05). No significant difference was shown in the factor of convenience of chair. 4. In the daily living characteristics, low back pain shown the significant differences in walking time a day, status of health and smoking pattern(p<0.05). there were, however, no significant differences in the aspect of the kind of house and bed, sleeping attitude, driving, riding time on the vehicle, exercising, frequency of cultural life and drinking alcohol. Conclusion: when I see above resultants totally, it appears a higher incidence caused by working environment rather than living habit and then consequently compared to hospital workers, they also have high incidence like others. In order to reduce incidence of low back pain and enjoy the our life we need to educate ourselves preventing program for low back pain and try to effort for preventing of low back pain on each department and individual.

  • PDF

Buyers' Payment of Price by Letters of Credit under CISG (국제물품매매협약상 매수인의 신용장에 의한 대금지급)

  • Heo, Hai-Kwan
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.41
    • /
    • pp.103-132
    • /
    • 2009
  • In international sales of goods, the buyer must pay the price for the goods as required by the contract and CISG, The buyer's this obligation includes taking such steps and complying with such formalities as may be required under the contract, which includes providing the seller with relevant letter of credit through the issuing bank. Where the parties have not stipulated the time limit within which the credit should be opened, but there is an agreed date or period for shipment, the time limit for the L/C opening should be calculated back from the agreed date of shipment or the first date of shipment, while, in addition, the buyer should open the L/C sufficiently earlier than the shipment date in order for the seller to be able to know the L/C's opening before beginning to ship the goods. The L/C provided the buyer should conform to the contract of sale. Therefore, for example, when an unconfirmed L/C is provided violating the agreement or the L/C opened states that, under a FOB contract, a "freght prepaid" bill of lading shall be presented as a required document of the L/C, the buyer has failed to perform his obligation. If the buyer fails to perform his obligations to provide the letter of credit, the seller may require the buyer to perform that obligation; may fix an additional period of time of reasonable length for performance of the obligation; or, the seller may declare the contract avoided, if the failure amounts to a fundamental breach of contract, or if the buyer does not, within the additional period of time fixed by the seller, perform the obligation; and the seller claim damages. However, when a relevant L/C has been issued for the seller, as a rule, he cannot ask directly for the buyer to pay the price before avail himself of the L/C first.

  • PDF

Life Cycle Cost Analysis about Renewable Energy Facilities Combination of Photovoltaic system, Solar thermal system and Geothermal system (태양광발전, 태양열 급탕, 지열시스템의 신재생에너지설비 조합에 관한 LCC 분석)

  • Chun, Sang Hyun;Ahn, Jang-Won;Kim, Wonwoo;Cho, Seung-Yun
    • KIEAE Journal
    • /
    • v.12 no.1
    • /
    • pp.105-112
    • /
    • 2012
  • When a building is planned and designed, the design should be able to minimize the cost during the whole life cycle of the building. This study has begun to analyze LCC about the alternative design which is applicable to renewable energy facility construction. It is reviewed domestic and foreign papers about the trend of LCC technology and it is determined the analytical method to analyze the LCC of renewable energy. Regarding the review of alternatives, it is chosen the three alternatives which are able to designed combing the renewable energy facilities and it is performed the LCC analysis about each alternative. Alternative 1 is Photovoltaic + Solar Thermal + Photovoltaic /Wind Power, Alternative 2 is Geothermal + Photovoltaic, and Alternative 3 is Photovoltaic + Solar Thermal. The LCC analysis is present value method, its analytical period is 40 years and it is applied 3.2% of real discount rate. As a result, it is proved that Alternative 1 and Alternative 3 are not able to collectible the early investment cost during the analytical period and Alternative 2 is analyzed that its pay-back period of early investment cost is about 31 years. As the final outcome of this study on case analysis, it is more advantageous to use the combination of Geothermal and Photovoltaic energy than to use the other combination in LCC aspect.

A Study on Economic benefits for Water Control Device Installed with a Flush Valve on a Toilet (세척밸브 급수제어장치 설치에 따른 경제적 효과 분석)

  • Park, Kang-Hyun;Kim, Su-Min
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.23 no.10
    • /
    • pp.656-661
    • /
    • 2011
  • The amount of water resources that can be used tend to be decreased gradually. In contrast, the rapidly increasing water consumption is a problem that need to be addressed. Renovation and equipment replacement to improve energy efficiency and to reduce expenditure for building usage is required. But the excessive initial investment cost and the prolonged of pay back period may be uneconomical choice. Water usage for cleaning the toilet bowl accounts for 27%of the total water usage. Water-saving valve that can select the amount of water for cleaning toilet bowl can be reduced expenditure. After installing water-saving valve, analysed the economic effects. Water-saving valves compared with flush valves, and researched the amount of water usage. Then analyzed for the economic effects. Water-saving valve was used 5.6 ${\ell}$/time for cleaning toilet bowl. In contrast, flush valve was consumed 8.4 ${\ell}$/time. Water-saving valve's water-saving rate was 33.3%. The initial payback period for Water-saving valve was 459.5 days. By a small investment in water saving valve, the economic benefits can be obtained.

Study on Economic analysis and Dessemination Policy of Unused Energy (미활용에너지의 경제적 효과 및 보급지원방안 연구)

  • An, Hyung-Jun;Baek, Sung-Kwon;Heo, Eunn-Yeong
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2008.05a
    • /
    • pp.95-98
    • /
    • 2008
  • Temperature difference energy is a good energy source replacing the fossil fuels. In the study, we classified the temperature difference energy as 4 types by the source & using method. For the understanding economic property of temperature difference energy, we tried simle economic analysis. As the result, Pay back period of 4 case of the temperature difference energy are from 1.23 to 12.65 years. Major factors influenced economic effect are operation time and energy user distance from the temperature difference energy source. If we can select optimal capacity and look for more effient energy users, Temperature difference energy play a important role of replacing fossil energy. So, for dess emination of temperature difference energy, we suggest that temperature difference energy must be included in renewable energy. Applying the effective methods among various promotion program of renewable energy policy, utilization of temperature difference energy could be activated.

  • PDF

A Study on the Benefit-Cost Analysis of Photovoltaic System in the Greenhome (그린홈 적용 태양광 발전시스템의 편익비용분석에 관한 연구)

  • Jung, Soon-Sung
    • Journal of Power System Engineering
    • /
    • v.18 no.3
    • /
    • pp.112-117
    • /
    • 2014
  • The purpose of this study is to suggest the benefit-cost analysis for photovoltaic system in greenhome. Perspectives of benefit-cost analysis for photovoltaic system in greenhome is participant, non-participant, administrator and nation. This study identifies the cost and benefit components and benefit-cost calculation procedures from four major perspectives : participant, non-participant, administrator and nation. The results of benefit-cost analysis from each perspective can be expressed in a variety of ways, but in all cases it is necessary to calculate the net present value of photovoltaic system impacts over the lifecycle of those impacts.

Economic Evaluation Method for Marine Electric Generating Systems Using a Comprehensive Economic Index (종합 경제성 평가지수에 의한 선박 발전장치의 경제성평가법)

  • Jeong-Je Kim;Seung-Taek Chang
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.30 no.1
    • /
    • pp.10-19
    • /
    • 1993
  • Design optimisation generally necessitates a tool of assessing the economics of designs. This paper proposes a method of assessing the economics of marine electric generating systems. The pay back period(PBP) and the net present valuve(NPV) of the investment for a designed project are properly converted into a economic index. The mechanical factors dominating the easiness in operating the system are also assessed and quantified to form a index which eventually is added to the economic index producing a comprehensive economic index. The method has been tested on a design example and it's validity has been shown.

  • PDF