• 제목/요약/키워드: paved track

검색결과 23건 처리시간 0.028초

시멘트모르터 충진형 포장제도의 최적 설계 (Optimal Design of Cement Mortar Pouring type Paved Track)

  • 이일화
    • 한국철도학회논문집
    • /
    • 제9권2호
    • /
    • pp.222-229
    • /
    • 2006
  • Recently, the development of the paved track is required as a low-maintenance of conventional line. The main reason is that the line capacity and bearing of track are increased progressively. The important factors of paved track are stability and applicability. To be based on this subject, Cement Mortar Pouring(CMP) paved track is developed. CMP paved track is a kind of ballast reinforced track using the prepacked concrete technique. The most important thing to design the paved track is to optimize the track structure considering various conditions. Because construction environment is very limited, cost is expensive and it has very complicated behavior. On this paper, structural characteristics of the paved track are investigated using the 3D finite element analysis to verify the optimized structure of the CMP track.

도시철도 시험선 구간에서의 포장궤도 시험부설 및 성능평가 (Construction and Evaluation of the Paved Track on Test Line)

  • 이일화;심재규;이춘호;박균서;류경식
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.1115-1120
    • /
    • 2007
  • Recently, the development of the paved track is required as a low-maintenance of conventional line. The main reason is that the line capacity and bearing of track are increased progressively. The important factors of paved track are stability and applicability. To be based on this subject, Cement Mortar Pouring(CMP) paved track is developed. CMP paved track is a kind of ballast reinforced track using the prepacked concrete technique. The most important thing to design the paved track is to optimize the track structure considering various conditions. In this study, the CMP track is constructed(30m) on a test line and the track performance tested by running train to evaluation the capability and workability. The track performance are tested to confirm the vibration acceleration of the car body, wheel and track, accumulated settlement, track irregularity and crack of surface.

  • PDF

도시철도 본선 토공구간에서의 포장궤도 시험부설 (Test Construction of the Paved Track at Subway Main Line)

  • 이일화;강윤석;공선용;김상진;이순구;정연식
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.1689-1694
    • /
    • 2008
  • Recently, the development of the paved track is required as a low-maintenance of conventional line. The main reason is that the line capacity and bearing of track are increased progressively. The important factors of paved track are stability and applicability. To be based on this subject, cement mortar pouring type paved track is developed. The paved track is a kind of concrete track using the prepacked concrete technique. The most important thing to design the paved track is to optimize the track structure and materials considering various conditions. Until now, the paved track is verified a various material and structure test. In this paper, it is introduce to the test construction at the urban subway main line. The test construction is completed at Dec. 2007. A major object and substance is a guarantee of construction progress on main line, track performance, construction technique for curved section, transition zone and winter season, recycling the used ballast and application of specific sleeper for sharp curved section.

  • PDF

시멘트 모르터 충진형 포장궤도의 3차원 유한요소해석 (3D FEA for the Cement Mortar Pouring type Paved Track)

  • 이일화;이진욱;이수형;이현석
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.836-841
    • /
    • 2004
  • Recently, the development of the paved track is required as a Low-maintenance of conventional line. The main reason is that the line capacity and bearing of track are increased progressively. The most important factor of paved track is stability and applicability. To be based on this subject, Cement Mortar Pouring(CMP) paved track is developed. CMP paved track is a kind of ballast reinforced track using the pre packed concrete technique. The most important to design is characteristics of the structure. CMP slab's thickness is less than the conventional slab track and pouring layer is attached tie and roadbed directly. On this paper, to verify the basic structure of the CMP track, characteristics of the structure is investigated pouring layer, tie and interaction of the each layer using the 3D finite elment analysis.

  • PDF

포장궤도 모르터 충진성능 확보를 위한 토목섬유의 적용 (Application of Geotextile to ensure the Motor Pouring Ability for Paved Track)

  • 이호룡;박종관;황선근;이일화
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 추계학술대회 논문집
    • /
    • pp.836-841
    • /
    • 2005
  • As gravel roadbed is gradually turn down by repetitive loading of train, lasting work for maintenance and management of track is necessary to reduce the settlement of roadbed and the deterioration of track. Despite of above weak point, gravel roadbed has become a basic structure of roadbed at the present time. But request for new structure of roadbed is recently presented to settle an increased transportation capacity of track, and to solve a shortage of the labor to handle maintenance work of track. Therefore, we begin to research about maintenance-free roadbed like paved track from two years ago. In this study, a series of tests were performed to clarify the characteristics of strength and permeability of concrete specimen, which is the upper part of paved track injected by cement mortar, by type of geotextile and finally to give a basic data for application of geotextile to the lower part of paved track.

  • PDF

포장궤도 구조결정을 위한 현장상태 조사 (The Investigation of the In-Situ state to Determine the paved Track Structure)

  • 이일화;황선근;박태순;이보형;고학송
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 춘계학술대회 논문집
    • /
    • pp.974-979
    • /
    • 2004
  • Recently, the development of paved track is required as a Low-maintenance of conventional line. The most important factor of paved track is stability and applicability. In this method, the ballast is grouted with mortar so that the ballast can turn into a structure like slab. This method can be subdivided into the followings. One is the method with switching the ballast, and the other is without switching the ballast. The ordinary and actual states of the ballast and roadbed were investigated to evaluate the applicability of the paved track structure in this study, and various In-situ tests were applied. Non-destructive tests such as GPR, SASW, FWD were used, and bearing capacity of roadbed, depth of the ballast, and deterioration, penetration, and contamination of the ballast were focused. The result of this investigation was utilized in the selection of optimal paved track structure and data for preliminary design.

  • PDF

저탄성 베이스플레이트 패드 적용에 따른 포장궤도 노반에서의 전달하중 저감에 관한 연구 (A Study on Transferred Load Reduction on Paved Track Roadbed with Low Elastic Base Plate Pad)

  • 이일화;강윤석;이희업
    • 대한토목학회논문집
    • /
    • 제28권3D호
    • /
    • pp.399-405
    • /
    • 2008
  • 포장궤도는 기존선의 유지보수 노력을 절감하기 위하여 개발되고 있다. 이 중 베이스플레이트 저탄성패드는 궤도 전체의 지지강성을 결정하는 구성품으로서 궤도의 응력-변위특성, 동적응답, 피로특성 등에 가장 큰 영향을 미친다. 따라서 저탄성패드의 적용은 궤도전체의 내구성과 안정성에 미치는 영향이 크다고 할 수 있다. 본 논문에서는 저탄성패드의 적용으로 인하여 획득되는 효과 중 노반에 전달되는 열차하중의 저감에 대한 연구를 수행하였다. 이를 위하여 패드스프링계수별 정적해석과 실물반복재하시험을 수행하고 그 결과를 비교 분석하여 저탄성패드의 하중 전달특성을 파악하였으며 전달하중 저감효과를 검토하였다.

궤도가속실험을 통한 포장궤도 토공구간 시공이음매부의 변형특성 연구 (Deformation Characteristics of Construction Joint of Paved Track on Earthwork Section using the Accelerated Track Test)

  • 이일화;장승엽;강윤석;엄주환;김은
    • 한국철도학회논문집
    • /
    • 제13권5호
    • /
    • pp.521-527
    • /
    • 2010
  • 포장궤도는 토공구간, 교량구간, 터널구간, 분기기구간 등 모든 구간에서 유지보수를 절감할 목적으로 적용한다. 토공구간에 포장궤도를 적용할 경우, 내구성에 가장 큰 영향을 미치는 것은 시공이음매부로서 구조적인 문제는 없으나 슬래브의 불연속으로 인한 단차가 발생하여 장기적인 사용성에 영향을 미칠 가능성이 있다. 따라서 이에 대한 검토를 위하여 실물의 포장궤도를 제작하여 시공이음매부와 연속부에서 가속실험을 실시하였다. 가속실험에서는 각 재하하중별 변위와 토압에 대한 경향을 비교함으로써 시공이음매부에서의 취약도를 평가하고자 하였다.

시멘트모르터 충진형 포장궤도의 실물 반복재하특성에 관한 연구 (Study on the Full-Scale Cyclic Loading Characteristics for Cement Mortar Pouring type Paved Track)

  • 이일화;장승엽;김은
    • 한국철도학회논문집
    • /
    • 제9권3호
    • /
    • pp.305-312
    • /
    • 2006
  • Gravel ballasted tracks are used as a basic structure for the domestic railway tracks. However, such kind of tracks has few disadvantages with service life of the structure, such as rapid deterioration of the tracks. Due to this reason, there is a need to develop low maintenance track to improve the service life of the conventional line tracks. CMP paved tacks are one of the kind of concrete tracks those were manufactured by using the prepacked concrete techniques. The purpose to develop paved tracks is to reduce the maintenance cost. The most important controlling factors to design the paved tracks are surrounding environmental condition and repeated train loading. In this study, in order to investigate the deformation characteristics such as displacement, earth pressure, strain ratio, and crack along the repeated loading cycle, cyclic loading test through real scale model was carried out.

포장궤도 골재용 도상자갈의 건식 블라스팅 효율 향상 연구 (Improvement of Dry-blasting Efficiency for Ballast used as Aggregate of Paved Track)

  • 이일화
    • 한국철도학회논문집
    • /
    • 제13권1호
    • /
    • pp.78-83
    • /
    • 2010
  • 포장궤도에서는 프리팩 콘크리트방식으로 도싱자갈을 충전층의 골재로 활용한다. 골재의 가장 중요한 조건은 모르터와의 부착력이며 이를 위하여 표면의 불순물을 최대한 제거하여야 한다. 국내에서 개발한 포장궤도 공법에서는 기존의 수세척방식을 대체하는 친환경 건식세척기술을 개발하였다. 건식세척은 직경 0.3~0.5mm 내외로 파쇄한 경질 재료를 고압으로 분사시켜 골재 표면을 박피시키는 방식이다. 본 논문에서는 블라스팅기술의 세척 효율을 향상시키기 위한 방안으로 현재 운용중인 장비조건하에서 분사 재료 및 시간 별 골재 잔입자 함량, 염화물 함유량, LA마모율, 압축강도시험 등을 실시하여 가장 효율적인 세척 재료 및 공정을 제시하고자 하였다.