Asphalt overlay resurfacing techniques have been widely utilized in maintaining asphalt concrete in Korea, causing severe traffic congestions while being in construction and difference in level due to the repeated overlay. Besides on these technical difficulties, there have been financial disadvantages associated with technique, mainly because overlay method has been executed for pavements with intact foundations, which is contrary to the norm. This study is aiming to increase the expected life length of the asphalt pavement up to the endurance period, to raise the efficiency of the pavement by maximizing the social benefit and to enhance public character of the street through combining ceramics with epoxy resins, which has advantages in compatibility with the existing pavement materials, durability to abrasion and endurance. It has been expected that the adoption of new method and pavement materials to the actual work sites will develop the performance of the pavements, and to lengthen the durability of the existing materials. The other advantages of the 'thin surfacing' method could be the improved adhesiveness, waterproof, corrosion-proof and bending strength.
PURPOSES : Concrete pavement has been used in the construction of the Jungbu expressway in 1987. More than 60% of the pavement on the expressway is currently made of concrete, but most has been used far beyond their design life. Pavement life has been extended through routine maintenance or overlay. However, the structural capacity of the pavement has reached its limit, and extensive rehabilitation/reconstruction with long time traffic blocking should be considered. The three following issues on concrete rehabilitation/reconstruction will be discussed: (1) economic comparison of asphalt inlay and asphalt overlay, (2) economic comparison preventive overlay on a section which is currently good and routine overlay on the section which will be poor, and (3) economic analysis of early-strength concrete when it is used in concrete reconstruction. METHODS : First, various life cycle cost analysis tools were compared, and the proper tool for the extensive rehabilitation/reconstruction was selected. Second, a sensitivity analysis of the selected tool was performed to find the influential input variables, which should be carefully selected in the analysis. Third, three case studies, which can be issues in the rehabilitation/reconstruction of the expressway concrete pavement in Korea, were performed. RESULTS : Asphalt overlay without milling the deteriorated concrete showed 18~25% lower life cycle cost than the current asphalt inlay with milling. The good current preventive overlay on the section was economically justified within the scope of this study. The construction cost limit of the early strength concrete was suggested to be economical for 1, 3, and 7 days of construction alternative opening. CONCLUSIONS : CA4PRS was a viable tool for comparing various rehabilitation/reconstruction issue alternatives. Several concrete issues associated with the rehabilitation/reconstruction of the deteriorated concrete pavement were discussed as mentioned above.
Proceedings of the Korea Concrete Institute Conference
/
1999.04a
/
pp.493-498
/
1999
Many concrete pavements closed to the end of service life in out country need to repair. We investigated material and mix designs for thin bonded concrete overlay and applied it to concrete pavement rehabilitation. The concrete with Type III cement showed earlier strength and better durability than the concrete with Type I cement. Designed concrete mixture with TypeIII cement made it possible to open the road earlier against heavy vehicles, increased traffic despite of cold weather in winter. In the field examination after four month, there was no defects like as shrinkage crack, spalling, surface abrasion and scaling, and good traffic condition has been maintained.
Park, Je-Seon;Lee, Joo-Hyung;Kim, Tea-Kyung;Yun, Kyung-Ku
Journal of Industrial Technology
/
v.18
/
pp.363-370
/
1998
This study focused on the development of an alternative stress estimation procedure to instantly calculate the critical stresses bonded concrete pavement. Closed form analysis is commonly used to analyze pavement structures. This type of analysis assumes linearelastic material properties and static loading conditions. The well-known ILLI-SLAB finite element program was used for the analysis. Bonded concrete overlay analyzed the stress distribution, behavior and load carrying capacity under track load is made evaluation standard of bonded concrete overlay. In the study, the following results were derived ; The properties of strength is that compress and 3-point bending strength of existing pavement is deteriorated with $184kg/cm^2$, $59kg/cm^2$ but compress and splitting tensile strength of overlay is satisfied with $465kg/cm^2$, $45kg/cm^2$. Load transfers is happen at adjacent slab by interlocking under track load. The stress distribution under interior, corner and edge load is described high loading position surrounding then loading position.
Asphalt concrete overlay method is used by general maintenance and rehabilitation of construction for aged concrete pavement in Korea. However, in case of the AC overlay method to extend service life of the existing concrete pavements, various distresses of reflection crack, pothole and rutting are the typical problems of the asphalt overlay on existing concrete pavement since it has different physical characteristics between asphalt overlay and existing concrete pavement. To achieve this, application of concrete overlay method is required instead of AC overlay method. Concrete overlay method has advantages that can reduce maintenance cycle and costs since it has excellent bearing value for heavy vehicles and no rutting. However, technical problems of detour road construction, traffic control and other disadvantages happened by long curing time. Thus, in this study and experimental research were launched to evaluate the workability, durability and resistance against environmental loading of Very Rapid Hardening Acrylic Polymer Modified Concrete(VRH-APMC) for application of bonded concrete overlay method. Test results showed that the compressive and bond strength were exceed 21MPa and 1.4MPa of target strength after four hours for rapid traffic opening properties. And tests of resistance against environmental loading results showed that VRH-APMC secured excellent durability. Thus, it was known that VRH-APMC was suitable material for large scale bonded concrete overlay method, and it was possible to use maintenance and rehabilitation method which needs enough workability and rapid traffic opening.
Since in 1970, the length of concrete pavements(JCP, JRCP and CRCP) are growing rapidly at both of main highways and local roads. Many of them are deteriorated and old enough to be repaired or replaced. The pavement is more important than the other infrastructures and it is very difficult to go around or block the traffic during the rehabilitation. The very-early strength latex-modified concrete(VES-LMC)may offer the advantages of high-early-strength, higher flexural strength, higher bond strength, and improved durability. The VES-LMC could be used at a kind of fast track ofr early opening to the traffic after 3 hours of concrete placement. The installation of VES-LMC overlay at Jung-Boo highway was successfully done from April 28 to 29, 2005. The traffic was closed at 07:00 PM and opened to traffic at 08:30 AM. The compressive and flexural strength of VES-MC were more than 28MPa, 6.2MPa after 4 hours, respectively.
Proceedings of the Korean Geotechical Society Conference
/
2005.10a
/
pp.405-416
/
2005
The rubblization technique is breaking the aged concrete pavement slab into rubblized concrete aggregate, and use it as an base material at its original position, then builds overlay above the rubblized base. This method has been successively used in USA due to the advantage of good contructibility, cost-effectiveness as well as the capability of preventing of reflection cracks. However, constructibility and economic performance of rubblization on typical Korean concrete pavements needed to be investigate since to typical Korean concrete pavements have thick slab, as well include lean concrete subbase course. This stud explored optimum breaking depth and suggested minimum 10cm based on reflection crack simulation test. Also proper head shape and impact energy were investigated based on small breaking field tests. It was found that $127kg/cm^2$ of stress with 52.3% of head contact area are breaking requirement. Also, Multi-head type breaker suitable for Korean condition was designed and developed. This multi-head type breaker was designed to rubblize old concrete to the suggested optimum rubblized-depth and rubblized-concrete-aggregate size to prevent reflection crack and maintain high bearing capacity. This machine was used for the test of rubblization of old concrete pavement on a non-use old concrete and a in-serviced road. In these two tests, engineering properties of rubblized base and constructability and cost were investigated. In both tests, the old concrete rubblized to targeted size and depth, and high-level bearing capacity was achieved. Also, superior constructability and lower cost compared with traditional reconstruction was examined.
Lee, Ju Myeong;Baek, Seung Beom;Lee, Kang Hoon;Kim, Jo Soon;Jeong, Jin Hoon
International Journal of Highway Engineering
/
v.19
no.3
/
pp.31-43
/
2017
PURPOSES : The objective of this study is to verify the effect of fiber grid reinforcement on the long-term performance of asphalt pavement overlaid on old concrete pavement by performing field investigation, laboratory test, and finite element analysis. METHODS : The reflection cracking, roughness, and rutting of fiber grid reinforced overlay sections and ordinary overlay sections were compared. Cores were obtained from both the fiber grid reinforced and ordinary sections to measure bonding shear strength between the asphalt intermediate and asphalt overlay layers. Fracture energy, displacement after yield, shear stiffnesses of the cores were also obtained by analyzing the test results. Finite element analysis was performed using the test results to validate the effect of the fiber grid reinforcement on long-term performance of asphalt pavement overlaid on the old concrete pavement. The fatigue cracking and reflection-cracking were predicted for three cases: 1) fiber grid was not used; 2) glass fiber grid was used; 3) carbon fiber grid was used. RESULTS : The reflection-cracking ratio of fiber grid reinforced sections was much smaller than that of ordinary sections. The fiber grid reinforcement also showed reduction effect on rutting while that on roughness was not clear. The reflection-cracking was not affected by traffic volume but by slab deformation and joint movement caused by temperature variation. The bonding shear strength of the fiber grid reinforced sections was larger than that of the ordinary sections. The fracture energy, displacement after yield, and shear stiffnesses of the cores of the fiber grid reinforced sections were also larger than those of the ordinary sections. Finite element analysis results showed that fatigue cracking of glass or carbon fiber grid reinforced pavement was much smaller than that of ordinary pavement. Carbon fiber grid reinforcement showed larger effect in elongating the fatigue life of the ordinary overlay pavement compared to glass fiber grid reinforcement. The binder type of the overlay layer also affected the fatigue life. The fiber grid reinforcement resisted reflection-cracking and the carbon fiber grid showed the greater effect. CONCLUSIONS :The results of field investigation, laboratory test, and finite element analysis showed that the fiber grid reinforcement had a better effect on improving long-term performance of asphalt pavement overlaid on the old concrete pavement.
Proceedings of the Korea Concrete Institute Conference
/
2002.05a
/
pp.607-612
/
2002
In road pavements, it is known that cement concrete pavement has superior durability, safety compared. But in repairing pavement, cement concrete pavement is not usually applied because of the length of time while the road is interrupted when using Ordinary and Rapid-hardening Portland Cement. And Super High Early Strength Cement and Ultra Super High Early Strength Cement are not favorable for ready mixed concrete because of rapid setting time, high slump loss and other restrictions. We developed special cement developing 1 day strength of over 30.0N/mm$^2$ to open the road within 1 day and workable time is maintained over 1 hour so that it can be used as ready mixed concrete. We performed experimental overlay construction with the cement and evaluated the mechanical property and the durability. At curing temperature of 8-l8$^{\circ}C$,the flexural strength was 6.4N/mm$^2$at 1 day, so that the road can be open to traffic within 1 day. In durability test, the hardened concrete showed higher durability than Portland cement concrete.
KSCE Journal of Civil and Environmental Engineering Research
/
v.33
no.3
/
pp.1153-1163
/
2013
Bonded concrete overlay is a favorable maintenance method since the material properties are similar to existing concrete pavements. In addition, bonded concrete overlay has advantage of structural performance based on being bonded together, both for the overlay layer and the existing pavement which perform as one monolithic layer. Therefore, it is important to have a suitable bond strength criteria for long term performance of bonded concrete overlay. This study aimed to investigate the affecting of bond strength on various bond characteristics, and to compare the bond strength between direct tensile test and indirect tensile test due to various conditions such as overlay materials, compressive and flexure strength of existing pavement, and deterioration status of existing pavement. As a result of this study, bond strength occurred by both of direct and indirect tensile test due to monotonic load is highly correlated such as coefficient of determination of 0.75 and P-value of 0.002. However, bond strength by indirect tensile test was relatively higher than bond strength by direct tensile test. It was known that correlation between direct and indirect tensile test was possible to use the characteristics analysis of bond fatigue behavior based on bond strength due to cyclic load which can simulate real field behavior of bonded concrete overlay.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.