JSTS:Journal of Semiconductor Technology and Science
/
v.15
no.4
/
pp.437-444
/
2015
A high output power voltage controlled oscillator (VCO) in the U-band was implemented using a 65 nm CMOS process. The proposed VCO used a transmission line to increase output voltage swing and overcome the limitations of CMOS technologies. Two varactor banks were used for fine tuning with a 5% frequency tuning range. The proposed VCO showed small variation in output voltage and operated at 51.55-54.18 GHz. The measured phase noises were -51.53 dBc/Hz, -91.84 dBc/Hz, and -101.07 dBc/Hz at offset frequencies of 10 kHz, 1 MHz, and 10 MHz, respectively, with stable output power. The chip area, including the output buffer, is $0.16{\times}0.16mm^2$ and the maximum output power was -0.11 dBm. The power consumption was 33.4 mW with a supply voltage of 1.2-V. The measured $FOM_P$ was -190.8 dBc/Hz.
Solar energy is one of the renewable energy sources. It can respond to expanding energy demand. A solar cell module is designed to have a durability that can be developed over a long period of 25 years to be installed outdoors and perform like a stable power supply. We need Standard Test Condition (STC)-based power output data before and after testing to measure the power output of existing modules. The modules are shown to reduce power output by comparing data before and after outdoor experiments regardless of whether they are indoor or outdoor. It is easy to compare the power output quantities through the module simulator in the indoor. However, it takes a lot of testing time and costs to compare the power output on outdoor in the case of a high number of modules and distance from the module simulator. It can save time and costs if we can check the power output using the data in outdoor. We have used the long-term outdoor test to find the elements out that corresponds to the reductions in power output quantities. We have conducted research that matched the actual and the tests.
Transactions of the Korean Society of Mechanical Engineers
/
v.11
no.6
/
pp.971-974
/
1987
Considering heat transfer and heat loss processes for the heat engine operating between two fixed heat reservoirs, it may be qualitatively explained that the maxima of power output and its efficiency depending upon operating conditions are extreme maxima. Furthermore, it is also found that from an economic point of view the above two extremes are related to extreme minima of plant cost per unit power output and operation cost per unit power output respectively, and the condition of minimum cost per unit power output exists between the extreme minimum conditions of plant cost per unit power output and that of operation cost per unit power output.
High accuracy and stability digital controlled power supply for magnet is developed at PLS. This power supply has three sections. The first section is digital controller including DSP&FPGA and precision ADC, the second section consists of IGBT driver and four quad IGBT switch, and the third section is LC output filter section. AC input voltage of power supply is 3-phase 21V, output current is 0 ${\sim}$ 150 A dc. Switching frequency of four quad IGBT switch is 25 kHz. The output current of power supply has very high accuracy of 100 A step resolution at full range and the stability of +/- 1.5 ppm for short term and +/- 5 ppm for long term. This paper describes characteristics of filter and output current performance improvement after LC output filter at four quad digital power supplies.
The neutral beam injection generate ultra-high temperature energy in the tokamak of nuclear fusion. The neutral beam injection make up arc power supply, filament power supply and acceleration & deceleration power supply. The arc power supply has characteristics of low voltage and high current. Arc power supply generate arc through constant output of voltage and current. So this paper proposed suitable buck converter for low voltage and high current. The proposed buck converter used parallel switch because it can be increased capacity and decrease conduction loss. When an arc generated, the neutral beam injection chamber occur high voltage. And it will break output capacitor of buck converter. Therefore the output capacitor was removed in the proposed converter. Thus the proposed converter should be designed for the characteristics of low voltage and high current. Also, the arc power supply should be guaranteed for system stability. The proposed parallel buck converter enables the system stability of the divided low output voltage and high current. The proposed converter with constant output be the most important design of the output inductor. In this paper, designed arc power supply verified operation of system and stability through simulation and prototype. After it is applied to the 288[kW] arc power supply for neutral beam injection.
The Transactions of the Korean Institute of Electrical Engineers B
/
v.53
no.1
/
pp.47-54
/
2004
A new high voltage DC power supply is proposed. The proposed power supply is constructed with several power converters connected in series. It is easy to obtain high DC voltage for the same structure of each power converter. The output DC power of the proposed power supply can be disconnected from the load within several hundred microseconds at the instant of a load short-circuit fault. The rising time of the output DC voltage is also as small as several hundred microseconds, and there is no overshoot of the voltage because all of the output filter capacitors keep undischarged state even in load short-circuit condition. Therefore, the proposed scheme is suitable for the protection of frequent output short-circuit and fast on/off switching of output DC voltage. The proposed power supply has improved features such as simple structure, high power factor, and reduced size and volume compared with the conventional schemes. The operating principle is described and the validity of the proposed scheme is proved through simulations and experiments.
We carried out the power performance evaluation for 1.5 MW${\times}$2 by using anemometer installed on WTGS(Wind Turbine Generator System) in the wind farm at Shi-hwa bang-a-mu-ri. In this paper, we compared and analyzed the performance of guaranteed output and measured output of WTGS which includes output curve, output coefficient, AEP(Annual Energy Product) and availability, etc.. The power performance of WTGS was optimized in the low wind speed sections(3 m/s ~ 10 m/s) and the measured output was more produced by AEP 109 % and availability 112 % than the guaranteed output. In addition, we could also cut the high cost of testing WTGS performance by using anemometer as a substitute for weather mast.
Proceedings of the Korean Institute of Information and Commucation Sciences Conference
/
2016.10a
/
pp.85-88
/
2016
Two output ports of $90^{\circ}$ hybrid-coupler are generally the same output power with $90^{\circ}$ phase difference. But, Two output ports of $90^{\circ}$ hybrid-coupler must be the different output slope characteristic about frequency because of the different electrical length. In $90^{\circ}$ hybrid-coupler being the same power distribution, 3-dB power distribution at two output ports only exists near the center frequency. And, the output power difference between two output ports increases in accordance with the further away from the center frequency. This paper proposes $90^{\circ}$ hybrid-coupler being the similar output slope characteristic of two output ports in wideband to modify the ${\lambda}/4$ transmission line of $35-{\Omega}$ characteristic impedance between input port and output port near input port. The power difference between two output ports of the proposed circuit is below 0.2dB over 20% bandwidth of the center frequency in ADS(advanced Design System).
Korean Journal of Air-Conditioning and Refrigeration Engineering
/
v.21
no.8
/
pp.462-467
/
2009
Researches and developments on BEMS are performed world-widely through sustainable management in various conditions. However, there are many obstacles to adapt the system in existing buildings because it needs highly expensive equipments, which are designed for newly built buildings, to install. Therefore, there are numerous limits exist when applying the BEMS in established buildings. The purpose of this study estimates the optimization of RF output power in WSN(Wireless Sensor Networks), which is the essential technology to develop PEMS. The results of this study is as follows ; 1) Applying WSN technique in buildings was possible. 2) As RF output power increases, the number of relay node reduced, therefore, the WSN showed more stability. 3) When estimating optimal RF output power in school, it should be considered between the number of relay node and RF output power. 4) Considering battery consumption and possibility of reception, the best suited RF output power is -20dbm in apartment house.
Even if an expert who has majored energy engineering, it is a difficult concept to understand power output optimization and power efficiency optimization. In this study a diagram applying thermodynamic state value as specific exergy and exergy ratio was developed. Although general peoples who did not major energy engineering can be easily understand the concept of power output optimization and power efficiency through the developed diagram. A represented property that can identify the performance of power plant is the main steam temperature and pressure. At the developed diagram the maximum power output line and maximum power efficiency line are shown according to the temperature and pressure of main steam. Therefore we can identify how much a power plant approach to maximum power output and maximum power efficiency.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.