• Title/Summary/Keyword: order completion time

Search Result 183, Processing Time 0.034 seconds

An open Scheduling Framework for QoS resource management in the Internet of Things

  • Jing, Weipeng;Miao, Qiucheng;Chen, Guangsheng
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.12 no.9
    • /
    • pp.4103-4121
    • /
    • 2018
  • Quality of Service (QoS) awareness is recognized as a key point for the success of Internet of Things (IOT).Realizing the full potential of the Internet of Things requires, a real-time task scheduling algorithm must be designed to meet the QoS need. In order to schedule tasks with diverse QoS requirements in cloud environment efficiently, we propose a task scheduling strategy based on dynamic priority and load balancing (DPLB) in this paper. The dynamic priority consisted of task value density and the urgency of the task execution, the priority is increased over time to insure that each task can be implemented in time. The scheduling decision variable is composed of time attractiveness considered earliest completion time (ECT) and load brightness considered load status information which by obtain from each virtual machine by topic-based publish/subscribe mechanism. Then sorting tasks by priority and first schedule the task with highest priority to the virtual machine in feasible VMs group which satisfy the QoS requirements of task with maximal. Finally, after this patch tasks are scheduled over, the task migration manager will start work to reduce the load balancing degree.The experimental results show that, compared with the Min-Min, Max-Min, WRR, GAs, and HBB-LB algorithm, the DPLB is more effective, it reduces the Makespan, balances the load of VMs, augments the success completed ratio of tasks before deadline and raises the profit of cloud service per second.

Buffer Sizing Method of CCPM Technique Using Statistical Analysis (통계분석을 이용한 CCPM 기법에서의 버퍼 산정방법)

  • Liu, Jing-Chao;WhangBo, Taeg-Keun
    • The Journal of the Korea Contents Association
    • /
    • v.12 no.8
    • /
    • pp.29-36
    • /
    • 2012
  • In CCPM Technique, as the buffer size calculation method, the Cut and Paste(C&P) method and the Root Square Error (RSE) method for all tasks carried out the same treatment, without considering the actual situation and characteristics of the task, the lack of reasonable judgment, is too simple and hasty. In this paper, taking into account the limitations of existing methods, a new method of buffer sizing method based on statistical analysis was introduced. It makes statistical analysis for the relationship between each worker and a variety of tasks, and use the information to predict the next task time. In order to verify the effectiveness of the new method, according to different task difficulty and the number of tasks set up the project. Use C&P, RSE method and new methods to predict the time of the project. Through Monte Carlo Simulation to simulate the project time, a comparison of three methods of performance. The results show that the new method can achieve the managers expect the probability of completion, and for those tasks can be completed ahead of schedule, the new method can save project time.

Development of a Forest Fire Tracking and GIS Mapping Base on Live Streaming (실시간 영상 기반 산불 추적 및 매핑기법 개발)

  • Cho, In-Je;Kim, Gyou-Beom;Park, Beom-Sun
    • Journal of Convergence for Information Technology
    • /
    • v.10 no.10
    • /
    • pp.123-127
    • /
    • 2020
  • In order to obtain the overall fire line information of medium and large forest fires at night, the ground control system was developed to determine whether forest fires occurred through real-time video clips and to calculate the location of the forest fires determined using the location of drones, angle information of video cameras, and altitude information on the map to reduce the time required for regular video matches obtained after the completion of the mission. To verify the reliability of the developed function, the error distance of the aiming position information of the flight altitude star and the image camera was measured, and the location information within the reliable range was displayed on the map. As the function developed in this paper allows real-time identification of multiple locations of forest fires, it is expected that overall fire line information for the establishment of forest fire extinguishing measures will be obtained more quickly.

RELATIONSHIP BETWEEN THE DEVELOPMENTAL STAGE AND CHRONOLOGICAL AGE, AND THE CHANGES OF TOOTH POSITION IN RELATION TO THE TOOTH DEVELOPMENT ON MANDIBULAR PERMANENT TEETH (하악 영구치아의 발육과 연령과의 관계 및 치아 발육에 따른 치아의 위치 변화)

  • Kim, Hyun-Mi;Yang, Seung-Duck;Kim, Hyun-Jung;Kim, Young-Jin;Nam, Soon-Hyeun
    • Journal of the korean academy of Pediatric Dentistry
    • /
    • v.29 no.4
    • /
    • pp.607-617
    • /
    • 2002
  • The purposes of this study were to evaluate the timing of tooth calcification and the change of tooth position with tooth developmental stage on the mandibular teeth. Seven hundred seventy two children(male:446, female:326), 3 to 12 years of age were examined radiographically with panoramic film. Dental development was determined by inspecting radiographs and assigning a rating according to consecutive stages defined by Moorrees, and tooth cusp position and root terminus position were measured from the lower border of mandibular body and calculated the position index to evaluate the movement of tooth with developmental stage. The results were as follows. 1. There were no significant differences between boys and girls in the timing of calcification until crown completion, but timing of calcification tend to be faster in girls than in boys after root initiation stage. 2. In terms of mean age, crown completion of central incisor in boys and girls occurred at the age of 3.71, 4.05 years, at 4.44, 4.60 years for the lateral incisor, at 5.35, 5.11 years for the canine, at 6.62, 6.36 years for the first premolar, at 7.36, 7.17 years of second premolar, at 3.51, 3.69 years of first molar, and at 7.90, 7.64 years for the second molar respectively. Apex 1/2 closed stage of central incisor occurred at the age of 8.70 in boys, 8.18 in girls, at 9.55, 8.99 years for the lateral incisor, at 12.48, 11.60 years for the canine, at 12.30, 12.01 years for the first premolar, at 12.19, 12.26 years of second premolar, at 9.12, 8.87 years of first molar, and at 12.59, 12.45 years for the second molar respectively. 3. There was no noticeable movement of cusp tip until crown completion (Crc), but showed rapid movement toward occlusion plane after root initiation(Ri) and again maintain stable position after root completion stage(Rc). 4. Root terminus position was stable until root 1/4 formation stage(R1/4), followed by rapid movement toward occlusal plane and was stable again after root 3/4 formation stage(R3/4). 5. Developmental stage at the time of alveolar bone penetration by cusp tip varied with each of the permanent teeth. 6. Canine tooth follicle was at the lowest position in the mandibular body during the early stage of calcification, followed by second premolar, first premolar, lateral incisor, second molar, first molar and central incisor in order.

  • PDF

Exploring the Effect of Mental Demand in Web Searches: A Pilot Study

  • Na, Kyoungsik
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.48 no.2
    • /
    • pp.379-398
    • /
    • 2014
  • This pilot study explored the effect of mental demand on a Web searcher's thoughts, emotions, efforts, and performance in Web searches in order to address whether or not there is any difference between searchers exposed to mental demand manipulation and searchers not exposed. Research data were collected via think-aloud protocol (TAP) with a dual-task in experiments and interviews with 10 subjects who participated in this study. For the searcher's thoughts, relevance judgment was found to be hindered by mental demand. For the searcher's emotions, the experimental group was more frustrated than the control group. With respect to the searcher's efforts, searchers for the experimental group with mental demand manipulation were more likely to spend more time, make fewer queries, and visit fewer pages but work harder to find more relevant information that they needed. Lastly, with regard to the searcher's performance, it is likely that performance was highly dependent upon the completion of the search tasks for both groups. The NASA-TLX six components and cognitive load scores of searchers did not make a significant difference in the outcome. The findings support the use of a dual-task methodology as a promising approach for the assessment of cognitive load induced by complex Web searches.

Implementation of Facility Maintenance Management System using Smart Phones (스마트 폰을 이용한 시설물 유지관리 시스템 구현)

  • Joo, Young-Do
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.13 no.1
    • /
    • pp.191-197
    • /
    • 2013
  • Recently, the demand for mobile systems is remarkably growing due to the explosive spread of smart phones. The mobile system based on the smart phones enables the real time communication and business process by utilizing the on-line information on the spot anytime and anywhere. This paper proposes a development model to use android-based mobile applications to be applicable to the facility defect maintenance management in apartment buildings. The proposed methodology aims to implement an incorporated system to bind the web-based system and the mobile system in systematic interaction in order to feasibly realize the concept of mobile office.

An Experimental Study on Flame Propagation along Non-premixed Vortex Tube (비예혼합 선형 와환에서의 화염 전파 특성에 관한 실험적 연구)

  • Yang, Seung-Yeon;Roh, Yoon-Jong;Chung, Suk-Ho
    • Proceedings of the KSME Conference
    • /
    • 2001.06d
    • /
    • pp.864-870
    • /
    • 2001
  • Flame propagation along vortex tube was experimentally investigated. The vortex tube was generated by the ejection of propane from a nozzle through a single stroke motion of a speaker and the ignition was induced from a single pulse laser. Non-reactive flow fields were visualized using shadow technique. From these images, vortex ring size and translational velocity were measured in order to determine the ignition time and position. Flame structure and flame speed were measured using high speed CCD camera. Flame speed was accelerated during the initial stage of flame kernel growth, and reached near constant value during steady propagation period. Near the completion of propagation, flame speed was decelerated and then extinguished. Flame speed along the non-premixed vortex tube was found to be linearly proportional to circulation, which was similar to that of the flame propagation along premixed vortex ring. Ignition position minimally affects the propagation characteristics. These imply that flame is propagating along the maximum speed locus expected to be along stoichiometric contour and also support the existence of tribrachial flames.

  • PDF

Characterization of the Spiral Type Fault Current Limiters Using High-$T_c$ Superconducting Thin Films (나선형태로 제작된 고온초전도 한류기의 특성해석)

  • 정동철;박성진;강형곤;최효상;곽민환;임해용;황종선;최명호;추철원
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.14 no.6
    • /
    • pp.518-524
    • /
    • 2001
  • We report the current limiting properties of superconducting fault current limiters (SFCL). Our SFCL was patterned in a spiral type on a YB $a_2$C $u_3$$O_{7-x}$(YBCO) film deposited using rf sputtering techniques and was coated with a gold shunt layer in order to disperse the heat generated at hot spots in the YBCO film. Current increased up to 13.5 $A_{peak}$ at 60 Hz for the voltage of 13 $V_{peak}$, which is the minimum quench point, and increased up to 17.6 $A_{peak}$ at 60 Hz fo the voltage fo 141.4 $V_{peak}$. The quench completion time was 5 msec at 13 $V_{peak}$ and 4 msec at 141. $V_{peak}$ respectively. we think that this architecture using spiral-type SFCL can be useful for the protection of the power delivery systems from fault currents.s. currents.s.

  • PDF

A Study on the State of Claims and Disputes in Interior Design Projects - Focusing on Practices and Experiences of Interior Designers - (실내디자인 업무의 클레임 현황과 분쟁사례 분석에 관한 연구 - 실내건축가를 대상으로 한 실무사례를 중심으로 -)

  • Lee, So Young;Kim, Wook Seon
    • Korean Institute of Interior Design Journal
    • /
    • v.27 no.3
    • /
    • pp.116-125
    • /
    • 2018
  • With rapid economic development in Korea, interests in interior design have increased gradually. However, interior design markets were poorly evaluated from 2015 Korean Consumer Evaluation. It is necessary to identify what kinds of problems, defects, and consumer claims have arisen during interior design planning and construction procedures. Therefore the purpose of this study is to investigate claims and disputes in interior design project procedures and to find out when defects or claims take place in those procedures in order to reduce claims or defects. Email questionnaires were distributed to KOSID members (professional interior designers) using Google Survey. In addition, a focus group interview was conducted. A total of 54 responses were collected and analyzed using SPSS 19. As a result, in an agreement stage, alteration in materials is the major source of claim. More than a half of respondents addressed time shortage for programming and planning. During the construction stage, approximately 31% respondents experienced client dissatisfaction with materials and finishes. The reason for project completion delay was due to claims during construction. The claims most frequently appealed by clients were related to painting. The satisfaction with project quality is positively related to the quality and contents of design documents including design drawings and specifications. Regulations and communication with clients are important issues to reduce the gaps between interior designers and clients/ consumers.

Development of Evaluation Methodology on the Performance of BTL Sewer Rehabilitation Projects (하수관거정비 BTL사업의 효과분석 및 방안 수립 연구)

  • Song, Ho-Myeon;Cho, Jeong-Il;Ahn, Choong-Hee
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.24 no.6
    • /
    • pp.743-751
    • /
    • 2010
  • It requires an interim performance assessment for BTL business of the sewerage rehabilitation which continues from 2005 till now. Means, It is necessary to make an interim performance assessment and an analysis of an business effect of the sewerage rehabilitation BTL projects which still continues, and we presented an improvement method of the new sewerage rehabilitation project in future. This paper has conducted an analysis of the business effect for 3 local government BTL projects which are completed and under operation as of now in Jincheon-Gun, Cheongju-Si and Gangjin-Gun. As a method of business effect analysis, we conducted a business effect of the 3 places using the index set which we previously set for the business effect analysis. The index set in this research was sectionalized to an improvement effect of operating wastewater treatment plant, an benefit effect of the direct cost, an benefit effect of the indirect cost and an environment friendly effect. We, in this paper, conducted an business effect analysis for 3 sewerage rehabilitation BTL projects which are completed or under operation recently as a demonstration, however we judge that an business effect analysis shall be conducted in a stage that a significant time for operation has passed since the completion of the construction in order to induce an actual business effect of the sewerage rehabilitation BTL project.