• 제목/요약/키워드: optimal rehabilitation

검색결과 231건 처리시간 0.026초

fmGA를 이용한 하수관거정비 최적화 모델 (Optimization Model for Sewer Rehabilitation Using Fast Messy Genetic Algorithm)

  • 류재나;기범준;박규홍;이차돈
    • 상하수도학회지
    • /
    • 제18권2호
    • /
    • pp.145-154
    • /
    • 2004
  • A long-term sewer rehabilitation project consuming an enormous budget needs to be conducted systematically using an optimization skill. The optimal budgeting and ordering of priority for sewer rehabilitation projects are very important with respect to the effectiveness of investment. In this study, the sewer rehabilitation optimization model using fast-messy genetic algorithm is developed to suggest a schedule for optimal sewer rehabilitation in a subcatchment area by modifying the existing GOOSER$^{(R)}$ model having been developed using simple genetic algorithm. The sewer rehabilitation optimization model using fast-messy genetic algorithm can improve the speed converging to the optimal solution relative to GOOSER$^{(R)}$, suggesting that it is more advantageous to the sewer rehabilitation in a larger-scale subcatchment area than GOOSER.

최적 도시유출시스템의 개발 : II. 도시유역의 최적유출시스템 제어를 위한 의사결정모형의 개발 (Development of Optimal Urban Runoff System : II. Development of Decision Making Model for Optimal Control of Rainfal1-Runoff System in Urban Area)

  • 이정호;김중훈;김형수;조덕준;김응석
    • 한국수자원학회논문집
    • /
    • 제37권3호
    • /
    • pp.207-217
    • /
    • 2004
  • 국내의 경우 전국적으로 관거의 신설보다는 기존에 매설되어있는 관거의 노후에 따른 개량에 대한 관심이 증대되고 있으나, 그에 따른 연구는 미비한 실정이다. 국내ㆍ외에서는 유전자 알고리즘을 이용하여 개량시기를 결정하는 연구 예가 있으나, 이러한 연구에서 개량시기를 결정하는 요소들이 매우 단순하여 관거의 노후에 따른 복합적인 의사결정이 이루어지지 않고 있다. 본 연구에서는 관거별 통수능력 및 불명수 발생량을 산정하여 배수분구내 토구별 최적 개량 우선순위를 결정하는 한편, 유전자 알고리즘을 이용하여 최적개량비용을 산정하는 최적개량 의사결정 시스템을 개발하였다.

상수관로의 노후도 예측에 근거한 최적 개량 모형의 개발 (II) - 적용 및 분석 - (Development of Optimal Rehabilitation Model for Water Distribution System Based on Prediction of Pipe Deterioration (II) - Application and Analysis -)

  • 김응석;박무종;김중훈
    • 한국수자원학회논문집
    • /
    • 제36권1호
    • /
    • pp.61-74
    • /
    • 2003
  • 본 연구(II)는 연구(I)에서 제안한 상수관로의 노후도 예측에 근거한 최적 개량 모형을 A시를 대상으로 이를 적용하였다. 노후도 예측 모형은 굴착 및 실험이 필요한 14개 항목과 굴착 및 실험이 필요하지 않은 9개 항목을 구분하여 각각 관의 노후도 등급을 산정하였다. 노후도 예측 모형 적용 결과 항목개수에 따른 등급의 차는 l~2% 이내로 굴착 및 실험을 하지 않고도 노후도 예측이 가능한 것으로 나타났다. 최적 개량 모형은 노후도 항목별 최대 잔존수명과 제약조건 유무로 구분하여 적용하였다. 적용결과 항목별 최대 잔존수명의 증가에 따라 개량 시기 및 비용이 증가하였다. 또한 예산제약을 제외한 모형과 비교해서 예산제약을 고려한 모형이 모든 항목에서 비용이 증가되었다. 이는 예산제약을 고려할 경우 실제 주어진 최대 잔존수명 기간이내 매년 발생하는 예산의 최대 금액을 넘지 않은 대신에 매년 비슷한 비용으로 개량을 실시하기 때문인 것으로 판단되었다.

상수관로의 노후도 예측에 근거한 최적 개량 모형의 개발 (I) - 이론 및 모형개발 - (Development of Optimal Rehabilitation Model for Water Distribution System Based on Prediction of Pipe Deterioration (I) - Theory and Development of Model -)

  • 김응석
    • 한국수자원학회논문집
    • /
    • 제36권1호
    • /
    • pp.45-59
    • /
    • 2003
  • 본 연구에서는 상수관의 개량사업을 보다 효율적으로 실시 할 수 있는 방법으로 국내 실정에 적합한 상수관로의 노후도 조사방법을 이용하여 매설된 관의 노후도를 예측 근거한 최적 개량 모형을 제시하였다. 노후도 예측 모형은 확률론적 신경망 이론을 바탕으로 관별 노후도 정도를 5개 등급으로 구분하며 산정된 관별 노후도 등급 및 관경을 바탕으로 최대 잔존수명을 산정하였다. 최적 개량 모형은 관의 유지보수, 갱생, 교체의 시기 및 비용을 산정하는 것으로 최단경로흐름을 응용한 정수계획법을 이용하여 제시하였다. 또한 개발된 최적 개량 모형은 보다 현실적인 모형을 구축하기 위해 예산제약 유무에 따라 2가지 구분하여 모형을 제시하였다. 따라서, 본 연구에서 제안된 모형은 상수관로의 관리를 위해 보다 정량적인 방법으로 활용할 수 있을 것이다.

흡착식 소켓을 착용한 일측 대퇴절단환자의 소켓내부압력분포 (Socket Pressure Distribution of the Uni-Lateral Trans-Femoral Amputee with a Suction Socket)

  • 장윤희;김영호;양길태;임송학;문무성
    • 대한의용생체공학회:학술대회논문집
    • /
    • 대한의용생체공학회 1997년도 춘계학술대회
    • /
    • pp.249-252
    • /
    • 1997
  • A study on static and dynamic socket pressure distributions on a trans-femoral amputee with a suction socket was performed in order to assess an optimal socket fitting and function. Even for the amputee's static neutral position, pressure concentrations were observed in the lateral, medial, and posterior planes of the socket. During free walking, a significant movement of pressure concentration areas was observed. Large socket pressure was observed in the lateral, medial-anterior and posterior walls during mid-stance or push-off period. Socket pressure measurement will be one of the good tool to determine the optimal socket-limb interface.

  • PDF

효율적인 하수관거 개량을 위한 의사결정모형의 개발 (Development of a Decision Making Model for Efficient Rehabilitation of Sewer System)

  • 이정호;전환돈;주진걸;김중훈
    • 한국수자원학회논문집
    • /
    • 제41권2호
    • /
    • pp.127-135
    • /
    • 2008
  • 하수관거 개량사업의 주된 목적은 Inflow/Infiltration (I/I)를 제거 및 통수능력 확보이다. 최근 노후 하수관거의 개 보수 및 신설 사업이 활발히 이루어지고 있으나 현재의 사업들은 관거 데이터의 부족, 유량 및 수질 자료의 장기적인 측정 미비 등으로 인하여 효율적인 사업을 진행시키기에 무리가 있다. 본 연구에서는 하수관거 개량사업을 보다 효율적으로 진행시키기 위하여 Rehabilitation Weighting Model (RWM)과 Rehabilitation Priority Model (RPM)로 구성된 의사결정모형을 개발하였다. RWM은 시간 및 예산상의 제약으로 인하여 주요 지점에서만 관측되는 I/I를 상류의 각 관거별로 I/I를 산정하며, 관거별 I/I는 Analytic Hierarchy Process (AHP)를 통하여 산정된 8개 결함항목별 가중치에 따라서 결정된다. RPM은 Genetic Algorithm (GA)를 이용하여 소유역별 최적개량우선순위를 산정한다. 이것은 공사 기간 중 발생하는 I/I를 최소화시키기 위한 소유역별 공사 순서를 설정함으로써 하수처리장의 처리비용을 절감시킴으로써 하수관거 개량사업의 효율적인 시행을 위한 판단 기준을 제시해준다.

자동화 장비를 이용한 대형 상수관로 갱생을 위한 코팅재료 선정 및 방법에 관한 연구 (Investigating coating material and conditions for rehabilitation of water transmission pipe using a robotic system)

  • 김진원;김동현;이영건;이세완;김두일
    • 상하수도학회지
    • /
    • 제30권6호
    • /
    • pp.725-736
    • /
    • 2016
  • There is a growing concern on the improvement of water distribution pipeline for multi-regional water supply system in Korea along with its aging infrastructure. Rehabilitation of large diameter pipeline is more efficient in cost and time compared to replacement with trenching. The procedure for rehabilitation are diagnosis, cleaning, spraying coating material, and final inspection. The internal state of pipeline was carefully diagnosed and got C grade, which required rehabilitation. We found that 17,274,787,000 Korean won could be saved after pipe surface coating because of increased C coefficient of Hazen-Williams equation. Optimal coating material was D polyurea. We also found optimal distance between spraying nozzle and pipe wall to be 70 - 80 cm, which were critical factors for coating quality. This study also illustrated the time for spray drying to be more than 30 min. These results could be used in the quality control process during rehabilitation of aged pipelines.

Ubiquitous Sensor Network-based Rehabilitation Center

  • Jarochowski, Bart;Kim, Hyung-Jun;Ryu, Dae-Hyun;Shin, Seung-Joong
    • Journal of information and communication convergence engineering
    • /
    • 제5권1호
    • /
    • pp.73-77
    • /
    • 2007
  • This paper discusses the implementation of a rehabilitation center based on a ubiquitous sensor network. This paper discusses the implementation of a rehabilitation center based on a ubiquitous sensor network. We recognize that certain mild conditions requiring rehabilitation may be treated with minimal human supervision. In place of this constant human supervision, a variety of sensors are used to monitor the patient and rehabilitation progress. These sensors send data through a wireless Zigbee network to a server which stores the data and makes it available to a rehabilitation expert for analysis. This rehabilitation expert also issues rehabilitation prescriptions which are created based on the expert's determination of the patient's condition. By having the ability to control the rehabilitation equipment used, strictly enforce the assigned prescription, and constantly monitor the patient for any warning signs, the system ensures a safe and optimal rehabilitation session.

Athletic Shoulder I -Rehabilitation of the Injured Athletes-

  • 이용걸
    • 대한견주관절학회:학술대회논문집
    • /
    • 대한견주관절학회 2002년도 학술대회
    • /
    • pp.54-59
    • /
    • 2002
  • $\bullet$ Rehabilitation should be based on an understanding pathology and abnormal arthrokinematics and biomechanics. $\bullet$ Rehabilitation should be kept in mind to play a vital role in the successful outcome after shoulder injuries or surgeries. $\bullet$ Program should emphasize treating the cause and not just the symptoms. $\bullet$ Maintenance of the normal scapulohumeral and scapulothoracic rhythm and optimal strength should be re-established with rehabilitation. $\bullet$ Program modification and appropriate progression must be peformed on an individual basis.

  • PDF

농어업용 공공관정 기능진단 표준화(안)을 이용한 최적 사후관리 (Establishment of an Optimal Rehabilitation Process for Agricultural Public Wells by Applying Standardized Diagnostic Functions)

  • 이병선;송성호;박정근;원용천;김원석
    • 한국지하수토양환경학회지:지하수토양환경
    • /
    • 제21권4호
    • /
    • pp.1-9
    • /
    • 2016
  • Rehabilitation for low-yielding wells resulting in improvement on groundwater quantity and quality is considered to be the most economic and ecofriendly method against the increasing demand to groundwater due to frequent drought and the increase in numbers of agricultural complex for growing horticultural crops. This study suggests standard, stepwise diagnostic fuctions consisting of four steps (Basic inspection, Specific inspection, Rehabilitation, and Management) for an optimal management to the wells. Basic inspection can provide information on current groundwater quantity and quality compared with those on its initial stage. Specific-inspection based on hydrogeology can scientifically demonstrate causes of deterioration on groundwater quantity and quality. Results of specific inspection can suggest an optimal rehabilitation method to solve deteriorating problems including clogging and corrosion for the wells. After rehabiliating the wells, an assessment on groundwater quantity and quality would be conducted to identify the suitability of the applied method and improvement of the wells. A short-term, periodic management to the wells is considered as the key to save a public management budget. Suggested diagnostic functions can possibly induce sustainable supply of agricultural groundwater to the farm land and finally contribute the increase on rural household income.