This paper deals with optimal power allocation for channel estimation of orthogonal frequency-division multiplexing uplinks in time-varying channels. In the existing literature, the estimation of time-varying channel response in an uplink environment can be accomplished by estimating the corresponding channel parameters. Accordingly, the optimal power allocation studied in the literature has been in terms of minimizing the mean square error of the channel estimation. However, the final goal for channel estimation is to enable the application of coherent detection, which usually means high spectral efficiency. Therefore, it is more meaningful to optimize the power allocation in terms of capacity. In this paper, we investigate capacity with imperfect channel estimation. By exploiting the derived capacity expression, an optimal power allocation strategy is developed. With this developed power allocation strategy, improved performance can be observed, as demonstrated by the numerical results.
Journal of Korean Institute of Industrial Engineers
/
v.25
no.2
/
pp.274-281
/
1999
In this paper, we determine the required storage capacity of a unit-load automated storage/retrieval system(AS/RS) under random storage assignment(RAN) and n-class turnover-based storage assignment(CN) policies. For each of the storage policies, an analytic model to determine the optimal storage capacity of the AS/RS is formulated so that the total cost related to storage space and space shortage is minimized while satisfying a desired service level. A closed form of optimal solutions for the RAN policy is derived from the model. For the CN policy, an optimal storage capacity is shown to be determined by applying the existing iterative search algorithm developed for the full turnover-based storage(FULL) policy. Finally, an application of the approach to the standard economic-order-quantity inventory model is provided.
According to the increasing demands of supercomputer, an exclusive supercomputer building is requested to install a supercomputer for promoting high-end R&D as well as creating the public service infrastructure in the national level. KISTI, as a public supercomputer center with the 4th supercomputer (capacity of 360Tflops), is experiencing shortage of infrastructure systems, caused by increased capacity. Thus, it is anticipated that the situation will be growing serious when the 5th and 6th supercomputers will be installed. On this study, analyzed on the 5th supercomputer system through projecting performance level and optimal operating environments by assessing infra-capacity. Explored way to construct optimal operating environments through infrastructure-capacity analysis of supercomputer center. This study can be of use for reviewing KISTI's conditions as the only supercomputer center in Korea. In addition, it provides reference data for planning the new exclusive supercomputer center in terms of feasibility, while analyzing infrastructure systems.
Kim, Yang-Il;Kim, Kwang-Mo;Lee, Seung-Hyun;Chung, Koo-Hyung;Han, Seok-Man;Kim, Bal-Ho H.
Proceedings of the KIEE Conference
/
2005.11b
/
pp.186-188
/
2005
This paper presents a method of finding the optimal capacity of renewable energy in power system to prepare Kyoto-protocol. In order to determine the capacity of renewable energy, this paper finds a amount of CO2 emission and capacity of power reduction for each energy type. The proposed method performs economic dispatch including the existing facilities, renewable energy and Emission trading, and finds optimal capacity of renewable energy Power satisfying minimum total cost. Finally, the proposed idea is demonstrated with a case study.
Kim, J.K.;Lee, S.D.;Baek, B.S.;Lee, H.D.;Lee, J.Y.
Proceedings of the KIEE Conference
/
2000.07b
/
pp.1405-1407
/
2000
This paper is on optimal design for DC substation capacity for Mass Transit System. Three factors are considered for the design i.e. substation arrangements, line configuration and substation power capacity. In this study, we discussed substation power capacity only. At first, DC-fed-traction system is introduced on an outline, a characteristics of train and fed network. Optimal design procedures is described, and modelling for DC-fed-traction system are presented. The circuit-solution method is presented by matrix formula. In order to simulate DC substation power capacity more closely to actual situations, we proposed the program.
Kim, J.K.;Lee, S.D.;Baek, B.S.;Lee, H.D.;Lee, J.Y.
Proceedings of the KIEE Conference
/
2000.11b
/
pp.398-401
/
2000
This paper describes the design of optimal location and capacity of DC substation for Mass Transit System. Three factors are considered for the design i.e. substation arrangements, line configuration and substation power capacity. In this study, we considered all of them for capacity calculation of power supply system for MTS. At first, DC-fed-traction system is introduced on an outline, a characteristics of train and fed network, and design method of substation arrangements. Optimal design procedures are described, and program for capacity calculation of the system is presented. In addition, the computer simulated results are compared with the conventional simple calculation method.
In this paper, the selective use of RTS and CTS frames is considered to analyze the capacity of IEEE 802.11 WLAN (Wireless Local Area Network). The RTS and CTS frames are used to transmit the data frames longer than dot11RTSThreshold according to IEEE 802.11 specification. The analysis of the optimal RTS-CTS threshold is derived to maximize the capacity of IEEE 802.11 WLAN. And, numerical examples are also presented for IEEE 802.11 a and b WLANs.
Park, Jin-Kyung;Baek, Young-Sik;Jeong, Ki-Seok;Park, Ji-Ho
The Transactions of The Korean Institute of Electrical Engineers
/
v.64
no.2
/
pp.208-213
/
2015
This study presents the estimation method for the optimal capacity of BESS(Battery Energy Storage System) in order to reduce the electric charges of common consumer. The daily optimal charge and discharge plan of BESS which satisfies the given constraints is established using linear programming through the change of rated output/rated capacity of the time that shows the electric charges in the highest reduced rate has been selected. There will be a problem to compare only reduced rate because the bigger the rated capacity, the more reduced rate is increased. Therefore, rated output/rated capacity of the time when the reduced amount of electric charges for a year is higher than the investment cost of BESS was selected.
Due to global environmental regulations and policies with rapid advancement of renewable energy technologies, the development type of renewable energy sources (RES) in power systems is expanding from small-scale distributed generation to large-scale grid-connected systems. In the near future, it is expected that RES achieves grid parity which means the equilibrium point where the power cost of RES is equal to the power costs of conventional generators. However, although RES would achieve the grid parity, the cost related with development of large-scale RES is still a big burden. Furthermore, it is hard to determine a suitable capacity of RES because of their output characteristics affected by locations and weather effects. Therefore, to determine an optimal capacity for RES becomes an important decision-making problem. This study proposes a method for determining an optimal installed capacity of RES from the business viewpoint of an independent power plant (IPP). In order to verify the proposed method, we have performed case studies on real power system in Incheon and Shiheung areas, South Korea.
This paper aims to determining the optimal capacity of Pusan port in view point of Container Physical Distribution cost. It has been established a coast model of the container physical distribution system in Pusan port is composed of 4 sub-systems and in-land transport system. Cargo handling system, transfer & storage system and in-land transport system, and analyzed the cost model of the system. From this analysis, we found that the system had 7 routes including in-land transport by rail or road and coastal transport by feeder ship between Pusan port and cargo owner's door. Though railway transport cost was relatively cheap, but, it was limited to choose railway transport routes due to the introducing of transport cargo allocation practice caused by shortage of railway transport capacity. The physical distribution ost for total import & export container through Pusan port was composed of 4.47% in port entring cost, 12.98% in cargo handling cost, 7.44% in transfer & storage cost and 75.11% in in-land transport cost. Investigation in case of BCTOC verified the results as follows. 1) The optimal level of one time cargo handling was verified 236VAN (377TEU) and annual optimal handling capacity was calculated in 516, 840VAN(826, 944TEU) where berth occupancy is $\rho$=0.6 when regardless of port congestion cost, 2) The optimal level of one time cargo handling was verified 252VAN (403TEU) and annual optimal handling capacity was calculated in 502, 110VAN (803, 376TEU) where berth occupancy is $\rho$=0.58 when considering of port congestion cost.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.