• Title/Summary/Keyword: operation time

Search Result 11,293, Processing Time 0.038 seconds

A Preventive Replacement Model for Standby Systems (대기구조를 갖는 시스템의 예방 교체 모형)

  • Lee, Hyo-Seong
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.21 no.4
    • /
    • pp.555-570
    • /
    • 1995
  • We consider a preventive replacement policy for a cold-standby system with N components, in which only one component is in operation at a time. If the component in operation fails, a standby component is immediately switched into operation. If all components fail, the system fails. The system is inspected at random poins in time to determine whether it is to be replaced or not. If the number of failed components at the time of inspection exceeds a threshold value r, the system is replaced. Otherwise the decision is put off until the next inspection point arrives. Under the cost structure which includes a replacement cost, a system down-time cost and a holding cost of the components, we develop an efficient procedure to find the optimal control values N and r, which minimize the expected cost per unit time.

  • PDF

A War-time Engineering Equipment's Assignment and Operation Model (전시 공병장비 할당 및 운용 모형)

  • Jae-Hyeong Lee;Moon-Gul Lee
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.46 no.4
    • /
    • pp.294-303
    • /
    • 2023
  • During wartime, the operation of engineering equipment plays a pivotal role in bolstering the combat prowess of military units. To fully harness this combat potential, it is imperative to provide efficient support precisely when and where it is needed most. While previous research has predominantly focused on optimizing equipment combinations to expedite individual mission performance, our model considers routing challenges encompassing multiple missions and temporal constraints. We implement a comprehensive analysis of potential wartime missions and developed a routing model for the operation of engineering equipment that takes into account multiple missions and their respective time windows of required start and completion time. Our approach focused on two primary objectives: maximizing overall capability and minimizing mission duration, all while adhering to a diverse set of constraints, including mission requirements, equipment availability, geographical locations, and time constraints.

A Study on a Geometrical Analysis for the Manual Mode of an Advanced Teleoperator System (지적 원격조작시스템의 수동모드 개선을 위한 기하학적 해석에 관한 연구)

  • Lee, Sun-Yo;Kim, Chang-Dae;Park, Se-Gwon
    • Journal of the Ergonomics Society of Korea
    • /
    • v.7 no.2
    • /
    • pp.31-44
    • /
    • 1988
  • If an error occurs in the automatic mode when the advanced teleoperator system performs a task in hostile environment then the automatic mode changes into the manual mode. The operation by the control program and the operation by a human recover the error in the manual mode. The system resumes the automatic mode and continues the given task. It is necessary to improve the manual mode in order to make the best use of a man-robot system, as a part of the human interface technique. Therefore, the error recovery task is performed by combining the operation by the control program representing autonomy of a robot and the operation by a human representing versatility of a human operator effectively in the view point of human factors engineering. The geometric inverse kinematics is used for the calculation of the robot joint values in the operation by the control program. The singularity operation error and the parameter operation error often occur in this procedure. These two operation errors increase the movement time of the robot and the coordinate reading time, during the error recovery task. A singularity algorithm, parameter algorithm and fuzzy control are studied so as to remove the disadvantages of geometric inverse kinematics. And the geometric straight line motion is studied so as to improve the disadvantages of the operation by a human.

  • PDF

A Case Study of Aircraft Taxi Fuel Consumption Prediction Model (A380 Case) (항공기 지상 활주 연료소모량 예측모델 사례연구 (A380 중심))

  • Jang, Sungwoo;Lee, Youngjae;Yoo, Kwang Eui
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.28 no.2
    • /
    • pp.29-35
    • /
    • 2020
  • In this paper, we established a prediction model of fuel consumption at the aircraft's taxi operation. To look for countermeasures to reduce fuel consumption and carbon emissions, Airbus A380's actual ground taxi data was used. As a result, the number of stops or turnings during the taxi operation was not related to fuel consumption. It was confirmed that the amount of fuel consumption in the taxi operation was the taxi time and the thrust change. It can be confirmed that ground control optimization, which is the result of close cooperation between the control organization and the airline, is absolutely necessary to reduce taxi time and minimize the occurrence of thrust change events.

Time-temperature relationships of mushroom and cheese omelet in airline catering operations (항공기내식의 품질관리를 위한 연구 - 오믈렛 생산과정의 소요시간 및 온도관계를 중심으로 -)

  • 이영희
    • Journal of the Korean Home Economics Association
    • /
    • v.23 no.4
    • /
    • pp.61-68
    • /
    • 1985
  • This study was conducted in a Korean airline catering operation where about 8, 000~10, 000 in flight meals per day were served. Time ad temperature observations were made in an actual airline catering operation to determine critical control points in mushroom and cheese omelet production, and to provide guidelines for the effective quality control programs of the airline catering operation. All data collection was replicated three times. Time and temperature data were collected by using standard instruments throughout the process sequence. Most phases of the food prodct flow were identified as critical control points. Holding phases of after cooking, and before and after reheating need a special attention, since foods were held at room temperature. Several guidelines were suggested for the effective quality control programs for the airline catering operation.

  • PDF

Development of the automatic transplantation machine of optical fiber controlled by PLC (PLC제어형 광섬유 자동 이식기계 개발)

  • 유우식;김남웅
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.25 no.2
    • /
    • pp.35-41
    • /
    • 2002
  • This paper describes an automatic transplantation machine of optical fiber controlled by PLC. The transplantation operations is a key operation for the optical fiber application products, such as bag, cap, and others. To transplant 200∼500 optical fibers, there are many recurrent manual operation needed with conventional process. In this paper. we propose an automatic machine that reduce transplanting time and enhance product quality. Developed machine includes transplantation, heat cutting and ultraviolet coating operation. Also proposed Machine is controlled by PLC to adjust operation parameters such as pulling length, cycle time, coating time and others. Developed Machine has been applied in the field and found to be a useful system.

A Study on the Optimization of Drilling Operations(II): Optimum Drilling Sequence Selection for Producing a Hole (드릴가공 최적화에 대한 연구(2): 구멍가공시 최적의 드릴가공 순서 결정)

  • Rou, Hoi-Jin
    • IE interfaces
    • /
    • v.12 no.2
    • /
    • pp.346-353
    • /
    • 1999
  • In this paper, the optimum drilling operation sequence which results into the minimum overall machining time required to produce a (multi-diameter) hole is identified. The operation sequence is defined as the set of ordered operations used for producing a (multi-diameter) hole. The overall machining time is derived by summing the minimum machining times of each operation assigned to a sequence. The operations represent the drilling actions of certain sizes to produce the related holes. The minimum machining time of each operation is obtained by solving the optimization problem. Finally, this paper will identify the effects of machining constraints on the overall machining times and their relationships to sequence selection.

  • PDF

A Study on Architecture of Real Time Image Processing System (실시간 영상처리 시스템 구성에 관한 연구)

  • 백남칠;우동민;김영일;최호현
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.37 no.4
    • /
    • pp.240-250
    • /
    • 1988
  • This pc-vision system digitizes/displays 512*512*8 bit pixel image in real time and is capable of the various image processing. This system provides a versatile solution to those users pursuing high performance image processing system compatible with the VME bus, and is general purpose imaging system giving the optimal efficiency for machine vision, medical use and various task. In this paper, Image processing technique has classified image enhancement and image analysis in order to design and implement the pc-vision system. In order to improve processing speed, This system unilizing ROI processing performs point operation, local operation and global operation as well as common arithmetic/logic operation in real time.

  • PDF

A STUDY ON SPACE ZONING BY COMPUTING IDLE-TIMES IN CONSTRUCTION PROCESSES

  • Sang-Min Park;Won-Suk Jang;Dong-Eun Lee
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.509-512
    • /
    • 2013
  • An inappropriate space zoning plan causes the unnecessary transportation of construction material and equipment among work areas and increases the disorder of work space. Space zoning is an essential operation management technique which contributes to reduce the process and/or operation idle-time. This paper introduces a method that computes the idle-times between construction operations (or processes) by using Web-CYCLONE. It allows computing with idle-times that affect the construction productivity. Using the idle time between operations and between processes, it computes the optimal number of zones and finds the optimal combination of zones that minimize the idle times. The method contributes to minimize the idle times relative to the operation schedule using complete enumeration. This paper presents the system prototype in detail. A case study is presented to demonstrate the system and verifies the validity of the model. It allows a project manager to establish space zoning plan that effectively segregates a project into optimal number of construction zones and to assign the constrained resources (e.g., laborer, equipment).

  • PDF

Evaluation of Operation Characteristics with Aeration Time in Intermittent Aeration Membrane Bioreactor (간헐포기 MBR공정에서 포기시간에 따른 운전특성 평가)

  • Lim, Bong-Su;Choi, Bong-Cheol
    • Journal of Korean Society on Water Environment
    • /
    • v.21 no.4
    • /
    • pp.353-359
    • /
    • 2005
  • This study was conducted to evaluate the operation characteristics with aeration time in intermittent aeration membrane bioreactor. The BOD removal efficiency rate of this process was over than 97% regardless of aeration on/off time. To get over than 82% of nitrogen removal efficiency rate, aeration off time needs more than 70 minutes in reactor. Specific denitrfication rate was 2.68 mg $NO_3-N/gMv/hr$ in 40/80 min aeration on/off time, was 2.6 times more than 60/60 min, and 1.4 times more than 50/70 min in 6,300 mg/L of MLSS concentration. Specific nitrification rate was 1.96 mg $NH_4-N/gMv/hr$ in 50/70 min, was 1.4 times more than 40/80 min, but it was effectded little upon nitrification. Microbial activity was effected little according to aeration on/off time, oxygen demend was reduced according to aeration off time increased and microbial concentration increased. The longer aeration off time become, the higher Extraceller Pollymeric Substance (EPS), 50/70 min and 40/80 min in aeration on/off time was increased 1.6 times and 2.7 times, respectively more than 60/60 min because of increase of operation pressure.