• Title/Summary/Keyword: operation test

Search Result 5,241, Processing Time 0.032 seconds

A configuration plan and future expectation of a power distribution test (배전실증시험장의 구성 방안 및 운용 예상효과 분석)

  • Jeong, Yeong-Ho;Kim, Sang-Joon;Park, Sang-Man
    • Proceedings of the KIEE Conference
    • /
    • 1997.07c
    • /
    • pp.829-831
    • /
    • 1997
  • We investigated configuration plan and future expectation of the power distribution test center. The example of foreign country's test center was analyzed, and the required test facilities, test line, and power source for the operation of our test center were proposed.

  • PDF

A Study on Performance Test Standards for High-speed Rolling-stock System (고속철도 차량성능기준(안) 작성에 관한 연구)

  • Wang Jong-Bae;Park Chan-Woo;Kwak Sang-Log
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.569-574
    • /
    • 2005
  • In this study, test standards were developed for performance verification of the high speed(350km/h) rolling-stock. The performance test system consist of three type tests; the component test for core item, the completed car test for combined function & operation and the trial driving test for compatibility & interrelationship with infrastructure.

  • PDF

Design/Construction and Performance Test of Hypersonic Shock Tunnel Part ii : Construction and Performance Test of Hypersonic Shock Tunnel (극초음속 충격파 풍동 설계/구축 및 성능시험 Part II : 극초음속 충격파 풍동 구축 및 성능 시험)

  • Lee, Hyoung-Jin;Lee, Bok-Jik;Kim, Sei-Hwan;Jeung, In-Seuck
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.36 no.4
    • /
    • pp.328-336
    • /
    • 2008
  • The shock tunnel as a hypersonic ground test facility was designed, constructed and its performance test was conducted to reproduce the high speed flow which the hypersonic propulsion system is encountered. The design points were understood and the conceptual design was completed using the quasi one dimensional operation analysis code. After that, the specific performance and compartment design were completed using CFD simulation as the part analysis. The facility was then constructed according to those design results and the performance test was conducted for various operation conditions. In this paper, we suggested the compartment design method using CFD analysis, construction process and various performance test results in detail.

Test Results of a Three Phase 10㎸A HTS Transformer With Double Pan Cake Coils (3상 10kVA 더블 팬케익 코일형 고온초전도 변압기 특성시험 결과)

  • 이승욱;이희준;차귀수;이지광;최경달;류경우;한송엽
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.52 no.3
    • /
    • pp.101-106
    • /
    • 2003
  • The high temperature superconductor transformers gain interests from the industries. This paper described construction and test results of 10㎸A HTS transformer Three phase transformer with double pancake windings were constructed. To reduce the leakage magnetic field, secondary coil were placed between the two primary coils. BSCCO-2223 wire. silicon sheet steel core and FRP cryostats were used to construct the transformer. Three coils were stacked in one cryostat. Two double pancake coils were connected in series for the primary coil and one double pancake coil was used for the secondary coil. Total number of turns of the primary winding and the secondary winding were 112turns and 98urns, respectively, The rated voltages of each winding were 440/220V. The rated currents of each winding were 13.1/26.2A. After the tests of basic properties of the three phase HTS transformer using no-load test, short-circuit test and full-load test, continuous operation of 100 hours with pure resistive load has been carried out. Test results proved over-load capability and reliability of the HTS transformer.

The flow characteristics of a Main Cooling Water System for Nuclear Fuel Test Loop Installed in HANARO (하나로 핵연료 시험루프의 주냉각수 계통 유동해석)

  • Park, Young-Chul;Lee, Young-Sub;Chi, Dai-Yong;Ahn, Seong-Ho;Kim, Yong-Ki
    • 한국전산유체공학회:학술대회논문집
    • /
    • 2008.03b
    • /
    • pp.444-447
    • /
    • 2008
  • A nuclear fuel test loop (after below, FTL) is installed in IR1 of an irradiation hole in HANARO for testing neutron irradiation characteristics and thermo hydraulic characteristics of a fuel loaded in a light water power reactor (PWR) or a heavy water power reactor (CANDU). There is an in-pile section (IPS) and an out-pile section (OPS) in this test loop. When HANARO is normally operated, the fuel loaded in the IPS has a nuclear reaction heat generated by a neutron irradiation. To remove the generated heat and to maintain an operation condition of the test fuel, a main cooling water system (MCWS) is installed in the OPS of the FTL. The pump can not continuously suck a fluid and not pressurize the fluid during a cold function test. To verify the flow characteristics of the MCWS, a flow net work analysis has been conducted. When the higher elevation pipelines wholly filled with coolant, it was confirmed through the analysis results that the pump pressurized the coolant normally. And the analysis results described the system characteristics with operation temperature and pressure variation satisfactorily.

  • PDF

Development of a Workload Index for Monitoring Durability Test of an Excavator (굴착기 내구시험 모니터링을 위한 작업부하 지표 개발)

  • Cho, Jae-Hong;Na, Seon-Jun;Kim, Min-Seok;Park, Myeong-Kwan
    • Journal of Drive and Control
    • /
    • v.19 no.4
    • /
    • pp.29-35
    • /
    • 2022
  • In this paper, we developed a workload index for monitoring the durability test using operation information of an excavator. First, the acceleration and cylinder pressure were selected as load factors by analyzing operation data. Through load correlation analysis according to each load factor, Root Mean Square (RMS) and Work Load Range (WLR) were respectively derived as a load feature representing mechanical load. In addition, the workload index was used to quantify load features. For applying the workload index to monitoring, a real-time monitoring system consisting of sensors and embedded controller was installed on the excavator and the system was integrated with a remote monitoring environment using a wireless network. Results of load monitoring and analysis verified that the developed workload index was effective from the viewpoint of the relative comparison of the workload.

Establishment of Low Temperature Environment System Using Polar Environment Performance Test Construction (극지환경성능시험설비를 활용한 저온환경 시스템 구축)

  • Sung, Ki-Young;Han, Seong-Jong;Lee, Jung-Hee
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.5
    • /
    • pp.843-851
    • /
    • 2022
  • This paper was conducted to study the conditions for the manufacture and operation of artificial snow removal and ice-making test facilities so that the test equipment can be tested in a low-temperature environment using the polar environment performance test facility. The polar environment performance test Facility is designed to artificially simulate extreme environments up to -65 ℃, and is a mid-to-large low-temperature environment test facility that can perform performance tests on offshore plant equipment, ships, leisure, and offshore structures. To verify the safety of deck work of ships operating in polar environments, artificial snow removal and artificial ice making devices were manufactured, and we conducted research on various operating environments using these facilities. For the efficient operation of artificial snow and ice making facilities, it is important to continuously supply dry air, and it has been found that installing an additional heater at the tip of the nozzle is effective in preventing freezing.

Autonomous SpeedSprayer Using DGPS and Fuzzy Control (II) - Real Operation - (DGPS와 퍼지제어를 이용한 스피드스프레이어의 자율주행(II) - 실제주행 -)

  • 이재훈;조성인;이정엽
    • Journal of Biosystems Engineering
    • /
    • v.23 no.1
    • /
    • pp.75-82
    • /
    • 1998
  • Autonomous speedsprayer operation was conducted using a fuzzy controller combined with a DGPS. The signal of DGPS receiver and signals of four ultrasonic sensors were processed in real time. The speedsprayer was steered with two levers controlled by two hydraulic cylinders. The fuzzy controller has two inputs; direction of running obtained from the DGPS receiver and distance from trees measured by ultrasonic sensors. The operation times of the hydraulic cylinders were inferred as outputs of the fuzzy controller. Field test results showed that the speedsprayer could be autonomously operated by the developed fuzzy controller including turning operation in the end of the tree row. The ultrasonic sensors contributed a little to performance of the autonomous operation, but the speedsprayer could avoid trees or obstacles in emergent situations with them.

  • PDF

Development of an operation and control software for electro-hydraulic (전자유압식 CVT의 운용 및 제어 소프트웨어 개발과 실시간 제어)

  • Kwan, H. B.;Kim, K. W.;Kim, H. S.;Eun, T.;Park, C. I
    • Journal of the korean Society of Automotive Engineers
    • /
    • v.15 no.3
    • /
    • pp.36-46
    • /
    • 1993
  • In CVT vehicle, the engine speed is completely decoupled from the vehicle speed within the range from maximum transmission ratio to minimum transmission ratio. This allows the engine to operate in optimal state(e.g. best fuel economy or maximum power mode.) In this study, the CVT control algorithm for optimal operation of engine is suggested. In order to implement the real time digital control of electro-hydraulic CVT system, a software called CVTCON has been developed. CVTCON also includes the CVT operation module, (2) system test module, (3) system control module and (4) data management module. By using the CVTCON and the electro-hydraulic CVT system, two modes of experiments were carried out: constant throttle opening mode and acceleration mode. From the experimental result, it was found that the algorithm suggested in this study showed optimal operation of the CVT system.

  • PDF

Operation Control Model of Lift Car to Reduce Worker Lifting Time in Tall Building Construction (초고층 건축공사의 작업원 양중시간 단축을 위한 리프트 카 운행제어 모델)

  • Nam, Chulu;Kwon, Jaebeom;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.160-161
    • /
    • 2016
  • In tall building construction, lift car for worker lifting is a critical factor for construction productivity. To reduce worker lifting time, existing researches have been conducted on lift car planning. While, research on lift car operation is insufficient. For the efficient reduction of worker lifting time, lift car operation control is needed with lift car planning. Therefore, this research suggests operation control model of lift car to reduce worker lifting time. According to the result of a model test, the operation control model contributes to reasonable reduction of worker lifting time.

  • PDF