• 제목/요약/키워드: operation planning system

검색결과 961건 처리시간 0.03초

A Process Planning System for Machining of Dies for Auto-Body Production(II)-Operation Planning and NC Code Post-Processing (자동차 차체금형 가공용 공정계획 시스템(II)-작업 계획과 NC 코드 후처리)

  • Sin, Dong-Mok;Lee, Chang-Ho;Choi, Jae-Jin;Noh, Sang-Do;Lee, Ki-Woo
    • Journal of the Korean Society for Precision Engineering
    • /
    • 제18권1호
    • /
    • pp.63-73
    • /
    • 2001
  • This paper presents a process and operation planning system with an NC code post-processor for effective machining of press dies for production of cars. Based on the machining features, major parts of press dies are categorized into 15 groups and a standard process plan is defined for each group. The standard process plan consists of a series of processes where a process is defined as a group of operations that can be done with one setup. Details such as cutting tools, cutting conditions, and tool paths are decided at the operation planning stage. At the final stage of process and operation planning, the NC code post-processor we developed adjusts feedrates along the tool path to reduce machining time. The adjustment rule is selected based on the metal removal rate estimated by virtually machining with virtual cutting tool.

  • PDF

Optimal Capacity and Allocation Distributed Generation by Minimization Operation Cost of Distribution System (배전계통 운영비용의 최소화에 의한 분산전원의 최적 용량과 위치결정)

  • 배인수;박정훈;김진오;김규호
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • 제53권9호
    • /
    • pp.481-486
    • /
    • 2004
  • In operation of distribution system, $DG_s$ Distributed Generations) are installed as an alternative of extension and establishment of substations and transmission and distribution lines according to increasing power demand. In operation planning of $DG_s$, determining optimal capacity and allocation gets economical pro(it and improves power reliability. This paper proposes determining a optimal number, size and allocation of $DG_s$ needed to minimize operation cost of distribution system. Capacity of $DG_s$ (or economical operation of distribution system estimated by the load growth and line capacity during operation planning duration, DG allocations are determined to minimize total cost with power buying cost. operation cost of DG, loss cost and outage cost using GA(Genetic Algorithm).

Characteristics of Managing System and Planning Guidelines for Rooming House in Canada (캐나다 루밍하우스의 계획기준과 관리제도 특성 분석)

  • Byun, Nahyang;Kang, Junekyung
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • 제34권12호
    • /
    • pp.31-38
    • /
    • 2018
  • The number of share houses has increased in Korea, and social recognition of this type of housing is also growing. In order to review current conditions and housing systems for share houses, an analysis of rooming house, a type of share house that is built overseas, was carried out. This study focused on studying rooming houses of Canada. Residents occupy in rooms and share common spaces with other tenants in rooming houses. The purpose of this research is to study planning guidelines, systems, operation management of rooming houses and the process and role of public and citizen participation. Based on characteristics of planning guidelines and operation management for rooming houses, implications which can be used for setting institutional and planning foundations for share houses in Korea have been presented through this research.

Optimal Reactive Power Planning Using Decomposition Method (분할법을 이용한 최적 무효전력 설비계획)

  • 김정부;정동원;김건중;박영문
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • 제38권8호
    • /
    • pp.585-592
    • /
    • 1989
  • This paper presents an efficient algorithm for the reactive planning of transmission network under normal operating conditions. The optimal operation of a power system is a prerequisite to obtain the optimal investment planning. The operation problem is decomposed into a P-optimization module and a Q-optimization module, but both modules use the same objective function of generation cost. In the investment problem, a new variable decomposition technique is adopted which can operate the operation and the investment variables. The optimization problem is solved by using the gradient projection method (GPM).

  • PDF

A Decision Support System for the Efficient Operation of Container Port Terminals (컨테이너 터미널의 효율적 운영을 위한 의사결정지원시스템)

  • Kim, Kap-Hwan;Kim, Hong-Bae;Yun, Won-Young;Kim, Jong-Hoon;Kwon, Bong-Jae;Cho, Chi-Wun
    • IE interfaces
    • /
    • 제11권1호
    • /
    • pp.105-117
    • /
    • 1998
  • A decision support system is introduced for the efficient operation of port container terminals. It consists of ship planning subsystem, yard planning subsystem, resource management subsystem, real-time control subsystem, and simulation subsystem. The system is intended to support the planning process of the planners and the operation process of the administrators in the container terminals. It is assumed that the transfer cranes and the yard tractor/trailers are used to handle containers in the marshaling yard. The system is explained in terms of the functions of each subsystem and the data flows among various subsystems.

  • PDF

Maintenance Limit Renewal Policy for Inferiority System based on Opportunity Cost (기회비용을 고려한 열화시스템의 보전한계갱신정책)

  • 박상민;김연수
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • 제17권32호
    • /
    • pp.233-242
    • /
    • 1994
  • This study deals with the derivative adverse minimum for inferiority system depends on continuose operating under infinite planning horizon. This planning will be accomplished by maintenance limit renewal policy in consideration of opportunity cost which affects system by failure during operation periods and expected cost under nomal operation states. By the results, we will be expected incresing total efficiency for the system by optimal renewal policy.

  • PDF

Optimized Module Design for Berth Planning of Logistics Information System Using Tabu Search Algorithm (타부탐색을 이용한 물류정보시스템의 선석계획 최적화 모듈 설계)

  • Hong, Dong-Hee;Kim, Chang-Gon
    • The KIPS Transactions:PartB
    • /
    • 제11B권1호
    • /
    • pp.63-70
    • /
    • 2004
  • Port operation is largely divided into gate operation, yard operation and berth operation. Operation strategy and optimal resource allocation for three parts are important in the productivity of the port operation.. Especially the resource allocation planning in berth operation needs optimization, because it is directly connected with the processing time in shipping. Berth planning is not independent on recourse allocation but interrelated with yard stacking area allocation. Therefore, we design the optimized module of berth planning and give priority to interrelationship with yard space allocation, while existing studies design independent resource allocation in berth planning. We suggest constraints by mathematical method, and they are related to yard stacking area allocation with existing constraints. Then we look for solutions, use tabu search to optimize them, and design optimized the berth planning module. In the performance test of optimized module design of berth planning, we find that the berth planning with yard stacking area allocation takes less processing time than without yard stacking area allocation.

A Process-net based System for the Integration of Process Planning and Operation Scheduling (동정 네트 모델에 의한 공정 계획과 일정 계획의 통합)

  • 박지형;강민형;노형민
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 한국정밀공학회 1997년도 춘계학술대회 논문집
    • /
    • pp.445-449
    • /
    • 1997
  • In order to provide a manufacturing system with efficiency and flexibility to cope with the changes in shop floor status, the integration of process planning and operations scheduling is required. In this paper,an integrated system of process planning and operations scheduling based on the concept of process net model is presented. The process net model includes the alternative process plans. The integrated system is applied for prismatic parts.

  • PDF

A Study on the Optimal Planning Model of Building Integrated Energy System's Components (건물용 종합에너지시스템 구성요소의 최적 투자모형에 관한 연구)

  • Suh, S.O.;Park, J.S.;Chang, S.C.;Kim, J.H.
    • Proceedings of the KIEE Conference
    • /
    • 대한전기학회 1997년도 하계학술대회 논문집 D
    • /
    • pp.797-799
    • /
    • 1997
  • This paper presents an operation and planning model of integrated energy systems which consist of small scale cogeneration systems, thermal accumulator, ice storage and electrical energy storage systems. In the proposed planning model, an optimization of total cost which contains investment, operation, thermal shortage and salvage costs has carried out with the maximum principle based on the lifetime of each system component and unit price per capacity. From this model, optimal investment capacity per annum can be determined during the studied periods using the marginal costs according to the operation characteristics of each system component.

  • PDF

Rough-cut simulation algorithm for the decision of operations policy at the block paint shop in shipbuilding (조선 도장공정 운영전략 수립을 위한 사전모의실험기법)

  • Chung, Kuy-Hoon;Park, Chang-Kyu;Min, Sang-Gyu;Park, Ju-Chull;Cho, Kyu-Kab
    • IE interfaces
    • /
    • 제14권1호
    • /
    • pp.59-66
    • /
    • 2001
  • This paper introduces the case study that has been performed at the block paint shop, Hyundai Heavy Industries. First of all, the overall production processes of shipbuilding and research activities conducted by Korean are reviewed with a view-point of production planning. Then HYPOS(Hyundai heavy industries Painting shop Operation System) project is briefly described, which has several modules such as planning module, scheduling module, work order module, and DB(database) management module. Although the HYPOS system has several modules, this paper mainly focuses on the planning module that utilizes the rough-cut simulation algorithm to make a decision about the policy for production schedule. The HYPOS has been operated since June, 2000 and the operation data has been collected for the purpose of future evaluation about the performance of HYPOS system. The evaluation of HYPOS will be shown in a public domain as soon as the enough operation data is available.

  • PDF