In this paper we describe Flexible Manufacturing Systems (FMS) using Petri nets, since Petri nets provide a powerful tool for modeling dynamical behavior of discrete concurrent processes. We deal with off-Line and on-Line rule-based scheduling of FMS. The role of the rule-base is to generate appropriate priority rule for resolving conflicts, that is, for selecting one of enabled transitions to be fired in a conflict set of the Petri nets. This corresponds to select a part type to be processed in the FMS. Towards developing more Intelligent Manufacturing Systems (IMS) we propose a conceptual framework of a futuristic intelligent scheduling system.
The factory under this study consists of mixed-model assembly lines and workcenters which provide parts to the main lines. Parts produced by the workcenter have different specifications for different product models. The workcenters fabricate parts in batches, and they are divided into two types. A type 1 center supplies parts only to the main line that is designated to the center while type 2 center provides parts to all the main lines. The purpose of this study is to develop a scheduling scheme for the workcenter, and the main objective of the schedules is to provide parts for the main lines without delay. The facts that make the scheduling challengeable are that 1) the different models existing together on a main line request different parts, 2) the spaces for part inventories are limited and 3) set up times are sequence dependent and long in some cases. This study presents developed scheduling schemes for the type 1 center and explains the scheduling and control structure used.
The 6th International Conference on Construction Engineering and Project Management
/
pp.166-168
/
2015
Line of Balance (LOB) method is suitable to schedule construction projects composed of repetitive activities. Since existing LOB based repetitive project scheduling methods are deterministic, they do not lend themselves to handle uncertainties involved in repetitive construction process. Indeed, existing LOB scheduling dose not handle variability of project performance indicators. In order to bridge the gap between reality and estimation, this study provides a stochastic LOB based scheduling method that allows schedulers for effectively dealing with the uncertainties of a construction project performance. The proposed method retrieves an appropriate probability distribution function (PDF) concerning project completion times, and determines favorable start times of activities. A case study is demonstrated to verify and validate the capability of the proposed method in a repetitive construction project planning.
Wang, Chong;Mao, Puxiu;Mao, Yunsheng;Shin, Jong Gye
International Journal of Naval Architecture and Ocean Engineering
/
제8권4호
/
pp.398-408
/
2016
Based on non-completely hybrid flow line scheduling of panel block in shipbuilding, several uncertain factors influencing the problem were analyzed in a real environment, and a nonlinear integer programming model was built for each sub-scheduling problem. To narrow the difference between theory and application, rolling horizon and rescheduling methods are proposed. Moreover, with respect to the uncertainty of processing time, arriving time and due time, we take the minimizing of the early and delayed delivery costs as the objective, and establish an evaluation with a global penalty function. Finally, numerical experiments and a simulation analysis were undertaken to demonstrate the effectiveness of the model and algorithm.
Panel line is an important process occupying the largest work amount in shipbuilding. In this research product simulation has been carried out to establish the optimal production scheduling. For this purpose a web-based panel line simulator was developed using an object modeling technology and C# language. The balance of work-load and increase in the productivity by the improvement of production facilities and process are the key factors for a good scheduling. In this study SPRT(Shortest Remaining Process Time) rule was applied for the work-load balancing and a good result achieved. To increase the productivity in the stiffener welding stage which is a bottleneck; process, more welding heads and higher welding speed were tested using the developed simulator. The simulation results showed that either more welding head or higher welding speed decreased the total work time. Use of both, however, deteriorated the productivity because of the bottleneck in the following stage. This result points out that the improvement of production facilities and/or process should be evaluated with their influences on the leading and following processing stage.
The purpose of this research is to develop a scheduling system for CAL (Continuous Annealing Line) in Cold Rolling Mill. Based on CSP (Constraint Satisfaction Problem) technique in artificial intelligence, appropriate algorithms to provide schedules satisfying all the constraints imposed on CAL are designed and developed. Performance tests show that the proposed scheduling system outperforms human operators in case of aggregating the same attributes and minimizing the thickness differences between two adjacent coils.
KIEE International Transaction on Electrical Machinery and Energy Conversion Systems
/
제4B권1호
/
pp.29-35
/
2004
Locomotive scheduling in railway systems experiences many difficulties because of the complex interrelations among resources, knowledge and various constraints. Artificial intelligence technology has been applied to solve these scheduling problems. These technologies have proved to be efficient in representing knowledge and rules for complex scheduling problems. In this paper, we have applied the CSP (Constraints Satisfaction Problems) programming technique, one of the AI techniques, to solve the problems associated with locomotive scheduling. This method is more effective at solving complex scheduling problems than available mathematical programming techniques. The advanced locomotive scheduling system using the CSP programming technique is realized based on the actual timetable of the Saemaul type train on the Kyong-bu line. In this paper, an overview of the CSP programming technique is described, the modeling of domain and constraints is represented and the experimental results are compared with the real-world existing schedule. It is verified that the scheduling results by CSP programming are superior to existing scheduling performed by human experts. The executing time for locomotive scheduling is remarkably reduced to within several decade seconds, something requiring several days in the case of locomotive scheduling by human experts.
The systematic management of technology infrastructure increasingly becomes critical as it represents the driving power for creating competitive advantage of nations and enterprises. In this sense, public facility and equipment, which is one major asset of technology infrastructure, should be managed effectively, systematically and efficiently to increase its overall equipment effectiveness. However, the manual and off-line communication was the unique way to communicate between the suppliers who provide facilities in the public sector and the customers who utilize the facilities in the industrial sector. This communication way caused invisibility of available usage time and increase of idle time, thereby decreasing the equipment effectiveness. This paper presents an web-based scheduling system that enables real-time collaboration and information sharing for increasing the equipment effectiveness. The designed system performs scheduling, facility management, order management and customer relationship management in an on-line platform, and carries out the processing and storing of relevant information in an integrated database. The paper includes a development approach to identify business process models and standardized system models by using object-modeling technique. The deliverable of the present work will contribute to increasing the equipment effectiveness by enhancing visibility, transparency and predictability by means of the integration with a legacy Enterprise Resource Planning.
Utilizing the simulation approaches, the dynamic production scheduling system FOLS(Flexible flowshop On-Line Simulation) is developed under the flexible flowshop environment. When an interruption such as machine failure/recovery is occurred at the shop floor, the FOLS system performs evaluations for job selection rule oriented alternatives, and generates a dynamic production schedule based on the collected current shop floor data. For the case study, the FOLS system is applied to the printed circuit card assembly(PCCA) line and simulation results are reported.
Scheduling plays an important role in the process management in terms of providing profit-maximizing operation sequence of multiple orders and estimating completion times of them. In order to takes its full potential, varying conditions should be properly reflected in computing the schedule. The adjustment of scheduling decisions has to be made frequently in response to the occurrence of variations. It is often challenging because their model has to be adjusted and their solutions have to be computed within short time period. This paper employs Model Predictive Control(MPC) principles for updating the process condition in the scheduling model. The solutions of the resulting problems considering variations are computed using parametric programming techniques. The key advantage of the proposed framework is that repetition of solving similar programming problems with decreasing dimensionis avoided and all potential schedules are obtained before the execution of the actual processes. Therefore, the proposed framework contributes to constructing a robust decision-support tool in the face of varying environment. An example is solved to illustrate the potential of the proposed framework with remarks on potential wide applications.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.