• Title/Summary/Keyword: on-line assessment

Search Result 686, Processing Time 0.027 seconds

Implementation and performance assessment of high-rate digital subscriber lind(HDSL) interface function under ATM (ATM 기반의 HDSL 정합기능 구현 및 성능평가)

  • 양충렬;장재득;김진태;강석열;김환우
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.22 no.5
    • /
    • pp.990-1006
    • /
    • 1997
  • This paper describes an interface function and its performance assessment for high-bit-rate digital subscriber line (HDSL) under ATM. The interface of HDSL function of ATM system was achieved by HDSL subscriber physical layer board assembly(HSPA) which was modeled as design standard for ATM. We have presented a new worst case of subscriber line conditions from existing results of investigations on impairments such as crosstalk, impulse noise, longitudinal, power line noise and others. We have measured the maximum service loop length available by HDSL, and found that HSPA, at a 2.048Mbps data transmission, is possible within a carrier serving area(CSA) under the worst case loop noise conditions at an error rate or 10$^{-7}$ on a two coordinated unshielded twisted pairs in the presense of impairments. We conclude tht, in terms of a performance-per-lin simulator, the HSPA is an excellent candidate for HDSL implementation under ATM.

  • PDF

A Study on the Risk Assessment for Works on/near Operating Line (열차운행선 지장공사에 대한 위험도 평가 연구)

  • Jung, Do-Hyun;Wang, Jong-Bae;Lee, Su-Ryong
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1515-1524
    • /
    • 2008
  • In this study, railway accidents from constructing or maintaining works on/near operating line were reviewed during 2005-2007 years. Causes and hazards analysis of these accidents was performed to make an accident scenario for risk assessments. And the risk of worker casualty on/near operating line was quantitatively assessed. Also a constitution method of Risk Matrix for manage tolerable risk level was proposed.

  • PDF

The Development Plan of Voltage Security On-Line Monitoring System (전압안전성 온라인 감시시스템의 개발방안)

  • Jeon, D.H.;Kweon, S.G.;An, G.W.
    • Proceedings of the KIEE Conference
    • /
    • 1998.07c
    • /
    • pp.1173-1175
    • /
    • 1998
  • This paper presented the development plan of voltage security on-line monitoring system (VSECOMs). VSECOMs consists of voltage security monitoring system and data management system. VSECOMs has the function of bus voltage watch. voltage stability analysis, and voltage security assessment. EMS data on-line acquisition, PSS/E file conversion, and overall data management. VSECOMs is designed with client/server structure. We will seek stable operation of KEPCO's power system by installation of VSECOMs in EMS of KEPCO.

  • PDF

Assessment of Fuzzy Measure Possibility for the Electromagnetic Field of unbalanced two coupled Three-phase Transmission line Considering toad-Voltage Characteristics (부하의 전압특성을 고려한 3상 2회선 불평형 송전선로에서의 전자계에 대한 퍼지척도 가능성평가)

  • 송현선;김상철
    • Journal of the Korean Society of Safety
    • /
    • v.16 no.3
    • /
    • pp.45-52
    • /
    • 2001
  • This paper presents a study on the assessment of fuzzy measure possibility for the electromagnetic field of unbalanced system. It takes into account m untransposed transmission line and unbalanced load. A three phase load flow program was developed which employs a Newton-Raphson method as a tool to analyze system unbalanced. This research presents a method of handling two coupled three phase transmission system unbalance analysis and unbalanced power demand as a function of voltages. In assessment of fuzzy measure possibility for the electromagnetic field, this paper use probability of fuzzy and measure of fuzziness technique.

  • PDF

A Development and Performance Test of Voltage Measurement Accuracy Assessment System for Distribution Equipment (배전기기 전압계측 정밀도 평가시스템 개발 및 성능시험)

  • Cho, Jin-Tae;Kim, Ju-Yong;Lee, Hak-Ju;Kim, Jae-Han
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.27 no.9
    • /
    • pp.83-89
    • /
    • 2013
  • Power distribution system has been changed from radial system to closed loop or mesh system due to connection of distributed generation growth. Data from distribution equipments which are installed at distribution line is required to be accurate for the performance of DMS(Distribution Management System). This paper analyzes the voltage measurement data from distribution equipment. However, the results of the analysis are confirmed to have some errors in voltage measurement data from distribution equipment. These errors come from aging of voltage sensor in distribution equipment and inaccurate data transfer to FRTU(feeder remote terminal unit) through the controller. The main problem is that the voltage measurement data of distribution equipment can not be assessed after it's first installation at the distribution line. The voltage measurement accuracy assessment system is to assess the voltage measurement data from distribution equipment on hot-line. This study had a field test to verify the performance of system.

A Study of On-line Monitoring System for a KEPCO Pumped Storage Generator/Motor

  • Kim Hee-Dong;Ju Young-Ho;Kim Yong-Joo;Cho Kyu-Bock
    • Transactions on Electrical and Electronic Materials
    • /
    • v.7 no.2
    • /
    • pp.90-95
    • /
    • 2006
  • An on-line diagnostic test has been studied and performed for the pumped storage generator/motor. This study aims at reducing the diagnostic cost, minimizing the technical dependency on third party manufactures. Further design of on-line diagnostic system such as shorted-turn of rotor winding, partial discharge (PD) of stator winding and air-gap between stator and rotor for pumped storage generator/motor has been verified. In addition, it needs to be validated on site performance of the developed continuous on-line monitoring system for corresponding tasks for the improvement of the availability & reliability during operation.

Performance Evaluation of the Small Automatic Line Marking Equipment (소형 차선도색 자동화 장비의 성능 평가에 관한 연구)

  • Lee, Yongmun;Kim, Sangtae;Kim, Heungrae;Choi, Keechoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.4
    • /
    • pp.677-684
    • /
    • 2016
  • In order to improve the nighttime visibility of the lane, the need for the development of the automated line marking equipment is on the rise. The purpose of this study is to suggest performance assessment methodology that can be assessed from various aspects such as productivity, safety and quality performance of line marking equipment and to comprehensively analyze the performance of hand-operated and automated equipment based on field test. The following shows the results. It suggested a methodology capable of analyzing the performance of the line marking equipment in terms of productivity, safety and quality. Automated equipment for line marking was analyzed that can be obtained productivity achievement rate of 156.3% as compared with hand-operated equipment. On the basis of the expert advise and literature review, we derived twelve safety factors and ten quality factors of unit work in line marking. By utilizing the AHP technique, we estimated the importance of safety and quality factors. Automated equipment for line marking was analyzed to have been able to expect safety improvement rate of 49.8% and quality improvement rate of 47.2%. It is expected that the performance assessment methodology suggested in this study will be useful in analyzing objective and quantitative validity and expected effectiveness of the line marking equipment.

Safety Assessment and Capacity Rating of Existing P.C, Bridges based on Reliability Methods (신뢰성 방법에 기초한 기설 P.C교의 안전도 및 내하력 평가)

  • 조효남;김민영;서종원
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1990.10a
    • /
    • pp.45-50
    • /
    • 1990
  • This study develops practical models and methods for the assessment of safety and capacity rating of existing P.C. girder bridges based on the reliability methods. One of the main objectives of the study is to propose a practical but realistic limit state model for safety assessment and LRFR rating criteria, which explicitly incorporates the degree of deterioration and damage as well as actual condition of P.C. girder bridges in terms of the damage factor and the response ratio. The damage factor proposed in the paper is defined as the ratio of the current estimated stiffness to the intact base-line stiffness of a member. Based on the observation and the results of applications to existing bridges, it may be concluded that the proposed methods for the assessment and capacity rating models, which explicitly account for the uncertainties and effects of degree of deterioration or damage, provide more realistic and consistent safety-assessment and capacity rating.

  • PDF

Assessment of capacity curves for transmission line towers under wind loading

  • Banik, S.S.;Hong, H.P.;Kopp, Gregory A.
    • Wind and Structures
    • /
    • v.13 no.1
    • /
    • pp.1-20
    • /
    • 2010
  • The recommended factored design wind load effects for overhead lattice transmission line towers by codes and standards are evaluated based on the applicable wind load factor, gust response factor and design wind speed. The current factors and design wind speed were developed considering linear elastic responses and selected notional target safety levels. However, information on the nonlinear inelastic responses of such towers under extreme dynamic wind loading, and on the structural capacity curves of the towers in relation to the design capacities, is lacking. The knowledge and assessment of the capacity curve, and its relation to the design strength, is important to evaluate the integrity and reliability of these towers. Such an assessment was performed in the present study, using a nonlinear static pushover (NSP) analysis and incremental dynamic analysis (IDA), both of which are commonly used in earthquake engineering. For the IDA, temporal and spatially varying wind speeds are simulated based on power spectral density and coherence functions. Numerical results show that the structural capacity curves of the tower determined from the NSP analysis depend on the load pattern, and that the curves determined from the nonlinear static pushover analysis are similar to those obtained from IDA.

Development of Inspection System for Crack on the Lining of Concrete Tunnel (콘크리트 터널 라이닝 균열검사 시스템 개발에 관한 연구)

  • 고봉수;손영갑;신동익;김병화;한창수
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.10 no.1
    • /
    • pp.66-72
    • /
    • 2004
  • To assess tunnel safety, cracks in tunnel lining are measured by inspectors, who observe cracks with their naked eyes and record them. But manual inspection is slow, and measured crack data is subjective. Therefore, this study proposes inspection system fur measuring cracks in tunnel lining and providing objective crack data to be used in safety assessment. The system consists of On-vehicle system and Laboratory system. On-Vehicle system acquires image data with line CCD camera on scanning along the tunnel lining. Laboratory system extracts crack information from the acquired image using image processing. Measured crack information is crack thickness, length and orientation. To improve accuracy of crack recognition, the geometric properties and patterns of cracks in concrete structure were applied to image processing. The proposed system was verified with experiments in both laboratory environment and field environment such as subway tunnel.