Kim, Dong-Ho;Jang, Won-Yil;Kim, Seong-Yun;Shin, Sung-Ryul;Lim, Jong-Se;Yoon, Ji-Ho
Journal of Advanced Marine Engineering and Technology
/
v.33
no.2
/
pp.355-361
/
2009
Onshore wind farms having several problems, difficult to secure a building site and incur the enmity of the people. Therefore, offshore wind farms are increasingly expected, because there are huge resource and large site in offshore. If huge wind turbines are constructed, the offshore wind power base is concerned about subsidence. In order to confirm the ground stability, estimation of subsidence is necessary. In this paper, the subsidence is predicted by continuity model when the gravity and the mono-pile base are constructed on soft ground. The FLAC 3D, three dimensional FDM program, was adopted to analysis subsidence. Input factors are yielded by geological information at the yeompo quay in ulsan and the results of laboratory experiments. It has been compared that the original ground with improved ground under the gravity base, and constructed mono-pile under the mono-pile base.
Yoon Seok Chae;Ho Min Kim; Ji Hyung Kim;Sung Hoon Lee
Journal of Wind Energy
/
v.14
no.4
/
pp.43-49
/
2023
We have studied biofouling in Korea's offshore wind farms by using image analysis through monitoring and surface energy analysis. To observe the biofouling characteristics, samples were fabricated using Micron extra 2 and PropOne, which have a self-polishing property, and Hempathane HS 55610, which is used in substructure coatings. The manufactured samples were installed at the bottom of a ladder in a substructure, and monitored for 10 months. The most biofouling occurred in the sample without the self-polishing property, and algae, barnacles and corallinales were observed. The surface energy analysis used the Owens-Wendt-Rabel and Kaelble (OWRK) model, which uses the contact angles of two standard fluids. As a result of calculating the surface energy using contact angle measurement, the sample without the self-polishing property showed the highest value. This result was consistent with the biofouling incidence observed through monitoring.
Jin-Oh Kim;Byoungwook Min;Kyung-Sook Woo;Jin-Pyo Kim
Journal of Environmental Impact Assessment
/
v.32
no.4
/
pp.230-241
/
2023
At a time when it is urgent to establish a management system for landscape quality assessment of offshore wind farms in Korea, we analyzed foreign cases to draw implications for improving the landscape quality assessment of offshore wind farms in Korea and to explore the direction of efficient landscape assessment. The main contents derived from the analysis of overseas cases and systems are as follows. First, offshore wind farms are large-scale projects, and it is necessary to consider the landscape from the pre-planning stage, as in overseas cases. Second, the evaluation items for marine landscape quality should be expanded and systematized. Third, a flexible evaluation system that can consider new landscape impacts is required. In order to identify the landscape impacts of offshore wind farm projects, we refer to the landscape assessment items and procedures derived from overseas cases, but reflect them appropriately to the domestic maritime conditions, and specifically introduce a plan to minimize the landscape impacts that may occur during offshore wind farm projects to contribute to the sustainable use of offshore wind power.
Kim, Dong-Joon;Kim, Su-Rin;Choo, Yun-Wook;Kim, Dong-Soo;Lee, Man-Soo
Proceedings of the Korean Geotechical Society Conference
/
2010.09a
/
pp.825-839
/
2010
The global and domestic market for offshore wind farm is expected to grow fast, and the design and installation of substructure and foundation is getting more important. As for the offshore wind farms located in the shallow(depth < 20m) water, the construction and installation of the substructure and foundation makes up about 1/4 ~1/3 of the offshore wind farm construction cost, and the portion is expected to increase because the turbine capacity is increasing from 2 ~ 3MW to 5MW or larger and the water depth of wind farms is also increasing over 30m. As a foundation for offshore wind turbine, the suction caisson foundation is being considered to be a highly competitive alternative to the conventional monopile or gravity based structure, because it has features suitable for the offshore construction such as quick installation, no heavy equipment for penetration and no hammering noise for driving. In order to study the installation behaviour of the suction caisson, laboratory tests were performed with sand. The pore water pressure and displacement were measured to analyze the suction pressure during penetration, the penetration speed and the amount of heaving.
This study applied long-term wind speed data from Penghu and Dongjidao weather stations to simulate the wind energy production for eight onshore and one offshore wind farms at Penghu Island, Taiwan by a commercial software package, Wind Atlas Application Program (WAsP). In addition, the RET Screen software suite was also applied to analyze economic characteristics of these nine wind farms (WFs). The results show that the capacity factors (CFs) of the nine wind farms mentioned above are in the range of 44.5% to 49.1%. In addition, utilizing 1.8-MW wind turbines (WTs) for all onshore WFs was the most feasible selection among the four potential types of WTs (600, 900, 1,800 and 3,600 kW) considered. 3-MW WTs selected for the offshore WF can produce the most wind energy and the smallest wake loss among the three possible types of WTs (1, 2 and 3MW). As a consequence of implementing these WFs, the emission of about 680,977 tons carbon dioxide ($tCO_2$) into the local atmosphere in Penghu Island annually could be avoided. Finally, based on the payback periods achieved, the order of implementation of the considered WFs can be identified more clearly. Longmen WF should be the first priority, and the next one should be SiyuWF and so on. Besides, this study provides much useful information for WF planning on Penghu Island.
This paper conducted an analysis of economic effects of offshore wind power in Korea with benefit/cost analysis. The existing feed-on tariff, which was too low to support wind power development, was recently replaced with a Renewable Portfolio Standard(RPS), effective from 2012. According to the new regulatory policy, The Korean government has announced a strategy to draw investments worth for offshore wind farms with a total capacity of 2.5 GW over the next eight years, which is expected the change of cost and benefit. After overview the offshore wind power development status, The effects on cost can be divided by economic, environmental and social factors. Each factor will be calculated and combined by both evaluating index and using Quantification methods. At the end, the implication for the evaluation of feasibility of offshore wind power of Korea will be done.
Proceedings of the Korean Institute of Building Construction Conference
/
2022.11a
/
pp.193-194
/
2022
The use of high-strength grout for facility foundations and bridges has recently been expanding in offshore wind farms. Offshore wind farms require a bearing capacity for horizontal loads such as wind, waves. Therefore, in this study, the strength of the high-strength grout discharged through pump pressure was measured and compared with the existing strength to secure the strength after the underwater pump pressure of the high-strength grout used in the offshore wind connection. The compressive strength measurement showed that the strength difference at each position of the core specimen was 1% higher than that of the other specimens, and there was almost no change in the strength according to the height. The strength of the core specimen decreased by 23% compared to the existing strength, which is similar to the result of this study because the strength of the core specimen decreased by approximately 25% compared to the general specimen according to related research. Therefore, it is believed that there is no decrease in strength due to underwater pumping.
Jong-Kap AHN;You-Jin PARK;Yu-Jin JEONG;Young-Su AN
Journal of the Korean Society of Fisheries and Ocean Technology
/
v.59
no.4
/
pp.354-361
/
2023
In this study, the AHP (analytic hierarchy process) technique was used to analyze the risk of expected risk factors and fishing possibilities during gillnet fishing within the floating offshore wind farms (floating OWF). For this purpose, the risks that may occur during gillnet fishing within the floating offshore wind farms were defined as collisions, entanglements, and snags. In addition, the risk factors that cause these risks were classified into three upper risk factors and ten sub risk factors, and the three alternatives to gillnet fishing available within the floating OWF were classified and a hierarchy was established. Lastly, a survey was conducted targeting fisheries and marine experts and the response results were analyzed. As a result of the analysis, among the top risk factors, the risk was the greatest when laying fishing gear. The risk of the sub factors for each upper risk was found to be the highest at the berthing (mooring), the final hauling of fishing net, and the laying of the bottom layer net. Based on the alternatives, the average of the integrated risk rankings showed that allowing full navigation/fisheries had the highest risk. As a result of the final ranking analysis of the integrated risk, the overall ranking of allowing navigation/fisheries in areas where bottom layer nets were laid was ranked the first when moving vessels within the floating OWF was analyzed as the lowest integrated risk ranking of the 30th at the ban on navigation/fisheries. Through this, navigation was analyzed to be possible while it was analyzed that the possibility of gillnet fishing within the floating OWF was not high.
Offshore wind energy is gaining more attention. Ensuring proper design of offshore wind turbines and wind farms require knowledge of the external conditions in which the turbines and associated facilities are to operate. In this work, a three-bladed 5MW upwind wind turbine, which is supported by the monopile foundation, is studied by use of fully coupled aero-hydro-servo-elastic commercial simulation tool, 'GH-Bladed'$^{(R)}$. Specification of the structures are chosen from the OC3 (Offshore Code Comparison Collaboration) under "IEA Wind Annex XXIII-subtask2". The primary external conditions due to wind and waves are simulated. Design Load case 5.2 is investigated in this work. The steady state power curve and power production loads are evaluated. Comparison between different codes is made.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.