• 제목/요약/키워드: new construction method

검색결과 2,234건 처리시간 0.032초

비정형 금속패널 설치를 위한 지점 제어 공법 개발 -LH 진주 신사옥 적용을 중심으로- (Method Development of Location Point Control For Freeform Metal Panel Installation - Focused on the Application of LH JinJu New Office-)

  • 김성진;김충식;류한국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.258-259
    • /
    • 2013
  • Recently, architectural design has been changing from formal design to freeform design due to the digitalization of construction industry. Especially, the formal design has been accepted as a design trend recently and applied many times as a design concept in the architectural design competitions such as turn-key. However, various deflects such as water leak and cracks have been occurred because the traditional construction methods had been applied without any revision or adaptation of the formal construction method for the freeform building construction. Therefore this research proposes location point control method for freeform metal panel installation which is focused on the application of LH JinJu new office.

  • PDF

건설시뮬레이션기법을 이용한 시스템 철골계단 공법의 생산성 분석 (Productivity Analysis of Steel Staircase Systems Utilizing Simulation Method)

  • 이경석;이정훈;김현미;김영석;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.101-104
    • /
    • 2010
  • Development and practical emerging construction technologies has been studied as one of key solution for overcoming these barriers. Many literatures indicated that effective performance evaluation methodologies are demanding for efficient applications of new technologies. This paper presents a performance evaluation methodology using construction simulation technique and introduces studies of two cases where the steel staircase system, as an new technologies was applied and where the conventional method of staircase concrete works. Productivity was measured and calculated by site observation and construction simulations. This results show the quantified influence of new technology to site personnels and assist them to make various decisions for using or not using the technology depending on their own situations.

  • PDF

태국 매해 지역에서의 지속가능한 건축재료 활용연구 - 흙다짐 공법을 중심으로 - (Usage of Indigenous Material for Sustainable Construction at Mae-Hae, Thailand - Focused on Rammed Earth Method -)

  • 김두순;정상모
    • KIEAE Journal
    • /
    • 제13권2호
    • /
    • pp.33-38
    • /
    • 2013
  • Limited resources for construction material in the Mae-Hae region, a remote Northern Thailand, acted as an impetus to introduce a new way for constructing their dwellings. The new construction material brought new construction methodology, namely, using earth and bamboo which are indigenous materials, readily available for them to use. Using indigenous material at Mae-Hae region was most ecological and logical method for establishing sustainable dwellings both in terms of monetary and ecological reasons. Prior to the construction at Mae-Hae, Thailand, series of experimental tests on the strength of rammed earth were performed off site at our university and also brought soil samples from the actual job site at Mae-Hae for detailed soil analysis. Through the tests, integrity of the earth and characteristics of the soil were established to build a small senior citizen center as an example. This appropriate technology is expected to contribute to the sustainable construction at Mae-Hae.

철도하부 가도교 설치에 대한 JES공법 (Joint Element Structure Method on the Subway Box Structure unere Railroad)

  • 피태희;조국환;사공명
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.973-981
    • /
    • 2008
  • This document presents the JES(Joint Element Structure) method that has been adopted for the firs time in our country for the construction of the structure crossing under the railroad without open excavation. Front Jacking Method, Tubular Roof Construction Method, New Tubular Roof Method and Joint Element Structure Method are commonly used for the construction of structures crossing under the railroad. JES Method, frequently used in Japan recently, is a new method to construct the structures crossing under the railroad in a safe manner and in a relatively short period of time by utilizing the steel elements with the joints through which the load in the vertical angle to the axial direction is transferred to the next element. The elements are tied to each other through the joints to form the permanent walls of a Rahmen structure under the road without open excavation and without limitation to the length in a convenient way. Through the case study in the project of a Subway Box Culvert Improvement for the Gyeonguiseon Railroad in front of Yonsei University using the JES Method, the cost and period of construction in various types of soil is investigated compared to the Front Jacking Method. Furthermore, by analyzing the results of instrumentation measurements carried out throughout the construction, comparison between the actual displacement in the ground and the predicted displacement in the design is made to provide the considerations to be counted for the design. In conclusion, comparison in the field of economic feasibility, constructability and safety between the JES Method and Front Jacking Method, which is most frequently adopted in our country at present, is made to present the JES Method as a new alternative for the non-open excavation construction method for the structures crossing under the railway.

  • PDF

철도지하횡단공사 공법의 비용.편익 분석에 관한 연구 (A Study on the Cost-Benefit Analysis for the Construction Method of Underground Railway Crossing)

  • 석종근;신민호;엄기영;김무일
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2006년도 추계학술대회 논문집
    • /
    • pp.407-413
    • /
    • 2006
  • Railways are very important to get stability of railway structure as transportation system carrying a lot of passengers and freight. These days the construction of underground railway crossing such as expansion of new roads, construction of subway and gas pipe is increasing because of economic and social development. But these kinds of construction didn't take into account Cost-benefit analysis of railway which has the most important aspects of railway safety, so the results of construction didn't get a good evaluation. This study adapt Cost-benefit analysis to evaluate the economic validity of underground railway crossing. This study adjust about Cost-benefit analysis of railway part, and analyze the new method and technology of underground railway crossing constructed by Korean National Railroad and Railway Network Authority. Also this study divide between high frequency line and low frequency lineusing B/C, NPV, and IRR analysis. After analysis, B/C ratio method is the most suitable method among B/C, NPV, and IRR analysis method. Therefore this study can express economic benefit quantitatively and decrease the cost by adapting Cost-benefit analysis, and can clearly express the construction feasibility and investment effects of construction of underground railway crossing method.

  • PDF

교량 확폭시 RC 상판 접합부의 휨 피로파괴거동에 관한 실험적 연구 (An Experimental Study on the Flexural Fatigue Fracture Behavior of RC Slab of Widened Bridge)

  • 박영훈;전준창;조병완;장동일
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 1994년도 봄 학술발표회 논문집
    • /
    • pp.13-18
    • /
    • 1994
  • Most widened bridges have been constructed by the joining-construction method that makes new and existing bridge structurally single structure. However, joing-construction method has several problems in design and construction viewpoint. Therefore, this study is conducted in order to investigate structural behavior of widened RC slab and traffic-induced vibration of existing bridge during placing and curing of new concrete by the prototype flexural fatigue test. From the results of this study, it is shown that stress-concentration and slip occur between concrete and reinforcing rod at joint section but the reduction of load carrying capacity and of fatigue strength is negligible according to the traffic-induced vibration as well as the difference of construction method. A reasonable construction method for the bridge widening which takes into account the effects of the traffic-induced vibration and S-N curve for the widened bridge are also proposed.

  • PDF

타워팰리스 III 현장의 첨단 시공 및 엔지니어링 기술 적용사례 (Applied cases of advanced construction & engineering technology at Tower Palace III Project)

  • 왕인수
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.202-213
    • /
    • 2003
  • 타워팰리스 III 현장은 현존하는 국내 건축물로는 가장 높은 초고층 주상복합건물이다. 초고층 현장에는 일반현장과는 다른 시공기술 및 엔지니어링 기술의 적용이 요구되는 바, 타워팰리스 III 현장은 지금까지 축적된 기술을 바탕으로 보다 발전된 시공기술과 엔지니어링 기술, 그리고 공정관리기법을 통하여 마감공사 포함 충 당 13.4일이라는 공사 속도를 달성하였다. 이와 같은 공사를 성공적으로 수행하기 위하여 적용된 첨단 시공기술로 1) 골조공사 및 외벽공사의 3-Day Cycle을 달성하기 위한 여러 가지 공법, 2) 초고층 주거건물의 마감공사 공정관리를 위한 Tact 공정관리 시스템, 3) 현장관리 시스템으로 물류관리 및 정보공유 시스템 등이 적용되었다. 또한 엔지니어링 요소기술로 1) 고유동 무다짐 콘크리트와 국내 최초의 압축강도 $800kgf/cm^{2}$의 초고강도 콘크리트 등의 New Material, 2) 냉각수 순환형 파이프쿨링 시스템 등의 New Method, 3) Smart Fan Control 주방환기 시스템을 포함한 Mechanical System 4) False Car System을 포함한 Electrical System 등이 있다.

  • PDF

안내궤도를 이용한 고무차륜 경량전철 AGT 궤도부설공법 (Method for Constructing a Railway by using a Guide-way for a Rubber-wheeled automated Transit System)

  • 강남훈;이안호;이일화;김창환
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.1793-1798
    • /
    • 2011
  • The railway structure for a rubber-wheeled automated guide-way transit system consists of a driveway and a guide-way. The most important factor of this system is the driveway and the guide-way aligned with each other, especially for curves and inclines section. The conventional construction method caused many problems such as discordancy by constructing the driveway before constructing the guide-way. Therefore, in this paper we introduce a new method of constructing a railway for a rubber-wheeled light rail vehicle; the new method of constructing the guide-way beforehand as a preceding process. The new method for AGT railway system can simplify the construction process and thus the construction costs may be reduced. It should also improve the driving performance and the comfortability in operating of a light rail vehicle.

  • PDF

강관압입후 슬롯 홀을 갖는 비개착 터널공법의 현장적용에 관한 연구 (A Study on Sites Application of Non-open-cut Tunnel Method with Slot Holes in Steel Pipe Pumping)

  • 채영석;송관권;민인기
    • 한국안전학회지
    • /
    • 제30권1호
    • /
    • pp.47-51
    • /
    • 2015
  • In the study, a new non-open cut tunnel steel pipe method using slot hole has been developed. As is overcomes shortcomings of conventional methods, it is applied to the field. The main concept of the new method is the steel pipe pumping system with slot holes which, by means of formation slot holes between each steel pipe, applied to the magnitude of the relaxed earth pressure caused by excavation to the ground to prevent ground displacement. The stability of the support members and effect of displacement control of the new method were verified through several ways as numerical analysis and site test. The new method was applied to the construction of a 11.5m wide, 7.4m high and 50m long section that passes side subway and large buildings in inner city. By applying the new method, tunnel construction was successfully completed in 6 months. It decreases the construction period to 30% compared to that of conventional methods, and ground was almost negligible.

A new geophysical exploration method based on electrical resistivity to detect underground utility lines and geological anomalies: Theory and field demonstrations

  • Jo, Seon-Ah;Kim, Kyoung-Yul;Ryu, Hee-Hwan
    • Geomechanics and Engineering
    • /
    • 제18권5호
    • /
    • pp.527-534
    • /
    • 2019
  • Although ground investigation had carried out prior to the construction, many problems have arisen during the civil-engineering works because of the presence of the unexpected underground utility lines or anomalies. In this study, a new geophysical exploration method was developed to solve those problems by improving and supplementing the existing methods. This new method was based on the difference of electrical resistance values between anomalies and surrounding ground medium. A theoretical expression was suggested to define the characteristics of the anomalies such as location, size and direction, by applying the electric field analysis. An inverse analysis algorithm was also developed to solve the theoretical expression using the measured electrical resistance values which were generated by the voltage flowing the subsurface medium. To verify the developed method, field applications were conducted at the sites under construction or planned. From the results of the field tests, it was found that not only the new method was more predictive than the existing methods, but its results were good agreed with the measured ones. Therefore, it is expected that application of the new exploration method reduces the unexpected accidents caused by the underground uncertainties during the underground construction works.