• Title/Summary/Keyword: national investment cost

Search Result 339, Processing Time 0.028 seconds

Analysis of Investment Effect on the Outdoor Swimming Pool Utilizing Reservoir's Amenity Resources (저수지 경관자원을 활용한 야외수영장 개발사업의 투자효과 분석)

  • Kwon, Yong-Dae;Hwang, Jun-Woo
    • Korean Journal of Agricultural Science
    • /
    • v.34 no.1
    • /
    • pp.85-97
    • /
    • 2007
  • This study aimed at analyzing the economic effect of outdoor swimming pool investment using the reservoir's amenity resources. We focused on the identification of the amenity value of reservoir in the rural area and the economic evaluation for establishing This study aimed at analyzing the economic effect of outdoor swimming pool investment using the reservoir's amenity resources. We focused on the identification of the amenity value of reservoir in the rural area and the economic evaluation for establishing infrastructure such as swimming pool based on the reservoir's landscape value. To this end, we have conducted the case study on the outdoor swimming pool in connection with Go-Bok reservoir in Yeon-Gi county, Chungnam Province and estimated its income effect on the rural community by cost-benefit analysis method. The research results are as follows; 1) Outdoor swimming pool participants, with 11,581 visitors totaled to Yeon-gi county every year, was estimated to spend the worth of 58,446 thousand won paid for the agricultural product purchase and etc. 2) Internal rate return of the outdoor swimming pool project was estimated to 16.19%, which considered to be economically feasible comparing with 10% of current capital opportunity cost. Based on the results of this study, we suggest the following strategies for development of amenity value of swimming pool in connected with the reservoir; 1) Reservoir amenities should be well preserved even after construction of swimming pool lest losing amenity values while managing the facilities. 2) Measures to increase the marketing value of intangible reservoir's amenities through promotion should be established. 3) Effective program for more visitors with longer staying and more agricultural products sales should be designed.

  • PDF

Analysis of Efficient Investment for Apartment Gang Form Work by FTA Technique (FTA 기법을 이용한 아파트 갱폼작업의 효율성 분석)

  • Son, Ki-Sang;Kim, Si-Ok
    • Journal of the Korean Society of Safety
    • /
    • v.17 no.1
    • /
    • pp.87-93
    • /
    • 2002
  • In this thesis using FTA technique, the author proposes a new method of analysis of some accidents in construction work. Some efficient plans of safe facility investment are made out. For this study, I referred to 'The Death Accident in Construction Works', which have been published by Korea Industrial Safety Corporation from 1993 to 1999 for 6 years. I selected some of apartment constructions which have caused many deaths for the purpose of analysis in the study. I found that the concrete work using ferro-deck takes more deaths than the conventional construction. After finding this, I selected GANG FORM works using ferro-concrete which is the most widely used but causes many accidents. On the basis of the classification, I try to do some quantitative analyses by adding the death frequency and material factors. In order to draw up the most efficient investment plan, it is imperative that FT diagram be made out and that factors. In order to draw up the most efficient investment plan, it is imperative that FT diagram be made out and that minimal Cut Set be needed. It requires a great deal to labor and time to get Minimal Cut Set. The Minimal Cut Set which is formed of these process is the main factor to analyze disaster in the work. It is desirable that we add calculated percentage of accidents to these factors to these factors in value order, that is to say, from the high cost to low cost.

A Study on the Development of Marine Turbocharger Nozzle Ring using Investment Casting (인베스트먼트법을 이용한 선박용 대형 터보차져 노즐링 개발을 위한 연구)

  • Hwang, Seong Ju;Lee, Man Gil;Jung, Jin Wook;Kwon, Soon Kook;Lee, Choon Man
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.31 no.8
    • /
    • pp.671-675
    • /
    • 2014
  • Nozzle ring is an important part of turbocharger which is applied to today's most diesel engines. Turbo charger nozzle ring is difficult to process and takes a high cost and a long time relatively. For this reason, it is largely produced by using a precision casting. Investment method, the representative technology of precision casting, has excellent dimensional accuracy and can produce complex shapes relatively easily. However, it is difficult to avoid the casting defects such as shrinkage cavity and short shot. This study is to predict the casting defects which could be occurred during the investment method by use of finite element analysis software and to design the process and mold of the marine turbocharger nozzle ring.

An Analysis of the Uncertainty Factors for the Life Cycle Cost of Light Railroad Transit (경량전철 교량 LCC분석을 위한 불확실성 인자 분석)

  • Won, Seo-Kyung;Lee, Du-Heon;Kim, Kyoon-Tai;Kim, Hyun-Bae;Jun, Jin-Taek;Han, Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.396-400
    • /
    • 2007
  • Various ways of automated guideway transit construction are being planned recently owing to the policies of the national government and local municipalities as well as increasing investment from the private sector. Particularly, the increase in the private investment is increasing greatly in SOC (Social Overhead Cost). This trend of promoting private sector investment must be conducted on the basis of a thorough analysis of the economic feasibility of the project from the government and construction companies in the private sector. In other words, an accurate cost analysis of initial investment cost (Construction cost), maintenance/repair cost, profit making through the operation of the concerned facilities, cost of dissolution, etc. in terms of the life cycle is very much in need. Nevertheless, the analysis of uncertainty factors and its probabilistic theory are in need of development so that they can be used in the analysis of the economic feasibility of a construction project. First of all, the actual studies on maintenance/repair cost of automated guideway transit are scarce as of yet, prohibiting an accurate computation of the cost and its economic analysis. Accordingly, this study focused on the uncertainty analysis of the economic feasibility for civil engineering structures among automated guideway transit construction projects based on the rapidly increasing investment on such structures from the private sector. For this research purpose, a cost classification system for the automated guideway transit is proposed, first of all, and the data On the cost cycle of the civil structure facilities and their unit cost are collected and analyzed. Then, the uncertainty in the cost is analyzed from the perspective of LCC. In consideration of the current status with almost no. studies on maintenance/repair of such facilities, it is expected that the cost classification system and the uncertainty analysis technique proposed in this study will greatly enhance LCC analysis and economic feasibility studies for automated guideway transit projects in the future.

  • PDF

Development of a Tractor Attached TMR Mixer(III) -Cost analysis- (트랙터 견인형 TMR 배합기의 개발(III) -경제성 분석-)

  • Park, K. K.;Kim, H. J.;Seo, S. H.;Nah, K. D.;Hong, D. H.;Jang, C.;Ha, Y. S.;Lee, J. S.
    • Journal of Biosystems Engineering
    • /
    • v.25 no.4
    • /
    • pp.265-272
    • /
    • 2000
  • Feasibility of the self-TMR mixing/feeding system for dairy farm in Korea was analyzed by comparing with a traditional feeding system. The total operating cost of self-TMR feeding system decreased with an increase of farm size. However, the cost was higher than that of traditional feeding system because of its high purchasing cost of TMR mixer as an initial investment. Profit per unit input of the TMR feeding system became greater over the traditional system when the farm size is larger than 17 heads due to more and better milk production. The profitable discrepancy became bigger as dairy farm size increases.

  • PDF

Improvement Plan for Cash Receipt System

  • Kim, Ki Beom;Woo, Hyung Rok
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.14 no.3
    • /
    • pp.243-248
    • /
    • 2022
  • Considering the current situation where cash transactions account for 51.5% of private consumption expenditure, it is very important to secure a tax base by exposing business operators' cash transactions. In the September 2011 national audit, it was pointed out that although a significant part of the investment amount of businesses (VAN operators, etc.) related to the issuance of cash receipts has been recovered, they are still supported through the state tax. At this point in time when a significant amount of the initial investment has been recovered, it is necessary to study a new way to support business operators through methods other than the tax credit method. This study proposes various methods to improve the current cash receipt system and describes the advantages and disadvantages of each method. The most important thing for the improvement of the cash receipt system is that the issuance of cash receipts should be beneficial to business operators. As a result of this study, the most desirable improvement method is to provide differential compensation for the discriminatory cost because the cost is different for each cash receipt operator. For this purpose, we analyze the best way to improve the cash receipt system is a tax credit method and a tax credit for maintenance costs.

Survey of Corrosion Cost in China and Preventive Strategies

  • Ke, Wei;Li, Zhiqiang
    • Corrosion Science and Technology
    • /
    • v.7 no.5
    • /
    • pp.259-264
    • /
    • 2008
  • A national consultative project entitled "corrosion cost survey in China and preventive strategies" was funded by the Chinese Academy of Engineering in 1998. Soon afterwards, an expert group was organized jointly by the Institute of Metal Research, CAS and Chinese Society of Corrosion and Protection. The report on corrosion cost survey in China was published in 2003. According to this report the overall annual corrosion cost in China estimated by the Uhlig Method and Hoar Method at 1997-2001 was found to be 200.7 billion Yuan RMB and 228.8 billion Yuan RMB respectively, which is equivalent to 2% of the gross national product of China. However the total cost of corrosion including the direct and indirect cost was estimated to be more than 500 billion Yuan RMB per year in China. Among them, corrosion cost of infrastructure ranked in first comparing with other sectors. Although corrosion costs in some sectors, such as electric power, petrochemical, oil pipeline and railway in China has reduced in the past years, significant losses are still being encountered in most sectors of industries and cost-effective methods have not always been implemented. Both successful and unsuccessful cases in corrosion control and corrosion management were collected. As the investment in capital construction continues increasing rapidly in China, the maintenance and life extension of the infrastructures will become a big issue. The preventive strategies have been suggested

An Empirical Analysis of Fixed Asset Investment Smoothing Effects of Working Capital (운전자본의 고정자산투자 스무딩효과의 실증적 분석)

  • Shin, Min-Shik;Kim, Soo-Eun;Kim, Gong-Young
    • The Korean Journal of Financial Management
    • /
    • v.25 no.4
    • /
    • pp.25-51
    • /
    • 2008
  • In this paper, we analyse empirically the fixed asset investment smoothing of working capital of firms listed on Korea Securities Market. The main results of this study can be summarized as follows. Firms will seek to lower long-term cost by smoothing fixed asset investment and maintaining stationary investment with working capital. Working capital is not only an important use of fund, but also a source of liquidity that should be used to smooth fixed asset investment relative to cash flow shocks if firms face financial constraints. Working capital investment is more sensitive than fixed asset investment to cash flow fluctuations. If firms face financial constraints, working capital investment will compete with fixed asset investment for the limited pool of available cash flows. So, fixed asset investment will have negative relationship with working capital investment. However, criticism that the positive correlation between cash flows and fixed asset investment could arise simply because cash flows is proxy variable for investment demand. Finally, controlling for the fixed asset investment smoothing effects of working capital results in a much larger estimate of the long run impact of financial constraints. Financial constraints is measured by dividend payout ratio and market access level. Fazzari et al. (1988), Fazzari and Petersen (1993), and Faulkender et al. (2008) emphasize that low dividend firms or market unaccessible firms are more likely to face financial constraints, and rarely make use of new equity issuing. The results from empirical analysis show that financial constraints can be better explained using 'adjustment cost' concept. Specifically, the results show that financial constraints exist and that in order to measure financial constraint effects more succinctly, fixed asset investment smoothing effects with working capital should be considered.

  • PDF

Heuristic Rules and Automation for Optimal Design of Distillation Column (증류탑 최적 설계를 위한 경험 법칙 제시 및 자동화)

  • Chae, Hyunyeob;Lee, Jongmin;Jung, Kwangseop
    • Korean Chemical Engineering Research
    • /
    • v.58 no.4
    • /
    • pp.550-564
    • /
    • 2020
  • Distillation columns are one of the main equipment used for the separation of chemical components in petrochemical process design. However, in spite of the efficient operation in wide range, and the advantage of data collection for equipment verification, the distillation columns are inherently known for high energy consumption and capital cost. Hence, the trade-off analysis needs to be done between investment cost and operation cost to develop the most economical distillation columns. This study was conducted using Aspen Plus, a popular process simulation program, in the pursuit of broad application by as many process engineers as possible. In this paper, design variables for optimization of distillation columns were defined to improve emphatically the design quality with reducing erratic practice of many engineers. In addition, by eliminating unnecessary reviewing step and establishing systematic and efficient procedures, the amount of time for design and human resources were minimized. Aspen Process Economic Analyzers (APEA) program was introduced in order to calculate the investment cost reliably, and the efficient systematic procedure for utilization of APEA was established.

A study on improvement of Investment Incentive Acts for Attracting Companies in Gangwon (강원지역 기업유치 활성화를 위한 지원제도의 개선방안에 관한 연구)

  • Park, Kon-Young;La, Kong-Woo
    • International Commerce and Information Review
    • /
    • v.17 no.1
    • /
    • pp.115-134
    • /
    • 2015
  • Stable economic growth and job creation through the attracting companies is a major challenge for local governments. Companies are asked to select a place to invest and finally considering the conditions. Local governments will take advantage of a variety of incentives to attract companies the means to overcome the unfavorable position relative to conditions. Investment incentives should be applied differently depending on the investment objective, investment, corporate investment period. However, Local governments has developed a similar promotion activities through support under the same legal system. This does not result in a substantial investment activities. In this study, we derive the Introduction of differentiated support system for Gangwon Province. In particular, logistics and waste water treatment cost support, upward adjustment of training subsidies were looking for concrete improvements in the investment support system.

  • PDF