Proceedings of the Korean Geotechical Society Conference
/
2005.03a
/
pp.113-120
/
2005
Soil nailing system can be mentioned to a method of supporting as the shear strength of in-situ soils is increased by passive inclusions. In the general soil nailing system, facing walls are used in two kind of a lattice concrete block or a cast in placed concrete wall. A case of lattice concrete blocks is used in slow slopes greater than 1:0.7. Also, a case of a cast in placed concrete wall is used in steep slopes less than 1:0.5. The cast in placed concrete walls are constructed to 30cm thick together with a shotcrete facing. In this study, the assembling soil nailing method as a new soil nailing system is proposed. This method is constructed assembly using precast concrete panels. Therefore ability of the construction and quality of the facings can be modified than a usual soil nailing system. Also, this method can be obtained the effects that a global slope stability increase, as precast concrete panels is put on cutting face after excavating a slope.
KSCE Journal of Civil and Environmental Engineering Research
/
v.26
no.6C
/
pp.385-393
/
2006
Soil nailing is a reinforcement method used for stabilizing excavated walls or slopes. Due to its much advantages such as ease of construction and economical efficiency, use of soil nailing is increased. However, the soil nail has much disadvantages for use in urban area. The soil nail needs to be installed inevitably beyond private land boundary, which causes rent for use. For this reason, removable soil nailing system was developed. However, the removal rate of this system is just about 50¢¦70%. To resolve this problem, the Fiber Reinforced Plastic (FRP) soil nailing system which does not need to be removed and allows for the installation beyond private land, is developed. In this paper, through theoretical and experimental studies in laboratory and field such as prototype tests, pullout tests, we evaluate the stability and behavior characteristics of the FRP soil nailing system. And, numerical analyses using FLAC2D were performed with respect to various soil conditions, where prototype test for excavation wall and pullout tests were carried out. As a result of this study, the FRP soil nailing systems show similar behavior characteristics with those of removable soil nailing system. Finally, considering the serviceability and mechanical stability of FRP soil nailing systems, it is enough to be used as a good alternative of general soil nailing system.
This research is an experimental work of investigating the behavior of soil nailing system under surcharges whereas most of them were concentrated on evaluating its capacity under selfweight of excavated ground. Model tests in laboratory were performed to investigate the ultimate bearing capacity of soil nailing system under surcharges in forms of strip loading. Tests were carried out to find parameters controlling its capacity such as length of nail, vertical and horizontal spacings between nails, inclination of nail installation, and loading position of surcharges. Failure mechanism of forming failure line due to surcharge to soil nailing system was also observed by using dyed sand and monitoring its behavior. From results of these test, effects of parameters was analyzed qualitatively. Thus, this experimental results could provide meaningful data to analyze and design this system later.
Park, Si-Sam;Park, Joo-Suck;Kim, Eung-Soo;Yoon, Myung-June;Park, Ji-Woong;Kim, Hong-Taek
Proceedings of the Korean Geotechical Society Conference
/
2010.09a
/
pp.1081-1086
/
2010
The general soil nailing support system may result in excessive deformations particularly in an excavation zone of the existing weak subsoils. Pretensioning the soil nails then, could play important roles to reduce deformations mainly in part of the nailed-soil excavation system as well as to improve local stability. Morever, soil nails are installed underneath roads, underground structures, and subway structures, thereby resulting in difficulties in nail remval after completion of temporary soil nailed walls. Hence, to date, in order to solve the technical difficulties and avoid legal issues related to the construction of soil nails underneath the surrounding areas and structures, the removable soil nailing system has been developed and used. But, Therefore, a new soil nailing technique called Removable Post-tensioned Soil Nailing(RPTN) system has been developed in the current study. In this study, an investigation of the RPTN system has been conducted by carrying out field measurement. Hence, the RPTN system can reduce ground displacement and enhance stability of the soil nailed walls.
In this study, a newly modified soil nailing technology named as the PGSN (Pressurized Grouting Soil Nailing) system is proposed. Effects of various factors related to the design of the pressurized grouting soil nailing system, such as the length of re-bars and type of reinforcement materials, were examined throughout a series of the displacement-controlled field pull-out tests. 9 displacement-controlled field pull-out tests were performed and the ratio of injected grout volume to grout hole volume were also evaluated based on the measurements. In addition, short-term characteristics of pull-out deformations of the newly proposed PGSN system were analyzed and compared with those of the ordinary soil nailing system by carrying out field pull-out tests. The test results were shown that the displacements of pressurized grouting soil nailing system were decreased 30~36% in comparison with using gravity grouting soil nailing system by the pressurized effect. The displacements of steel tube were diminished 31~32% comparison with using deformed bar by the reinforcement type change from the field pull-out tests.
Park, Si-Sam;Han, Yeon-Jin;Heo, Seong-Jun;Yoon, Myung-June;Kim, Hong-Taek;Park, Ju-Seok
Proceedings of the Korean Geotechical Society Conference
/
2009.09a
/
pp.1330-1333
/
2009
The soil nailing method had used in variable construction field because of construction convenience and reinforcement effect. Especially, the removal soil nailing method is useful support system in vertical excavation. In this study, to develop the wedge type removable soil nailing method for improvement of the removal soil nailing method. Because of the reinforcement materials is most important in soil nailing method, to evaluate the mechanical characteristics during laboratory strength test in this study. To conduct bond strength test of deformed bar combined with a wedged screw inside plastic fixed socket for evaluate the strength characteristics of wedge type removable soil nailing method and evaluate the strength characteristics of fixed socket based on laboratory tests.
Kim, Hong-Taek;Park, Si-Sam;Park, Sung-Chul;Jung, Sung-Pill
Proceedings of the Korean Geotechical Society Conference
/
2004.03b
/
pp.651-658
/
2004
In this study, we introduced the spiral pipe nailing system (refer as SPN system) with self drilling method, can apply to ground which is hard to keep shape of bore hole, and performed limit equilibrium analysis with simplilied trial wedge method while length ratio and bond ratio were altered to evaluate slope stability considered of tensile strength and bending stiffness. A newly soil nailing system named as the SPN system is respected to reduce displacement of nail and increase global slope stability. And effects of various factors related to the design of the SPN system, such as the type of drilling method and the bit, are examined throughout a series of the displacement-controlled field pull-out tests. 6 displacement-controlled field pull-out tests are performed in the present study and the volume of grouting arc also evaluated based on the measurements. In addition, short-term characteristics of pull-out deformations of the newly proposed SPN system are analyzed and compared with those of the general soil nailing system by carrying out the displacement-controlled field pull-out tests.
In this study, a newly modified soil nailing technology using bamboo is developed. And field tests were performed to confirm applicability of bamboo soil nailing system. For the practical use of bamboo soil nailing system, laboratory tests, field instrumentations and pullout tests were also performed to investigate the applicability. The results of field measurement through field tests were compared with the results of numerical analyses for verifying the field construction. As a result, the results of comparing with the field measurement and numerical analyses shows the similar behavior characteristics. Based on this study, applicability for bamboo soil nailing systems were confirmed for the case of comparatively low scale nailed-soil excavation wall. And it is expected that the bamboo soil nailing system can be used as satisfactory reinforcement technique taking the place of existing steel reinforcement soil nailing system. Hereafter, it needed the research for the applicability for the various types of excavation condition, also the active practical application of bamboo soil nailing system is needed.
Park, Si-Sam;Cho, Sung-Han;Yoo, Chan-Ho;Kim, Hong-Taek;Kim, Yong-Yeon
Proceedings of the Korean Geotechical Society Conference
/
2006.03a
/
pp.1038-1045
/
2006
The Green Wall is highest eco-system among a segmental retaining wall systems. Recently, the demand of high segmental retaining wall (SRW) is increased in domestic. The soil nailing system is applied in order to maintain the high SRW stability for steeper slope. However, the proper design approach that can consider the earth pressure reduction effects in soil nailing system has not been proposed. This study was performed to introduce the design case by 'Two-Body Translation mechanism' to be able to consider distribution of earth pressure in the soil nailing when designing the green wall using soil nailing system. Also, this study attempts to evaluate the earth pressure change when advanced soil nailing system is constructed using $FLAC^{2D}$ ver. 3.30 program and 'Two-Body Translation mechanism'. Also in this study, various parametric studies using numerical methods as shear strength reduction (SSR) technique and limit equilibrium technique were carried out. In the parametric study, the length ratio and the bond ratio of the soil nailing were changed to identify the earth pressure reduction effect of the retaining wall reinforced by soil nailing.
Kim, Hong-Taek;Park, Si-Sam;Cho, Byeong-Guk;Jung, Sung-Pil
Proceedings of the Korean Geotechical Society Conference
/
2004.03b
/
pp.342-347
/
2004
Excavation nearby the existing structures is being performed vigorously to get the greatest use of land along with fast economic growth in the downtown area. The application of soil nailing system gradually increases because of an advantage of soil nailing system adjacently constructed in the existing structures. In this study, friction resistance by pull-out is considered as main resistance except resistance formed by flexural rigidity of nail observing that resistance of flexural rigidity is about $0{\sim}15\;%$ of whole safety factor according to degree of flexural rigidity in general soil nail wall and application of geosynthetic fiber soil nailing system is evaluated through laboratory tensile strength test and field pull-out test.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.