• 제목/요약/키워드: module arrangement

검색결과 88건 처리시간 0.024초

열전모듈 냉방기에서 열전모듈의 개수 및 전원배열이 시스템의 성능에 미치는 영향 (Effects of Thermoelectric Module Arrangement on the Performance of a Thermoelectric Air-Cooling System)

  • 황준;강병하
    • 설비공학논문집
    • /
    • 제19권2호
    • /
    • pp.162-168
    • /
    • 2007
  • This paper presents the effects of thermoelectric module arrangement on the cooling performance of an air conditioner using thermoelectric module. A prototype of air cooling system, employing several thermoelectric modules, has been designed and built. The evaporative cooling technique is adopted for hot side of the module. The number of thermoelectric module in the system has been varied in the range of $2{\sim}8$. The optimal operation conditions, such as input power to the thermoelectric module, fans and pump, have been determined for each arrangement of the system and the cooling performance has been compared under the optimal operation. It is found that both cooling capacity and COP are increased as the number of thermoelectric module increased. It is also found that cooling capacity can be improved by connecting the thermoelectric modules in series than in parallel, while the COP is little affected.

태양전지모듈 제조를 위한 요소기술연구 (A Study on the Element Technology for PV Module Manufacturing)

  • 김기환;유권종;박경은;한득영;안형근
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 B
    • /
    • pp.1365-1367
    • /
    • 2003
  • In this paper, element technologies such as soldering. arrangement and lamination processes for photovoltaic module manufacture were examined and described as main processes. Especially solder paste and temperature condition in soldering process, loss factor in arrangement process and process conditions in lamination process are investigated to minimize the electrical loss. As a results, temperature condition in soldering process was found to be critical to contact resistance of electrode and life-time. Productivity of the process decreases dramatically by physical damage during arrangement process. Pressure level and press condition of upper chamber in lamination process were important parameters for the reliability. According to the test result of photovoltaic module, electrical properties dropped about $5{\sim}25%$ after 5 years.

  • PDF

선실 PE장 정반배치 계획수립 시스템 개발 (Development of the Pre-erection Block Arrangement System for Deckhouse)

  • 하승진;김지온;최태훈
    • 대한조선학회 특별논문집
    • /
    • 대한조선학회 2007년도 특별논문집
    • /
    • pp.79-88
    • /
    • 2007
  • In this study, we improved the layout of deckhouse pre-erection area where erects the blocks and developed the pre-erection block arrangement system for the improvement of productivity and effectiveness. The major operating point of the pre-erection area is to fabricate as many as possible that has restrict area and working plate. The developed system has information management module, scheduling module, schedule control module, statistics module, and information integrate module. The heuristic algorithm is issued and evaluated with real data. And genetic algorithm is used for the evaluation of issued it.

  • PDF

해양 라이저의 부력재 최적 배치를 위한 시뮬레이션 기반 설계 기법에 관한 연구 (A Study on the Simulation-based Design for Optimum Arrangement of Buoyancy Modules in Marine Riser System)

  • 오재원;박상현;민천홍;조수길;홍섭;배대성;김형우
    • 한국해양공학회지
    • /
    • 제30권1호
    • /
    • pp.10-17
    • /
    • 2016
  • This paper reports a simulation-based design method for the optimized arrangement design of buoyancy modules in a marine riser system. A buoyancy module is used for the safe operation and structural stability of the riser. Engineers design buoyancy modules based on experience and experimental data. However, they are difficult to design because of the difficulty of conducting real sea experiments and quantifying the data. Therefore, a simulation-based design method is needed to tackle this problem. In this study, we developed a simulation-based design algorithm using a multi-body dynamic simulation and genetic algorithm to perform optimization arrangement design of a buoyancy module. The design results are discussed in this paper.

TRNSYS를 이용한 지역별 고정형 태양광모듈 배치안 검토 (A Study on the Optimum Selection of Placing Photovoltaic Module In the Metropolitan City Using a TRNSYS)

  • 박성현;서장후
    • 한국태양에너지학회:학술대회논문집
    • /
    • 한국태양에너지학회 2011년도 추계학술발표대회 논문집
    • /
    • pp.297-302
    • /
    • 2011
  • In this study, used Trnsys and will apply metropolitan city distinguishes, fixations and BIPV systems the photovoltaic module arrangement environment which receives solar radiation quantity plentifully from the case design process which and most the outcome value simulation did analyzed. The climate data uses each metropolitan city distinguishes 20 average weather data, With measured values of horizontal solar radiation. The error scope appeared with 0.1%~6.7%. Variable of module arrangement Azimuth and angle of inclination of module and comparison group Module on due south direction angle of inclination $45^{\circ}$ day time set with the yearly average solar radiation quantity which receives. The result When the case comparison group which arranges a solar storehouse module with optimum environment and comparing until the minimum 1.4% - maximum 10.9% the solar radiation quantity difference appears with the thing, metropolitan city distinguishes considers the case solar radiation quantity which will arrange a photovoltaic module and that must establish with optimum environment judges.

  • PDF

자동배열장치를 이용한 태양전지모듈 제조 공정 개발 (Development of PV Module Process Using Automatic Arrangement Tool)

  • 강기환;유권종;안형근;한득영
    • 한국태양에너지학회 논문집
    • /
    • 제23권4호
    • /
    • pp.1-9
    • /
    • 2003
  • In this study, a manufacturing process for PV module has been developed using an automatic arraying equipment. It is expected that this process could improve the productivity and curtail the production cost in the photovoltaic module production line. From the results, it is proved that this process reduces Line-stop and enhances the productivity more than 15% a day which can be related directly to the production line cost.

합성 PC 부재 현장생산배치에 관한 기초 연구 (A Basic Study on the Arrangement of In-situ Production Module of the Composite PC Members)

  • 이군재;주진규;이성호;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.29-30
    • /
    • 2011
  • A Green Frame is a composite Rahmen precast concrete structure that utilizes the advantages of the steel frame and the reinforced concrete. Compared to bearing wall structure, the precast concrete structure may raise construction cost If the precast concrete members are produced in plant. Thus, if the precast concrete members can be produced in site, the cost-effectiveness and quality shall be increased. Various site conditions must be considered and reviewed to ensure a space for the in-situ production. Therefore, this study focuses on the basic study on the arrangement of in-situ production module of composite precast concrete members.

  • PDF

조선 도장 공장 운영 방안 수립에 관한 연구

  • 최동희;박주철
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 2001년도 추계학술대회 논문집
    • /
    • pp.286-289
    • /
    • 2001
  • This paper deals with the procedures of effective mid-term Operation Planning establishment for painting shop in shipbuilding. and develop prototype system. In general, the block painting process consists of two stages such as blasting operation for surface preparation and painting operation for paint application for blocks. Weather condition is a potent Influence on those operations. The procedures consists of four steps, Load analysis, Generate alternative simulation plan. Implementation of Allocation automation module and Compare result of each simulation plan. Explain of each step. as follows, 1.step, Load analysis measure amount of assigned workload and manhour. 2.step, simulation scheme include alterable control variable such as overtime, weather. Auto allocating module carry out feasibility of simulation plan. 3.step, Allocation automation module are composed of three algorithms, as followings: - the block allocation algorithm that determines the number of blocks to be processed each day, - the team allocation algorithm that allocates blocks to worker groups. - the block arrangement algorithm that arrange blocks in blasting and painting cells. Since the block arrangement algorithm is conducted simultaneously with the team allocation algorithm, the total structure of the operating algorithms is considered to have two phases: first, daily load balancing with capacity limit and second, team allocation considering arrangement each day 4 step, Comparing result of each simulation plan. and select best simulation plan.

  • PDF

공기식 태양광/열 시스템 공기채널 내 여러 저항체 설치에 따른 전열성능에 관한 CFD 해석 (CFD Analysis on the Heat Transfer Performance with Various Obstacles in Air Channel of Air-Type PV/Thermal Module)

  • 최휘웅;파쿠르 로커만;김영복;윤정인;손창효;최광환
    • 한국태양에너지학회 논문집
    • /
    • 제38권2호
    • /
    • pp.33-43
    • /
    • 2018
  • PV/Thermal module is the combined system, which consist of a photovoltaic module and solar thermal collector that can obtain electrical power and thermal energy simultaneously. Thus the power generation can be increase by decreasing the temperature of photovoltaic module and thermal energy retrieved from module also can be used for heating system. In this study, Heat transfer performance of air type PV/Thermal module was confirmed with various bottom obstacles that can be installed easily to real photovoltaic module by CFD (computational fluid dynamics) analysis. Eight type obstacles were investigated according to the shape and arrangement. As a result, nusselt number represent heat transfer performance was increased about 86% compare with the basic type PV/Tthermal module that has no obstacle and triangle type obstacle had higher value than other types. But pressure drop was also increased with increment of heat transfer enhancement. Thus the performance factor considering both heat transfer and pressure drop was confirmed and V-fin type obstacle arranged in a row for Reynolds number below 9,600 and protrusion type obstacle arranged in zigzag for Reynolds number above 14,400 were shown higher performance factor than other types. From these results, V-fin type obstacle arranged in row and protrusion type obstacle arranged in zigzag were considered as a proper type for applying to real PV/thermal module according to operating condition. But the heat transfer performance can be changed by the geometric conditions of obstacle such as height, width, length and arrangement. Thus, it could also confirmed that the optimal condition and arrangement of this obstacle need to be found in further study.

객체지향 기법을 이용한 RC통합 구조설계 시스템의 후처리 모듈 개발 (Development of Post-processing Modules in an Integrated System for Reinforced Concrete Structures Using Object-Oriented Techniques)

  • 이진우;천진호;김우범;이병해
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 1998년도 가을 학술발표회 논문집
    • /
    • pp.352-361
    • /
    • 1998
  • The post-processing modules are parts of an integrated system for reinforced concrete structures. This modules are composed of two modules: member design module and calculation report module. The purpose of this paper is to develope modules that increase efficiency and usefulness of an integrated system used reinforced concrete structures design. The development of post-processing modules is necessary for user to design reinforced concrete structures conveniently and quickly. This modules are connected with central database for the benefit of storing amount of input/output data and being used system with little effort. Post-processing modules used Object-Oriented concepts and techniques include identity, classification, polymorphism, and inheritance. Member design module automatically converts no good members into satisfied members by changing section size or reinforcement bar arrangement. This module can be operated both independent member design modules with user input and a part of integrated system with database input. If user operates member design module, calculation report module is created automatically.

  • PDF