• Title/Summary/Keyword: modular building construction

Search Result 192, Processing Time 0.029 seconds

Development of Modular Apartment Unit for Single Person Household Based on BIM (BIM 기반 1인 가구 모듈러 공동주택 유닛 개발)

  • Lee, Si-Hyeon;Yoo, Moo-Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.6
    • /
    • pp.809-820
    • /
    • 2023
  • In contemporary society, there is a notable rise in single-person households, coupled with an increased demand for residential spaces, necessitating the exploration of suitable housing solutions. Modular architecture is gaining prominence as a method to deliver cost-effective and sustainable living spaces efficiently. This study introduces a method for optimizing the design and construction processes of modular building units through Building Information Modeling(BIM) technology. It involves an analysis of factors that enhance living quality and meet the housing needs of single-person households. Utilizing BIM, a resource-efficient and cost-efficient modular apartment unit has been developed. BIM facilitates the visualization and integration of architectural components, thereby reducing design errors and enhancing productivity. This research evaluates both the benefits and constraints of modular architecture. Modular constructions, when combined with BIM, emerge as a potent solution for housing challenges, enriching the quality and variety of residential options. Nevertheless, considerations such as technical prerequisites and financial implications are also discussed. The study showcases the potential and merits of utilizing BIM for designing apartment units tailored to single-person households, offering a viable approach to ameliorate their living conditions.

Behaviour of Multi-Storey Prefabricated Modular Buildings under seismic loads

  • Gunawardena, Tharaka;Ngo, Tuan;Mendis, Priyan
    • Earthquakes and Structures
    • /
    • v.11 no.6
    • /
    • pp.1061-1076
    • /
    • 2016
  • Prefabricated Modular Buildings are increasingly becoming popular in the construction industry as a method to achieve financially economical buildings in a very short construction time. This increasing demand for modular construction has expanded into multi-storey applications where the effect of lateral loads such as seismic loads becomes critical. However, there is a lack of detailed scientific research that has explored the behaviour of modular buildings and their connection systems against seismic loads. This paper will therefore present the nonlinear time history analysis of a multi-storey modular building against several ground motion records. The critical elements that need special attention in designing a modular building in similar seismic conditions is discussed with a deeper explanation of the behaviour of the overall system.

Framework on Database Development based on Modular Simulation Model Implementation for Curtain Wall Operations in High-rise Buildings (초고층 커튼월공사 MSM 구성 및 데이터베이스 구축을 위한 프레임워크)

  • Lee, Tae-Hee;Ko, Yong-Ho;Kim, Tae-Hyung;Shin, Young-Keun;Han, Seungwoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.301-302
    • /
    • 2012
  • Recently, high-rise building projects have been in the spotlight in South Korea. Curtain wall construction, as one of important operations in the high-rise building projects is composed of various, entangled and complex unit processes that require a systematic planning to prevent unexpected delays. A schedule simulation technique has been used for deriving more efficient planning and accurate performance measurement. However, the simulation technique has difficulty in collecting actual data and in applying data fluctuations during construction. Thus, this paper suggests a concept model of Modular Simulation Model(MSM) that overcomes such limitations of traditional simulation technique based on curtain wall operations.

  • PDF

A Study on the Comparison of the Construction Process between the PC Modular Construction Method Using 3D Infill and the Existing Construction Method (3D Infill을 활용한 PC 모듈러공법과 기존공법과의 시공프로세스 비교 연구)

  • Chung, Joon-Soo;Lim, Seok-Ho;Yang, Hyeon-Jeong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.87-88
    • /
    • 2023
  • In accordance with changes in the domestic construction environment, interest in off-site construction methods (factory-manufactured construction methods) including modular construction methods is rapidly increasing. Among various off-site (OSC) construction methods, the front runner is the steel-based box-type modular construction method. Compared to the existing wet construction method, the steel modular construction method is increasing in terms of securing economic feasibility by shortening the construction period and increasing the prefabrication rate. However, due to the recent rise in raw materials and a sharp rise in the exchange rate, the economic feasibility of the wet method is deteriorating compared to the wet method. Therefore, a hybrid between 9-Matrix-based OSC construction methods is considered as a solution, away from the steel-box type combination, and a comparative study of the construction process between each construction method is being conducted. It was analyzed that the PC modular construction method shortened the construction period by 9% compared to the existing steel modular construction method. On the other hand, when comparing the construction period of the Gayang-dong demonstration complex calculated assuming that all modules are applied, it is estimated that there will be a 12% reduction in construction period compared to the steel modular method and a whopping 43% compared to the RC method.

  • PDF

Suggestion of Safety Management Activities and Key Check point for Safety Management in Modular Construction Sites (모듈러 건설현장의 단위작업별 안전관리 활동 및 중점 체크사항 제안)

  • Jun, Young-Hun;Kim, Kyoon-Tai
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.202-203
    • /
    • 2022
  • In this study, focusing on work types of lifting modules and modules assembly in modular construction sites, unit works were defined according to the construction process of each work type, and safety management elements, safety management activities, and key check point were proposed. The results of this study may have somewhat overlapping contents in the construction procedure in order to derive specific safety management activities and check point for each unit work. Therefore, there is a limit to use the results in an actual modular construction site. In future research, we plan to improve this part and derive a checklist that considers field usability.

  • PDF

A Study on the Application of Modular Construction Method for Demand Responsive Dormitory Facilities (수요대응형 기숙사시설을 위한 모듈러공법 적용 방안)

  • Kim, Han Eol;Lim, Hyoung Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.259-260
    • /
    • 2021
  • Currently, the school-age population continues to decline in Korea due to social factors. On the other hand, the dormitory facilities are constantly being built and renovated. There are many problems such as construction period and on-site waste when constructed with reinforced concrete structures, which are existing construction methods. Accordingly, dormitory facilities shall be constructed using appropriate construction methods. Therefore, in this study, we will collect and organize basic data on the use status and modular system of dormitory facilities and study efficient maintenance and management when modular construction method is applied to dormitory facilities with changing demand.

  • PDF

A Case Study on the Application of Modular System to the Superstructure of Floating Architecture in Europe (플로팅 건축 상부시설에서 모듈러 시스템 적용 유럽 사례 연구)

  • Song, Seog-Ki
    • Journal of Navigation and Port Research
    • /
    • v.36 no.10
    • /
    • pp.873-881
    • /
    • 2012
  • This study is about the case study on the application of modular system to the superstructure of floating architecture in Europe. There are many restraints in the onsite construction of floating architecture. Then, various industrialized construction methods are needed to reduce the portion of the onsite construction in floating architecture. Among the various industrialized construction methods, the modular system can be more suitable for floating architecture. At this background, this study analysed the European cases of the application of modular system and classified the types of applied modular system. As a result, this study could classify the three types of modular system, such as, building unit modular, space unit modular and planning concept modular, and define the characteristics of three types by comparing with each other.

An Analysis of BIM uptake in Each Phase of Modular Construction Projects in Korea (국내 모듈러 건축 프로젝트의 단계별 BIM 활용업무 분석)

  • Lee, Ung-Kyun;Lee, Myungdo
    • Journal of the Regional Association of Architectural Institute of Korea
    • /
    • v.21 no.5
    • /
    • pp.133-140
    • /
    • 2019
  • Building Information Modeling (BIM) and modular construction are regarded as important technologies that could contribute to overcoming the crisis faced by the construction industry. However, BIM uptake in current modular construction projects is limited. Moreover, there are no specific guidelines to support decision-making regarding the application of BIM in modular construction projects. Therefore, this study aims to analyze the possibility for BIM uptake in each phase of modular construction projects in Korea. Initially, the literature detailing on BIM uptake cases in modular construction projects was reviewed. The detailed work and activities for each phase of a modular project were analyzed via a questionnaire targeting domestic modular experts, to derive items requiring improvement due to errors or changes occurring in the actual project. Ten realistic BIM uptake items were derived, reflecting the results of literature review and expert interviews. Then, the BIM uptake items in each phase were analyzed in terms of necessity and efficiency via a second questionnaire using five-point Likert scales. Finally, the BIM utilization index (BIM UI) of the BIM uptake items was suggested as a priority measure. As a result, the BIM UI of "3D coordination" (U2), "design authoring and reviews for off-site fabrication" (U3), and "detailed 3D modeling for off-site fabrication" (U4), were assigned the highest priority. The results of this study can be used as guidelines to support decision-making regarding the application of BIM in modular construction projects.

Analysis of BIM Utilization for On-site Construction Planning in Modular Construction Project (모듈러 건축공사의 현장시공계획수립을 위한 BIM 활용성 분석)

  • Lee, Myung-Do
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.3
    • /
    • pp.263-272
    • /
    • 2019
  • Building Information Modeling (BIM) and modular construction are regarded as important technologies that have contributed to advancements in the construction industry. However, the utilization of BIM in current modular construction projects is limited; moreover, there are no specific guidelines pertaining the applications of BIM in modular construction projects. Therefore, this study aims to analyze the utilization of BIM for onsite construction planning in modular construction projects. First, a realistic BIM application was selected through literature review and expert interviews. Then, the construction plan of the modular projects was analyzed to classify the BIM application items into five different categories. The utilization of BIM in each category was then analyzed in terms of necessity and efficiency using a questionnaire. Finally, the BIM Utilization Index (BIM UI) was suggested based on the findings of the survey. As a results, the BIM UI for module point details, lifting plan, other installation details, site layout plan, and schedule plan was 0.811, 0.787, 0.770, 0.729, and 0.699, in the descending order of usability. In addition, through the findings of the study and interviews with experts, a case study for implementation of BIM in modular construction plan was conducted. The results of this study can be used as application guidelines for BIM in future modular construction projects.

A Study on Development of Owner's Standard Specification Structure for Modular Building (모듈러 전문 시방서 개발을 위한 체계 구축)

  • Nam, Sunghoon;Park, Honggeon;Kim, Kyungrai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.12-21
    • /
    • 2019
  • Specification is an important document for securing safe construction and improving quality as well as the contract document. Currently, the specifications used in modular buildings in Korea are only the construction specification, and most of the contents are used by borrowing the standard specifications of the building, so the contents of the modular buildings can not be reflected and it is contents are similar to the guideline book. The current status of domestic specification for modular buildings is affecting the quality of modular buildings. Therefore, we analyze activity through monitoring the modular process of modular buildings and analyze systematically relationship by applying IDEF modeling with analyzed activity. As result this paper proposes a structure of special specification specialized in modular building through generalization. The major classifications were divided into three stages : factory construction, transportation, and on-site installation. The specification structure was divided into 32 types of construction items from the floor slab assembly of the factory production to the joint finish of the on site installation in accordance with the opinion of experts.