Optimal Structure of Wavelet Modular Wavelet Network Systems Using Genetic Algorithm (유전 알고리즘을 이용한 웨이브릿 모듈라 신경망의 최적 구조 설계)

  • 최영준;서재용;연정흠;전홍태
    • Proceedings of the Korean Institute of Intelligent Systems Conference
    • /
    • 2000.11a
    • /
    • pp.115-118
    • /
    • 2000
  • In order to approximate a nonlinear function, modular wavelet networks combining wavelet theory and modular concept based on single layer neural network have been proposed as an alternative to conventional wavelet neural networks and kind of modular network. Modular wavelet networks provide better approximating performance than conventional one. In this paper, we propose an effective method to construct an optimal modualr wavelet network using genetic algorithm. This is verified through experimental results.

  • PDF

Survey on the Market of Modular Building Using ARIMA Model (ARIM모형을 활용한 모듈러 건축시장 현황 조사)

  • Park, Nam-Cheon;Kim, Kyoon-Tai;Lee, Yuril
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.14-15
    • /
    • 2014
  • The modular construction is as yet early stage of market in Korea. So It is have difficulty of market demand forecast of the modular building. Therefore, this study was done analysis for market trends of the modular building using ARIMA(Auto Regressive Integrated Moving Average) model by time series data.

  • PDF

CONSTRUCTION OF CLASS FIELDS OVER IMAGINARY QUADRATIC FIELDS USING y-COORDINATES OF ELLIPTIC CURVES

  • Koo, Ja Kyung;Shin, Dong Hwa
    • Journal of the Korean Mathematical Society
    • /
    • v.50 no.4
    • /
    • pp.847-864
    • /
    • 2013
  • By a change of variables we obtain new $y$-coordinates of elliptic curves. Utilizing these $y$-coordinates as meromorphic modular functions, together with the elliptic modular function, we generate the fields of meromorphic modular functions. Furthermore, by means of the special values of the $y$-coordinates, we construct the ray class fields over imaginary quadratic fields as well as normal bases of these ray class fields.

NOTES ON MODULAR ORDERED SETS

  • Shin, Seon Ho
    • Journal of the Chungcheong Mathematical Society
    • /
    • v.25 no.1
    • /
    • pp.105-113
    • /
    • 2012
  • Generalizing modular lattices, a concept of modular ordered sets was introduced by Chajda and Rachunek. In this paper, we characterize modular ordered sets as those partially ordered set P satisfying that for $a,\;b,\;c\;{\in}\;P\;with\;b\;{\leq}\;c,\;l(a,\;b)\;=\;l(a,\;c)\;and\;u(a,\;b)\;=\;u(a,\;c)$ imply $b\;=\;c$. Using this, we obtain a sufficient condition for them. We also discuss the modularity of the Dedekind-MacNeille completions of ordered sets.

Development of Manufacturing Planning for Multi Modular Construction Project based on Genetic-Algorithm (유전자 알고리즘 기반 다중 모듈러 건축 프로젝트 수행 시 모듈러 유닛 공장생산계획수립 모델 개발)

  • Kim, Minjung;Park, Moonseo;Lee, Hyun-soo;Lee, Jeonghoon;Lee, Kwang-Pyo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.54-64
    • /
    • 2015
  • The modular construction has several advantages such as high quality of product, safe work condition and short construction duration. The manufacturing planning of modular construction should consider time frame of manufacturing, transport and erection process with limited resources (e.g., modular units, transporter and workers). The manufacturing planning of multi modular construction project manages the modular construction's characteristics and diversity of projects, as a type of modular unit, modular unit quantities, and date for delivery. However, current modular manufacturing planning techniques are weak in dealing with resource interactions and each project requirement in multi modular construction project environments. Inefficient allocation of resources during multi modular construction project may cause delays and cost overruns to construction operation. In this circumstance, this research suggest a manufacturing planning model for schedule optimization of multi project of modular construction, using genetic algorithm as one of the powerful method for schedule optimization with multiple constrained resources. Comparing to the result of the existed schedule of case study, setting optimized scheduling for multi project decrease the total factory producing schedule. By using proposed optimization tool, efficient allocation of resource and saving project time is expected.

A Study on Improvement of Modular Specifications - Focused on technical specifying method in waterproof and mechanical works - (모듈러 공사시방서 개선방안에 관한 연구 - 방수 및 기계설비공사의 기술방안 개선을 중심으로 -)

  • Yoon, Jongsik;Shin, Dongwoo;Cha, Heesung;Kim, Kyungrai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.33-41
    • /
    • 2017
  • A modular specification is a contract document that specifies the requirements of production, transformation and installation in a modular construction. A problem of the currently used specification is that it does not guarantee the level of performance required by the modular construction and fails to accommodate unique characteristics of each construction because it widely uses the standard specification as it is. This study proposes a specification that reflects the unique feature of modular construction in order to improve the quality of modular construction. Research focuses on the leakage in waterproof and mechanical equipment because it is the area with the highest rate of defects. This study suggests ways to improve the modular specification as follows: 1)Descriptive specifying (following MasterFormat) 2)Propose leakage verification method and test clause 3) Reflect characteristic of modular construction. Proposed modifications to modular specification are reviewed by experts for validation and their opinion verifies suggested improvements as a way to secure the quality of modular construction and to promise characteristics of the modular specification. This improvement will be used for reference when writing construction project specification, which can be an important contract document, so that it could lower occurrence rate of the modular defects.

Development of BIM Based Information Model Interface Module for a Modular Pier (모듈러 교각의 BIM 기반 정보 모델 인터페이스 모듈 개발)

  • Kim, Dong-Wook;Lee, Kwang-Myong;Nam, Sang-Hyeok
    • Journal of KIBIM
    • /
    • v.5 no.1
    • /
    • pp.1-7
    • /
    • 2015
  • Modular technology has become a major issue of the construction industries to enhance their productivity. Modular bridge construction generally requires the data exchange between the contractors, designers, fabricators and constructors. Therefore, a readily accessible information model interface module based on BIM technology is essential for their communication during a project life-cycle. In this study, BIM based information model interface module for a modular pier was developed. For the information models, the PBS(Product Breakdown Structure) and LOD(Level of Development) were defined. Next, all components of a modular pier were conducted by the parametric modeling technique, and then 3D cell library interface was developed. An nterface module was also developed using VBA(Visua basic Application) for exchanging a data from 3D model library to other softwares such as Microstation, AutoCad and Excel and was connected with MS Access database. The developed information model interface module would improve the design quality of the modular pier and reduce the time and cost for design. Updated 3D information models could be utilized for the fabrication, assembly, and construction process for modular piers.

Study on the Application of Modular Technologies to Han-ok (한옥의 모듈러 공법 적용에 관한 연구)

  • Lee, Chang-Jae;Lim, Seok-Ho
    • Journal of the Korean housing association
    • /
    • v.23 no.4
    • /
    • pp.49-57
    • /
    • 2012
  • This study was conducted to apply the modular construction method to Han-ok. The modular method, which is differentiated from the existing one, means a construction method that equipments, windows and interior materials are prefabricated as a six-sided object at a plant and then they are assembled at the least process on the spot. As for the theoretical observation, the theoretical basis to apply the modular method to the modular housing and Hanok was divided into environmental and economic aspect. In order to apply the modular method to Hanok, the unit scale and size were selected and the plane of unit module Hanok was developed. And a standard with regard to the unit combination and material lifting transportation method was set and planned. In addition, through the comparison the unit modular Hanok to the existing Hanok, the difference was analyzed and the strength was identified in terms fo design method, structure, construction method, period and cost. In final, the conclusion, with regard to the economic, technical application in future, was drawn through arranging the study contents. The unit modular Hanok to carry out the high-quality dwelling through construction period reduction, standardized construction materials and improved insulation performance can meet the demands for a paradigm of new construction technology.