• Title/Summary/Keyword: model building

Search Result 6,108, Processing Time 0.033 seconds

BIM-Based VE Proposal Management Using Parametric Modeling (파라메트릭 모델링을 활용한 BIM기반 VE제안 관리 방안)

  • Kim, Dain;Choi, Jaehyun;Lee, Jin Gang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.163-164
    • /
    • 2023
  • The technical proposal bidding system emphasizes the evaluation of the construction company's technical capabilities, with the aim of improving the quality and cost-effectiveness of the construction. However, in the VE analysis and proposal process for technical proposal bidding, the ideas are often reused from similar past construction projects, and the application of new construction technologies/methods is often lacking. Therefore, this study proposes a methodology for managing VE proposal information by integrating it into a BIM model using parametric modeling. This research developed database based on the existing VE proposals and new construction technology/method information from the Korea Institute of Civil Engineering and Building Technology. And by using parametric modeling, the proposed method integrate the VE database with BIM model. The methodology proposed in this study is expected to improve the reliability and effectiveness of VE-related idea proposals in technical proposal bidding.

  • PDF

Optimization of real-time path finding for material handling of finishing work considering the logistics flow (물류량을 고려한 마감공사 자재운반의 실시간 경로탐색 최적화 연구)

  • Kim, Wansoub;Lee, Dongmin;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.170-171
    • /
    • 2015
  • Resource procurement and material handling are considered as a significant part of construction project especially in large or tall building construction site. There are multiple variables that must be considered in a construction site during finishing work such as movement of materials, equipments, and workers. Therefore, it is difficult for construction workers to find the material handling path solely by intuition. The aim of this study is to propose a real-time path finding model suitable for complicated logistics flow in the field. The model explores the optimal transport path of finishing material with its basis on optimization algorithm, and it determines the direction of the Smart Sign. The proposed model is expected to be utilized for planning of efficient finishing material handling.

  • PDF

A value assessment model considering carbon emissions and environmental performance (환경성능과 CO2 배출을 고려한 가치평가 모델)

  • Kang, Sun-Im;Kim, Jong-Hyeob;Ji, Soung-Min;Han, Sangwon;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.113-114
    • /
    • 2012
  • With increasing awareness on sustainable construction and green buildings, environment-friendly construction activities have been introduced and promoted. Green value engineering (VE) is an effort that is recently introduced to facilitate environment-friendly construction. To support the application of green VE in construction, this paper suggests a green value assessment model considering the environmental performance and carbon emissions during construction. The value assessment model presented in this study is expected to help conduct objective value evaluation of construction activities in terms of both cost and environmental performance.

  • PDF

Issues Related to the Use of Time Series in Model Building and Analysis: Review Article

  • Wei, William W.S.
    • Communications for Statistical Applications and Methods
    • /
    • v.22 no.3
    • /
    • pp.209-222
    • /
    • 2015
  • Time series are used in many studies for model building and analysis. We must be very careful to understand the kind of time series data used in the analysis. In this review article, we will begin with some issues related to the use of aggregate and systematic sampling time series. Since several time series are often used in a study of the relationship of variables, we will also consider vector time series modeling and analysis. Although the basic procedures of model building between univariate time series and vector time series are the same, there are some important phenomena which are unique to vector time series. Therefore, we will also discuss some issues related to vector time models. Understanding these issues is important when we use time series data in modeling and analysis, regardless of whether it is a univariate or multivariate time series.

A Ventilation Control Model System of Standby Generating Room Installed in Basement of Building (건물 지하층에 설치된 자가발전기실의 환기제어 모델 시스템에 관한 연구)

  • 홍원표;강병권
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.14 no.2
    • /
    • pp.75-82
    • /
    • 2000
  • This paper presents a new ventilation control model system of standby generating room installed in basement of building. The regulation problem & current status of ventilation system considered the architectural construction and building service facility procedure are also investigated. The regulation solution, ventilation control model system and its theoretical analysis for room of the generating system by driven diesel are proposed from the analyzed results of survey.

  • PDF

Experimenal Study of Dynamic Characteristics of Brace-Typed Dampers using Vibration-resistant Rubbers (방진용 고무를 이용한 가새형 감쇠기의 진동 특성에 관한 실험 연구)

  • 민경원;김진구;조한묵;이성경;호경찬
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 1998.04a
    • /
    • pp.381-385
    • /
    • 1998
  • Vibration-resistant rubbers, whose elastic and shear behaviors are similar to viscoelastic materials, are used to make brace-typed dampers to reduce the building vibration. Experimental study is carried out to find the vibration characteristics of the dampers installed in the building model. The natural frequencies and modal damping ratios are obtained from the free vibration test and Fourier analysis. Analytical model of the modal strain energy method are used to find the viscoelastic characteristics of the brace-typed dampers from the experimental results. Finally shaking table test is performed to find the response behavior of the building model under earthquake loading. The present experimental study shows that the brace-typed dampers have the behavior of viscoelastic dampers, which increase the modal damping ratios and viscoelastic characteristics.

  • PDF

Ultimate torsional behaviour of axially restrained RC beams

  • Bernardo, Luis F.A.;Taborda, Catia S.B.;Andrade, Jorge M.A.
    • Computers and Concrete
    • /
    • v.16 no.1
    • /
    • pp.67-97
    • /
    • 2015
  • This article presents a computing procedure developed to predict the torsional strength of axially restrained reinforced concrete beams. This computing procedure is based on a modification of the Variable Angle Truss Model to account for the influence of the longitudinal compressive stress state due to the axial restraint conditions provided by the connections of the beams to other structural elements. Theoretical predictions from the proposed model are compared with some experimental results available in the literature and also with some numerical results from a three-dimensional nonlinear finite element analysis. It is shown that the proposed computing procedure gives reliable predictions for the ultimate behaviour, namely the torsional strength, of axially restrained reinforced concrete beams under torsion.

Generation of 3D Building Model Using Estimation of Rooftop Surface (Rooftop 평면 추정에 의한 3차원 건물 모델 발생)

  • Kang, Yon-Uk;Woo, Dong-Min
    • Proceedings of the KIEE Conference
    • /
    • 2005.07d
    • /
    • pp.2921-2923
    • /
    • 2005
  • This paper presents to generate 3D building model using estimation of rooftop surface after 3D line segment extraction using hybrid stereo matching techniques in terms of the co-operation of area-based stereo and feature-based stereo. we first performed a junction extraction from 3D line segment data which was obtained by stereo images, and finally generated building's reliable rooftop surface model using LSE(Least Square Error) method after creating surfaces by grouped and fixed junction points. we generated synthetic images for experimentation by photo-realistic simulation on Avenches data set of Ascona aerial images.

  • PDF

Application of Work Relationships for Linear Scheduling Model (선형 공정계획 모델의 작업 관계성 적용 방법)

  • Rye, Han-Guk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.131-133
    • /
    • 2010
  • As linear scheduling method has been used since 1929, Empire State Building linear schedule, it is being applied in various fields such as construction and manufacturing. When addressing concurrent critical path occurring on linear schedule of construction, the empirical researches stress the resource management which should be applied for optimizing work flow, flexible work productivity and continuos resource allocation. However, work relationships has been usually overlooked for making the linear schedule from existing network schedule. Therefore, this research analyze the previous researches related to linear scheduling model and then propose the method that can be applied for adopting the relationships of network schedule to the linear schedule.

  • PDF

A development of a checklist to check the consistency of BIM and drawings at the construction documentation phase (실시설계단계 BIM과 도면의 정합성 검토를 위한 체크리스트 개발)

  • Kim, Byeong-Ju;Kim, Yi-Je;Chin, Sang-Yoon
    • Journal of KIBIM
    • /
    • v.8 no.1
    • /
    • pp.33-42
    • /
    • 2018
  • The consistency between a building information model(BIM) and drawings are very important and has a critical impact on the usage of BIM throughout the project life-cycle. The purpose of this study is to develop a checklist for the consistency check between BIM and drawings. In this research, requirements for drawings in the construction documentation phase were analyzed. In generating drawings based on BIM, a checklist can help practitioners confirm what to modify in the BIM model and what to modify in CAD drawings. Finally, it is expected that the work efficiency will be improved by reducing the unnecessary work by distinguishing the elements that can be extracted from the BIM model from the elements that requires additional works when generating BIM-based drawings.