• 제목/요약/키워드: model assessment

검색결과 6,469건 처리시간 0.032초

수행평가 과제 제작의 모형 및 준거에 관한 연구 (Study on the Development of Model and Criteria of Performance Assessment Task to Elementary Mathematics)

  • 유현주
    • 대한수학교육학회지:수학교육학연구
    • /
    • 제8권1호
    • /
    • pp.163-182
    • /
    • 1998
  • Performance assessment is one of the authentic assessment method that are consistent with new curriculum goal, concentrated on the process rather than the results of problem solving. But the key to good assessment is matching the assessment task to intended objectives. Based on the review of literatures, the current performance assessment task was critically analysed. As a result, this study developed appropriate model and criteria of performance assessment task to elementary mathematics.

  • PDF

중소기업 재지원을 위한 성과평가모형 개발 (Performance Assessment Model Development for the Small and Medium Sized Firm's Resupporting Program)

  • 전순영
    • 한국산학기술학회논문지
    • /
    • 제13권12호
    • /
    • pp.5776-5785
    • /
    • 2012
  • 정부의 중소기업 지원 및 재지원을 위한 최적의 기업평가모형은 존재하지 않는다. 다만 여러 모형에서 활용되고 있는 평가 변수 즉, 관리 요소에 대한 의견과 대안이 검토되고 있으며, 이들 평가요소들은 기업의 입장에서는 중요하게 관리하여야 할 변수로 자리매김할 수 있을 것이다. 이에 경영혁신형 중소기업인증모형, 기술혁신형 중소기업인증모형, 생산성 경영체제 인증모형, 은행연합회 중소기업신용평가모형, 공기업의 경영성과평가모형의 의의와 배경, 평가요소, 시사점등을 알아보고 이를 종합하여 정부의 재지원을 위한 신생기업의 성과평가모형을 개발하고자 한다.

A quantitative methodology for evaluating the ship stability using the index for marine ship intact stability assessment model

  • IM, Nam-Kyun;CHOE, Hun
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • 제13권1호
    • /
    • pp.246-259
    • /
    • 2021
  • IMO stability regulations include various stability parameters such as GM values. To assess the stability of the ships, we should check all stability parameters of the IMO requirements. However, since this process is complex, a more convenient way to evaluate stability performance is required. In this research, the index for marine ship intact stability assessment (IMSISA) model was developed to solve these problems. The IMSISA model consists of a stability index calculation module and a stability assessment module. In the stability index calculation module, ten stability parameters, including GM, were used to develop the stability index, which has the advantage of being able to quantify the ship stability. The stability assessment module uses the stability index value to determine the stability status of the ship and provides the captain with stability management guidelines. To verify the proposed model, the basic stability calculations were performed for two model ships in 32 loading situations. The proposed model was found to provide better performance in the stability assessment than the previous study. By applying the IMSISA model to the ships, the captain can assess the ship stability more quantitatively and efficiently.

A BIM-based model for constructability assessment of conceptual design

  • Fadoul, Abdelaziz;Tizani, Walid;Koch, Christian
    • Advances in Computational Design
    • /
    • 제3권4호
    • /
    • pp.367-384
    • /
    • 2018
  • The consideration of constructability issues at the design stage can lead to improved construction performance with smooth project delivery and savings in time and money. Empirical studies demonstrate the value obtained by integrating construction knowledge with the building design process, and its benefits for owners, contractors and designers. However, it is still a challenge to implement the concept into current design practice. There is a need for a decision support tool to aid designers in reviewing their design constructability, deploying current technological tools, such as BIM. Such tools are beneficial at the conceptual design stage when there is a room to improve the design significantly with less incurred cost. This research investigates how current process- and object-oriented models can be used to assess design constructability. It proposes a BIM-based model using embedded information within the design environment to conduct the assessment. The modelling framework is demonstrated in four key parts; namely, the conceptual design model, the constructability assessment model, the assessment process model and the decision-making phase. Each is associated with a set of components and functions that contribute towards the targeted constructability assessment outcomes. The proposed framework is the first to combine a numerical assessment system and a rule-based system, allowing for both quantitative and qualitative approaches. The modelling framework and its implementation through a prototype are described in this paper. It is believed that this framework is the first to enable users to transfer their construction knowledge and experience directly into a design platform linked to BIM models. The assessment criteria can be customised by the users who can reflect their own constructability preferences into various specialised profiles that can be added to the constructability assessment model. It also allows for the integration of the assessment process with the design phase, facilitating the optimisation of constructability performance from the early design stage.

건축공사 계약해지에 따른 비용산정에 관한 연구 (A Study on the Cost Estimation in Case of Termination in the Building Construction Contract)

  • 이호일;최인성
    • 한국건축시공학회지
    • /
    • 제3권2호
    • /
    • pp.95-102
    • /
    • 2003
  • Financial difficulties and claims frequently stop construction works and cause subsequent contract cancellations. However, as the criteria to assess costs have not been established, many cases of legal disputes over the assessment of cancellation costs are taking place and the concerned parties are suffering the loss of time and money. Therefore, the present research aimed at developing a rational and systematic model of cancellation cost assessment following the cancellation of contracts. The research was carried out in the following methods and scopes. 1 ) The research was focused on the assessment of fair cancellation costs from constructors' side for contracts cancelled by any causes for which the owners have liability. 2) To obtain basic materials about cancellation cost assessment methods, contracts, claims, contract cancellations and construction-related laws at home and abroad were examined. 3) A cost assessment model was developed for systematization and efficient operation of cancellation cost assessment, and the reliability and efficiency of the proposed model was verified through a case study. The conclusions drawn from the research are as follows. The importance of the cancellation cost assessment model was confirmed as, using the cancellation cost assessment model, direct cancellation cost and indirect cancellation cost could be assessed systematically, the number of disputable items could be reduced because reasonable evidences of actual spending were presented, and the loss of constructors could be minimized because systematic and rational cost assessment became possible for many disputable cases of indirect cancellation cost, which the constructors had been unable to prove so far though having spent.

기술제안서의 개발조직 부문에 관한 정량적 평가 (A Quantitative Evaluation on Developmental Organization of Technical Proposals)

  • 추경균;권영갑;류성열
    • 한국IT서비스학회지
    • /
    • 제3권1호
    • /
    • pp.21-41
    • /
    • 2004
  • The technical proposal suggested and published by MIC(Ministry of Information and Communication, henceforth MIC) contains too general assessment elements, which causes qualitative and subjective assessment of technical proposals. Thus, in terms of the technical proposal assessment. It lacks In fairness, validity and accuracy. Furthermore, it has a great deal of difficulty in assessment caused by the inconsistency between proposal planning and assessment methods. Also, each company has different writing format, so it is impossible to make use of its maneuvering data for the assessment. To overcome these weaknesses, our research focused on a quantitative evaluation on development organization, which is a part of organizational and administrative part of the technical proposal suggested and published by MIC. In this research, we divided development organization for the technical proposal into organization, teams, and team members, and then studied addition, deletion and merging for the assessment criteria. For the related study, we chose especially CMM(Capability Maturity Model) from a lot of international and national references, which is a model measuring the maturity of organization, and then we focused on Small-CMM which is available in the small-sized organization. We also suggested input form, description method, assessment elements for the quantitative assessment in the chosen developmental organization, and finally we proposed standard referencing criteria for the assessment. Our study concludes that our assessment method are valid and available in comparison with the previous Delphi method through a validity evaluation test.

열차 충돌/탈선사고 위험도 평가모델 개발 (Development of the Risk Assessment Model for Train Collision and Derailment)

  • 최돈범;왕종배;곽상록;박찬우;김민수
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.1518-1523
    • /
    • 2008
  • Train collision and derailment are types of accident with low probability of occurrence, but they could lead to disastrous consequences including loss of lives and properties. The development of the risk assessment model has been called upon to predict and assess the risk for a long time. Nevertheless, the risk assessment model is recently introduced to the railway system in Korea. The classification of the hazardous events and causes is the commencement of the risk assessment model. In previous researches related to the classification, the hazardous events and causes were classified by centering the results. That classification was simple, but might not show the root cause of the hazardous events. This study has classified the train collision and derailment based on the relevant hazardous event including faults of the train related the accidents, and investigates the causes related to the hazardous events. For the risk assessment model, FTA (fault tree analysis) and ETA (event tree analysis) methods are introduced to assess the risk.

  • PDF

이러닝 협동학습 평가 모델 개발 (Development of a Collaborative e-Learning Evaluation Model)

  • 오양가 체렝검버;이길흥
    • 디지털산업정보학회논문지
    • /
    • 제11권1호
    • /
    • pp.135-144
    • /
    • 2015
  • This study aims to propose an evaluation model that enables cooperative learning using e-Learning system. Even if the teacher and the student are not in the same place at the same time, the team project deliverable submitted by the student to the online system can be viewed by the teacher, enabling the teacher to assess the student not only based on the project but also in many other aspects. The proposed e-learning cooperative learning model allows the development of assessment factors, using such factors in assessment of the student's activities which are performed through the e-learning system, and the feedback of the results to the student so that the student is further motivated for learning. The teacher performs a comprehensive assessment of such factors, which is considered in conjunction with the student's assessment. Implementing the cooperative learning model proposed in this study in various e-learning systems such as Moodle is expected to motivate the student for learning, produces better cooperative learning results, provides greater convenience of assessment to the teacher, and improves fairness of assessment by showing the student's activities in real time.

A Study on the Development the Maritime Safety Assessment Model in Korea Waterway

  • Park, Young-Soo;Kim, Jong-Sung;Aydogdu, Volkan
    • 한국항해항만학회지
    • /
    • 제37권6호
    • /
    • pp.567-574
    • /
    • 2013
  • Although Korea coastal area has the increasing potential marine accident due to frequent ship's encounter, increased vessel traffic and large vessel, there is no specific model to evaluate the navigating vessel's risk considering the domestic traffic situation. The maritime transport environmental assessment is necessary due to the amended maritime traffic law. However, marine safety diagnosis is now carried out by foreign model. In this paper, therefore, we suggest a domestic traffic model reflecting the characteristics of korea coastal area and navigator's risk as we named PARK(Potential Assessment of Risk) model. We can evaluate the subjective risk by establishing the model and model output into maritime risk exposure system. To evaluate this model's effectiveness, we used ship handling simulation and applied, analyzed collision accident which occurred in korea coastal area. And also, we applied integrated to an ECDIS program for monitoring traffic risk of vessels with real time based AIS data and apply to evaluate traffic risk in busan harbor waterway. As a result, we could evaluate busan harbor waterway risk effectively.

Multi-layers grid environment modeling for nuclear facilities: A virtual simulation-based exploration of dose assessment and dose optimization

  • Jia, Ming;Li, Mengkun;Mao, Ting;Yang, Ming
    • Nuclear Engineering and Technology
    • /
    • 제52권5호
    • /
    • pp.956-963
    • /
    • 2020
  • Dose optimization for Radioactive Occupational Personal (ROP) is an important subject in nuclear and radiation safety field. The geometric environment of a nuclear facility is complex and the work area is radioactive, so traditional navigation model and radioactive data field cannot form an effective environment model for dose assessment and dose optimization. The environment model directly affects dose assessment and indirectly affects dose optimization, this is an urgent problem needed to be solved. Therefore, this paper focuses on an environment model used for Dose Assessment and Dose Optimization (DA&DO). We designed a multi-layer radiation field coupling modeling method, and then explored the influence of the environment model to DA&DO by virtual simulation. Then, a simulation test is done, the multi-layer radiation field coupling model for nuclear facilities is demonstrated to be effective for dose assessment and dose optimization through the experiments and analysis.