• Title/Summary/Keyword: mobile project management information system

Search Result 46, Processing Time 0.036 seconds

Reengineering Daily Reporting Process by Using Task Generator and Mobile Technology (작업생성기와 모바일 기술을 이용한 작업일보 프로세스 리엔지니어링)

  • Kang Woo-Young;Chin Sangyoon;Kim Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.3 s.25
    • /
    • pp.100-110
    • /
    • 2005
  • As construction projects are getting more complex and larger in size, the amount of information is increased exponentially, which requires information management systems to accumulate as-built information throughout the project life-cycle. Particularly, a daily report system is very important, since it helps them keep track of various as-built information at the most detailed level. However, there have been many problems with daily reporting since its process is time-consuming and contains a lot of redundancies and ambiguities. Therefore, the objective of this research is to improve a process of collecting as-built information and managing daily report. To do so, this research developed a to-be process model and a daily report system. The daily report system developed in this research consists of interactive task generator and daily report management modules. The system has been successfully implemented in a real world construction project. The system development processes including process analysis, information models and system features are described along with discussions on the results and improvements.

Development of Mobile-Based Process and System for Pipe Management of Construction Using NFC(Near Field Communication) and Augmented Reality Technology (NFC(Near Field Communication)와 증강현실 기술을 활용한 모바일 기반 플랜트 배관공사관리 프로세스 체계 구축)

  • Moon, Daeyoon;Kwon, Soonwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.122-131
    • /
    • 2014
  • As plant market grows up, client demands to increase quality, technology and to reduce construction period. Due to the vast scale of the construction site and complexity of process, plant project can have some problems of communication among the project participants, the duplication of work, errors and rework. As a result those cause more costs, delay the construction schedule and reduce productivity and quality. Therefore, real-time communication between participants and real-time sharing of information such as material, equipment and construction are required in plant project site. This research aims to propose process and develop system using NFC(Near Field Communication) technology and augmented reality technology with mobile device for plant construction site. Administrators and operators are able to work efficiently using proposed process and system which create an environment designed to share and deliver information such as material, construction information.

Construction Material Management Using Smart Mobile Computing (스마트 모바일 어플리케이션을 이용한 건설 자재 관리)

  • Lee, Kwang-Pyo;Lee, Hyun-Soo;Park, Moon-Seo;Kim, Eui-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.4
    • /
    • pp.59-69
    • /
    • 2011
  • Construction works have become larger and more complex, improving productivity by introducing Information Technology (IT) is pursued. In this circumstance, many different kinds of project management system is being introduced, and various IT technologies are applied such as Personal Digital Assistant (PDA), Bar Code, Radio Frequency Identification (RFID), Web Camera, and so on. However, these kinds of technologies might cause reprocessing of information and ineffectiveness of project because of lack of real time information processing technology or separation between construction sites and management offices. Therefore, this research aims to develop Application that can be applied efficiently for construction material management, by understanding problems of former management system with questionnaires and extracting functions with analysis of requirements. This will be possible to input information automatically, to process and check material information in real time, and to identify the location of necessary material. Then, the problem of separation between construction sites and management offices are solved, and as a result, more efficient management of materials in construction sites will become possible.

SMRT STnF Construction and Performance (서울특별시도시철도공사 STnF 구축과 성과)

  • Lee, Jong-Kye;Park, Jong-Hun;Kim, Ki-Chun
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2573-2580
    • /
    • 2011
  • SMRT(Seoul Metropolitan Rapid Transit Corporation) changed PC-oriented office system to Smart-Phone oriented mobile office system(STnF: SMRT Talk & Flash), and provided smart phone to all staffs. STnF make it possible not only voice communication between staff, but also to input and inquiry all kind of information related to work(ex: Facility maintenance, Rolling Stock management, office management, Finance, human resource etc.) based on smart phone. STnF conquers the limitation of time and space. All staffs can commute to the site directly to reduce moving time and to share information between staffs, so SMRT improve speed and reliability of work by making a quick decision and action on the spot. After introduction of STnF, within 1 year, the equipment failure ratio fell to 47%. Mobile office system reduced and level-off the step of approval. so enhanced civil customer service. Quantification and scientific movement of work make it fast evolution and development. These business improvement make it possible to put more outstanding manpower on new business and R&D project, and this contributes to company's management effectiveness.

  • PDF

Constructed Mobile System for Management affair of Water & sewage Facilities (상하수도 유지관리업무를 위한 모바일 시스템 구축)

  • Lee, Hyun-Jik;Park, Ki-Suk;Ru, Ji-Ho
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.12 no.3 s.30
    • /
    • pp.69-78
    • /
    • 2004
  • Since 1995, One of the NGIS(National Geographic Information System) projects, the underground utilities project, has been finished in 2003. The 19 cities in korea for this project will use underground utilities management system using underground utilities database focusing on water and sewage system. However, special expert, technical and experience problem in computer environment has not been had in working department for water and sewage management and maintenance for each local government. The management and maintenance by underground utilities database by manual method is getting lowered a data qualify of underground utilities database because of the data omitting, error in writing and securing of the lasted database. Therefore, in this study, Application test for field workers using a mobile tool and environment analysis of wireless communication in Korea and application test of GPS receiver for mobile tools had been processed and made a mobile working environment. The efficient management and maintenance method for underground utilities database has been developed an off-line method for modification and update of database about general work which has a high working frequency because of the limitation of wireless communication environment. Also, the emergency working has been applied for on-line method.

  • PDF

The Impacts of Project Governance, Agency Conflicts on the Project Success : From the Perspective of Agency Theory (프로젝트 거버넌스가 대리인 갈등 및 프로젝트 성공에 미치는 영향 : 대리인 이론 관점)

  • Jeong, Eun-Joo;Kim, Bo-Ram;Jeong, Seung-Ryul
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.3
    • /
    • pp.11-20
    • /
    • 2018
  • Recently companies have increased the new projects to improve and innovate the business process in order to adopt the advanced technologies such as IoT (Internet of Things), Big Data Analysis, Cloud Computing, mobile and artificial intelligence technologies for sustainable competitive advantages under rapid technological and socioeconomic external environmental changes. However, there are obstacles to achieve the project goals, corporate's strategy and objectives due to various kind of risks based on characteristics of projects and conflicts of stakeholders participated on projects. Hence, the solutions are required to resolve the various kind of risks and conflicts of stakeholders. The objectives of this study are to investigate the impact of the project governance, agency conflicts on the project success based on agency theory by using the statistical hypothesis testing the relationship among those variables. As a result of hypothesis testing, we could find that the project governance impacts positively on project success and negatively on the agency conflicts. Further, the agency conflicts impacts negatively on the project success. Finally, we could find that the agency conflicts such as goal conflict, different risk attitude and information asymmetry between project manager and team members impact negatively on the project success. Meanwhile, the project governance impact positively on the project success, negatively impact on the agency conflicts such as goal conflict, different risk attitude and information asymmetry between project manager and project team members. In order to increase the project success rate, the project governance institutions such as PGB (Project Governance Board), EPMO (Enterprise Project Management Office), PSC (Project Steering Committee) are needed to prevent or reduce the agency conflicts between project manager and team members.

Experimental Study on Wall Transmission Loss of Electric wave for the RTLS Application of Building Construction Project (건설현장 RTLS 활용을 위한 전파의 벽체 투과손실에 관한 실험적 연구)

  • Lee, Jong-Kook;Lee, Young-Hun;Park, Jung-Hyun;Son, Min-Ji
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.1
    • /
    • pp.95-101
    • /
    • 2009
  • Although the concept of RTLS is very unfamiliar to construction industry, recently it is popular in other industry, such as logistics, ship building, mobile telecommunication based on state-of-the-art information technology. Effective resource management using cutting-edge information technology makes it possible to succeed a project with saving the time and cost. And effective information management in construction project can be achieved by the new technologies such as RFID, WEB-based internet, DB technology, real-time monitoring technology, etc. This paper suggest the characteristics and applicability of the international standard electric waves to be used for the real-time locating system (RTLS) on the viewpoint of transmission loss in construction field to monitor and manage resources of construction project effectively The two types of electric waves based on the international standard is to be suggested after surveying the as-is technology in the related industries and then is analyzed to find out the characteristics of those by the concept of the electric wave transition loss in the several construction situations. Two main electric waves, the 2.4GHz and the 433MHz technologies as the international standard is researched on the applicability to the indoor environment of construction site.

The Mobile Digital ID Wallet based on LTE/SAE for 4G Networks (4G 네트워크를 위한 LTE/SAE 기반의 모바일 전자ID지갑)

  • Jung, Yun-Seon;Lim, Sun-Hee;Yi, Ok-Yeon;Lee, Sang-Jin
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.33 no.10C
    • /
    • pp.764-777
    • /
    • 2008
  • In 4G environments, which is the next generation technology for mobile network, it is forecasted that the wireless Internet using a mobile devices such as a mobile phone, PDA will increase because of expansion of Internet and integration of heterogeneous networks. Therefore, we need a Digital ID management technology that can prevent illegal uses and manage private information efficiently in wired and wireless environments. In this paper, we analyze various Digital ID management technologies, and then define requirements of user-centric Digital ID management technology. In addition, we newly propose the authentication mechanism for mobile applications in LTE/SAE network. Finally, we propose the mobile Digital ID Wallet mechanism suitable for 4G environments.

A Construction Supply Chain Management Process with RFID/WSN-based Logistics Equipment

  • Shin, Tae-Hong;Yoon, Su-Won;Chin, Sangyoon
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.4
    • /
    • pp.11-19
    • /
    • 2012
  • Construction supply chain management (CSCM) has become one of the critical factors that determine the success of a construction project as it becomes increasingly complicated and mega-sized. Particularly for high-rise or mega-sized building construction, just-in-time supply chain management is required due to lack of storage space and effective logistics for construction components and materials at a construction site. Despite the fact that research and development of radio frequency identification (RFID) and wireless sensor network (WSN) technology have been performed, construction project managers still need to carry mobile devices and check material and component flow at each stage of the supply chain process. This research proposes that the equipment used in the construction supply chain process, such as movers, trailers, gates, and hoists, can become main actors in the supply chain process using RFID and WSN technologies. And the proposed equipment and process focused on a solution to the redundancy identification problem, which has been observed in operations that use RFID/WSN-based processes for construction logistics. This paper also presents issues identified through verification and validation of the research results and proposes further studies.

The Influence of On-line Social Networking on Performance of Members in Information System Development Projects (정보시스템구축 프로젝트에서 구성원의 업무성과에 대한 온라인 소셜네트워킹의 영향)

  • Kim, Hee Yeong;Lee, John Hearn
    • Information Systems Review
    • /
    • v.16 no.1
    • /
    • pp.17-35
    • /
    • 2014
  • Social collaboration and knowledge sharing among experts are the key characteristics of information system development projects. But the difficulty and complexity of communication may be the cause of the project failures. This study analyzes the influence of on-line social networking as communication system in information system development projects. A model has been developed to relate system, knowledge and social factors of on-line social networking to the performance of project members. Transactive Memory System (TMS), describing knowledge sharing process in human relationship, is used as a mediator. The analysis concludes that knowledge and social characteristics have positive effect on the members' performance, implying that the use of mobile devices and PCs as a social communication tool can be an effective way to enhance the possibility of project success.