• Title/Summary/Keyword: measurement settlement

Search Result 217, Processing Time 0.024 seconds

Standards for Ground Settlement Management when Reinforcing Ground in the Abandoned Mine (폐광지역 지반공사시 지반침하 관리를 위한 기준)

  • Yang, In Jae;Lee, Seung Ah;Baik, Dong Ho
    • Tunnel and Underground Space
    • /
    • v.27 no.5
    • /
    • pp.295-302
    • /
    • 2017
  • In this study, a new quantitative instrumentation and measurement standards applicable to the field of mining has been proposed to improve the problems of the current measurement practices that apply the measuring standards of the civil engineering field (road, railway, etc.). With the data coordination of the mine reclamation corporation, we collected data on ground subsidence in the abandoned mine area, and studied various techniques for establishing a new management reference value based on the manual measurement data measured in the field. As a result, new instrumentation and measurement standards is set up and proposed by using statistics like the average value, the third quartile, the 95% confidence, and the maximum value.

Prediction and Field Measurement of Settlement due to Preloading at the Delta of Nakdong River (낙동강 삼각주에서 선행하중에 따른 침하예측 및 현장계측)

  • 정성교;백승훈;김규종;이대명
    • Journal of the Korean Geotechnical Society
    • /
    • v.15 no.5
    • /
    • pp.99-110
    • /
    • 1999
  • Settlement and consolidation time were predicted through systematic soil investigation at the delta of Nakdong river where the preloading method was applied. Field measurements were executed with well-selected instruments. As the results of the comparison, the predicted settlement on the sand layer of about 20m thick underestimated the observed one by 20%. This underestimation was due to the effects of vibration during installation of PBD, creep, the overestimated deformation modulus, and so on. For the clay layer of about 20m in thickness under the sand layer, an ID analysis for underconsolidated soil initially overestimated the observed settlement by 240%. However, when the laboratory compression curve was reconstructed and a conventional ID analysis for NC clay was applied, the re-calculated settlement of the clay layer was relatively similar with the observed one. And the predicted consolidation time was about 45% less than the observed one, because of different influencing factors.

  • PDF

A Study on the Applicability of Prediction Methods for Long-term Ground Settlement in Soft Ground of Gyeongnam Area (경남지역 연약지반의 장기침하량 예측방법에 대한 적용성 연구)

  • Park, Eunhyung;An, Ducklae;Chae, Hwiyoung;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.10
    • /
    • pp.5-13
    • /
    • 2012
  • In this study, the degrees of consolidation were evaluated by analyzing the long-term settlement measured at the 3 work sites with soft ground in Gyeongnam Area. The Hyperbolic, Hoshino and Asaoka method were used, which were focused on prediction of long-term settlement of land on the basis of field measurement data. And the applicability of the settlement prediction method according to the measurement periods was investigated by analyzing the degree of consolidation at the target areas after dividing the terms into early and latter parts. According to the results obtained at the early stage of consolidation, the Hyperbolic method appeared to be in the highest applicability level, which was followed by Asaoka and Hoshino method in the order of level. In the case of latter stage of consolidation, Asaoka method appeared to be in the highest applicability level, which was followed by and the Hyperbolic, Hoshino method in the order of level.

A Study on the Behavior of Surface Settlement due to the Excavation of Twin TBM Tunnels in the Clay Grounds (점토지반에서 TBM 병렬터널 굴진 시 지표침하거동에 대한 연구)

  • You, Kwangho;Jung, Suntae
    • Journal of the Korean GEO-environmental Society
    • /
    • v.20 no.2
    • /
    • pp.29-40
    • /
    • 2019
  • Mechanized constructions have been frequently increased in soft ground below sea bed or river bed, for urban tunnel construction, and for underpinning the lower part of major structures in order to construct a safer tunnel considering various risk factors during the tunnel construction. However, it is difficult to estimate the subsidence behavior of the ground surface due to excavation and needs to be easily predicted. Thus, in this study, when a twin tunnel is constructed in the soft ground, it is proposed a simpler equation relating to the settlement behavior and a corrected formula applicable to soft ground and large diameter shield tunnels based on the previously proposed theory by Peck (1969). For this purpose, it was analyzed to long-term measurement values such as the amount of maximum settlement, the subsidence range by ground conditions, and interference volume loss due to the parallel construction, etc. As a result, a equation was suggested to predict the amount of maximum settlement in the soft sediment clay ground where is located at the upper part of the excavation site. It is turned out that the proposed equation is more suitable for measurement data in Korea than Peck (1969)'s.

A Study on the Applicability of Settlement Prediction Method Based on the Field Measurement in Gimpo Hangang Site (김포한강지구 계측자료를 이용한 침하예측기법의 적용성에 관한 연구)

  • Lee, Jungsang;Jeong, Jaewon;Choi, Seungchul;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.12
    • /
    • pp.35-42
    • /
    • 2012
  • There are many large-scale coastal region landfill and land development by loading to use territory efficiently, this regions are mostly soft clay ground. Constructing structures and road on the soft ground bring about engineering problems like ground shear fracture and a big amount of consolidation by bearing capacity. Improvement of soft soil is required to secure soil strength and settlement control. In improvement of soft soil, predict for the amount of settlement based on field surveyed reports are important element for estimating pre-loading banking height and the final point of consolidation. In this study, there is calculating theoretical settlement by analyzing field surveyed report and ground investigation to improvement of soft soil with pre-loading and vertical drain method. And present settlement prediction method reflect soil characteristics in Gimpo Hangang site by analysing prediction settlement and observational settlement during compaction using hyperbolic, ${\sqrt{s}}$, Asaoka method.

Field test of the long-term settlement for the post-grouted pile in the deep-thick soft soil

  • Zou, Jin-Feng;Yang, Tao;Deng, Dong-ping
    • Geomechanics and Engineering
    • /
    • v.19 no.2
    • /
    • pp.115-126
    • /
    • 2019
  • The long-term settlement characteristics for the cast-in-place bored pile in the deep-thick soft soil are investigated by post-grouting field tests. Six cast-in-place bored engineering piles and three cast-in-place bored test piles are installed to study the long-term settlement characteristics. Three post-grouting methods (i.e., post-tip-grouting, post-side-grouting, and tip and side post-grouting) are designed and carried out by field tests. Results of the local test show that decreased settlements for the post-side-grouted pile, the post-tip-grouted pile and the tip and side post-grouted pile are 22.2%~25.8%, 30.10%~35.98% and 32.40%~35.50%, respectively, compared with non-grouted piles. The side friction resistance for non-grouted piles, post-side-grouted pile, post-tip-grouted pile and the tip and side post-grouted pile undertakes 89.6~91.3%, 94.6%, 92.4%~93.0%, 95.7% of the total loading, respectively. At last, the parameters back analysis method and numerical calculation are adopted to predict the long-term settlement characteristics of the cast-in-place bored pile in the deep-thick soft soil. Determined Bulk modulus (K) and a creep parameter (Ks) are used for the back analysis of the long-term settlement of the post-grouted pile. The settlement difference between the back analysis and the measurement data is about 1.11%-7.41%. Long-term settlement of the post-grouted piles are predicted by the back analysis method, and the predicted results show that the settlement of the post-grouted pile are less than 6 mm and will be stable in 30 days.

Study of the Long-Term Behavior Characteristics of Roadbed on Concrete Track of High-speed Railway (고속철도 콘크리트 궤도상 토공노반의 장기거동 특성 연구)

  • Choi, Chan-Yong;Jung, Jae-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.4
    • /
    • pp.8-16
    • /
    • 2018
  • This study examined the long-term behavior of a roadbed using high-speed railway concrete track and roadbed measurement data and evaluated the long-term performance of the track and roadbed. Recently, high-speed railway track type has been adopted as a concrete slab. On the other hand, the concrete track is vulnerable to roadbed settlement. In the case of gravel tracks, it is easy to restore the original state by maintenance even if the roadbed settles. On the other hand, in the case of the concrete track, if excessive settlement of the roadbed occurs, cracks are generated continuously on the slabs and sleepers, resulting in greatly reduced usability. For this reason, it is difficult to restore the original state only by partial maintenance. In this paper, a long-term performance evaluation was carried out on a concrete track during operation by monitoring the measurement data of sensors buried from the beginning of construction for approximately 3 years after the high-speed railway opened. Performance evaluation methods include a performance evaluation of track/roadbed when the train passes, long-term track and roadbed performance evaluation, analysis of the track/roadbed effect on long-term settlement and analysis of the factors influencing long-term settlement. The trail response of KTX-Sancheon was greatest in the track/roadbed performance evaluation by train. The results of the long-term track and roadbed performance evaluation were measured within the standard values. The track and roadbed performance impact assessment with long-term settlement was strongly related to TCL settlement. The influences of the water content and groundwater level were verified by analyzing the external factors of long-term settlement. Through such a method, the stability of a track/roadbed can be secured.

A Study on a Compression Index for Settlement Analysis of SCP Treated Ground Using Back Analysis (역해석을 이용한 모래다짐말뚝(SCP)으로 개량된 연약점토지반의 압축지수 결정에 관한 연구)

  • Hwang, Sungpil;Im, Jongchul;Kwon, Jeonggeun;Kang, Yeounike;Joo, Ingon
    • Journal of the Korean GEO-environmental Society
    • /
    • v.11 no.7
    • /
    • pp.5-14
    • /
    • 2010
  • The paper processed settlement analysis using Finite Elements Method(FEM). Because Stress Distribution Ratio has to be decreased, for settlement analysis of soft clay deposit improved by sand compaction piles(SCP). Back analysis was processed comparing the measured settlements of laboratory model tests and finite element analysis where the SCP treated area was assumed as mixed ground with clay deposit rather than being a composite ground. The paper proposes a methodology which employs a compression index($C_c$) for settlement analysis of soft clay deposit improved by sand compaction piles from the back analysis. This approach is applied to a field measurement case(A revetment founded on the SCP improved clay deposit with the replacement ratio of 45%).