• Title/Summary/Keyword: management solution

Search Result 3,407, Processing Time 0.032 seconds

Integer solution to the ring loading problem with demand splitting

  • Myung, Young-Soo
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.10a
    • /
    • pp.125-128
    • /
    • 1996
  • In this paper, we consider a ring loading problem, which arises in the design of SONET bidirectional rings. We deal with the case where demands are allowed to be split and routed in two different directions. Even if integral . demands are given, the optimal solution of the problem doesn't always have integral values. We present an efficient algorithm which produces an integral optimal solution.

  • PDF

Economic production quantity with expontial deterioration

  • Hwang, Hark;Kim, Kap-Hwan
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.4 no.1
    • /
    • pp.53-58
    • /
    • 1979
  • Production lot sizing problem for a system with exponentially decaying inventory is considered. From the exact cost function developed under conditions of constant demand and no shortages permitted, an approximate optimal solution is derived. The formula is compared with those of the exact solution obtained from numerical procedure and other existing approximate solution. Finally some notable properties of the formula are investigated and shown to be consistent.

  • PDF

A Study on Solution Methods of Two-stage Stochastic LP Problems

  • Lee, Sang-Jin
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.22 no.1
    • /
    • pp.1-24
    • /
    • 1997
  • In this paper, we have proposed new solution methods to solve TSLP (two-stage stochastic linear programming) problems. One solution method is to combine the analytic center concept with Benders' decomposition strategy to solve TSLP problems. Another method is to apply an idea proposed by Geoffrion and Graves to modify the L-shaped algorithm and the analytic center algorithm. We have compared the numerical performance of the proposed algorithms to that of the existing algorithm, the L-shaped algorithm. To effectively compare those algorithms, we have had computational experiments for seven test problems.

  • PDF

EXISTENCE OF OPTIMAL SOLUTION AND OPTIMALITY CONDITION FOR PARAMETER IDENTIFICATION OF AN ECOLOGICAL SPECIES SYSTEM

  • LI CHUNFA;FENG ENMIN
    • Journal of applied mathematics & informatics
    • /
    • v.18 no.1_2
    • /
    • pp.273-286
    • /
    • 2005
  • Parameter identification problem of a three species (predator, mutualist-prey, and mutualist) ecological system with reaction-diffusion phenomenon is investigated in this paper. The mathematical model of the parameter identification problem is constructed and continuous dependence of the solution for the direct problem on the parameters identified is obtained. Finally, the existence of optimal solution and an optimality necessary condition for the parameter identification problem are given.

An Exact Solution Method for Finding Nondominated Project Schedules (비열등 프로젝트 일정 탐색)

  • Ahn Tae-Ho;Kim Myung-Kwan;Lee Dong-Yeup
    • Management & Information Systems Review
    • /
    • v.5
    • /
    • pp.287-300
    • /
    • 2000
  • Project Managers want to reduce the cost and the completion time of the project simultaneously. But the project completion time tends to increase as the project cost is reduced, and the project cost has a tendency to increase as the project completion time is reduced. In this paper, the resource constrained project scheduling problem with multiple crashable modes is considered. An exact solution method for finding the efficient solution set and the computational results are introduced.

  • PDF

A Model Development of Injury Prevention for Application in the Semiconductor Industry (반도체 산업에서의 재해 예방 모델 개발)

  • Yoon, Yong-Gu;Hong, Sung-Man;Park, Peom
    • Journal of the Korea Safety Management & Science
    • /
    • v.4 no.3
    • /
    • pp.1-11
    • /
    • 2002
  • It has been Management for stabilize Enterprise-Management for Economic demand for to Productivity, Automation, customer satisfaction, Especially Semiconductor-Industry has been, potential-risk in working to factory to machine equipment, all kinds of utility, gas, chemical, electronic, Fire. This study of basic-purpose has Research Different From as Follow to analysis and Solution For semiconductor product Factory of a actual point Data and specific-gravity to Relation for company-Injury. 1. It has been try to Injury-Tendency and cause-Analysis for our County-Manufacture-Occupation. 2, Semiconductor Injury of Actual-condition in Enforcement for problem and Analysis that Injury Problem has occupated it Submitted to Solution for ordinary Injury theory View to point Solve at for New Model has applicated to that nilem for processed to Solution.

Numerical Solution of Riccati Differential Equation in Optimal Control Theory (최적제어이론과 관련된 "리카티" 미분방정식의 수식해)

  • 경규학
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.9 no.2
    • /
    • pp.28-33
    • /
    • 1984
  • In this paper some procedures are given whereby an analytic solution may be found for the Riccati differential equation and algebraic Riccati equation in optimal control theory. Some iterative techniques for solving these equations are presented. Rate of convergence and initialization of the iterative processes are discussed.

  • PDF

An Effective Project risk Management Based on Systems Engineering (시스템엔지니어링에 기반한 효과적인 리스크 관리)

  • Kang, Top;Kim, Sung-Cheol;Oh, Jung-Taek
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.7 no.1
    • /
    • pp.43-51
    • /
    • 2011
  • SE generally defines approaching ways of conducting identification, verification and integration of an optimized product and process solution to meet customer's needs by leveraging organizational competency in engineering and management. To successfully develop a new product under mass production contract, it is important to efficiently carry out the program by ensuring that three major competencies are secured; core technology, system integration, and program management. For successful implementation of tasks in the three areas, systematic execution is called for, which requires identifying risk factors in advance. In particular, comprehensive risk management role and responsibility is required for program management. Success of a development program is determined by complex elements of human resources, organization culture, and overall competency of an organization in technology and program management, including capability of the program manager. In this paper, a risk management solution is suggested to lead a program to success with a more efficient way through actual risk management by the concept of SE around the above three areas.

The Use of Particle Swarm Optimization for Order Allocation Under Multiple Capacitated Sourcing and Quantity Discounts

  • Ting, Ching-Jung;Tsai, Chi-Yang;Yeh, Li-Wen
    • Industrial Engineering and Management Systems
    • /
    • v.6 no.2
    • /
    • pp.136-145
    • /
    • 2007
  • The selection of suppliers and the determination of order quantities to be placed with those suppliers are important decisions in a supply chain. In this research, a non-linear mixed integer programming model is presented to select suppliers and determine the order quantities. The model considers the purchasing cost which takes into account quantity discount, the cost of transportation, the fixed cost for establishing suppliers, the cost for holding inventory, and the cost of receiving poor quality parts. The capacity constraints for suppliers, quality and lead-time requirements for the parts are also taken into account in the model. Since the purchasing cost, which is a decreasing step function of order quantities, introduces discontinuities to the non-linear objective function, it is not easy to employ traditional optimization methods. Thus, a heuristic algorithm, called particle swarm optimization (PSO), is used to find the (near) optimal solution. However, PSO usually generates initial solutions randomly. To improve the PSO solution quality, a heuristic procedure is proposed to find an initial solution based on the average unit cost including transportation, purchasing, inventory, and poor quality part cost. The results show that PSO with the proposed initial solution heuristic provides better solutions than those with PSO algorithm only.

Development of Adoption Strategy and Guideline of Business Process Management Standards: Focusing on Business Process Execution Language (비즈니스 프로세스 관리 표준 도입 전략 및 지침 개발: 비즈니스 프로세스 실행 언어를 중심으로)

  • Kim, Dong-Soo
    • Journal of Information Technology Services
    • /
    • v.5 no.2
    • /
    • pp.107-123
    • /
    • 2006
  • The objectives of this study is to develop a strategy for the adoption of BPM(Business Process Management) standards and an implementation guideline of the BPM standard for BPM solution developers focusing on BPEL(Business Process Execution Language) which is regarded as the most important BPM standard. In the heterogeneous and distributed IT environments, every type of enterprise software requires standards to enhance interoperability. BPMS(Business Process Management System), which is a type of enterprise software requires BPM standards such as BPEL(Business Process Execution Language), BPMN(Business Process Modeling and Notation), BPQL(Business Process Query Language) and so on to achieve multi-system interoperability and component interoperability with their BPM solutions. It is quite helpful to provide the adoption strategy concerning BPM standards for each type of BPM solution vendors who need the BPM standards. Since the BPEL is conceived as the most important BPM standard and widely adopted by many BPM vendors, we have proposed a reference architecture for BPEL implementation and also developed the detail implementation guideline of core components of the BPM system supporting the BPEL standard. Using the strategy and implementation guideline proposed in this work, BPM solution vendors can establish their own standard adoption strategy and they can also develop their BPM solutions supporting the BPM standards more efficiently.