• Title/Summary/Keyword: management cost

Search Result 8,713, Processing Time 0.039 seconds

A Study on Analysis of Construction Monitoring Cost and Improvement Measures of Railway Tunnel Construction in Seoul (서울시 철도터널 건설공사의 공사계측비 분석 및 개선방안 연구)

  • Jong-Tae Woo
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.1
    • /
    • pp.18-30
    • /
    • 2023
  • Purpose: This study is to contribute to the development of monitoring technology through the increase of confidence in construction monitoring by deriving the analysis of construction monitoring cost and improvement measures of railway tunnel construction in Seoul. Method: It presents the status on design and contract of construction monitoring cost, status on application construction monitoring cost and its analysis, analysis on safety management cost and quality management cost, expansion of application of the price calculation standard for monitoring management services to improve this, and monitoring for direct order of ordering organization. Results: If the monitoring management service that was meanwhile ordered as included in the construction work is performed by the directly selected company of ordering organization through the preliminary screening for bidding qualification, then the improvement of monitoring quality and the accurate monitoring data can be secured. Conclusion: For the price calculation standard for monitoring management service, the application of actual cost addition method under the Engineering Promotion Act and the calculation standard of monitoring management cost for standard estimation for ground survey should be extended through the direct order of ordering organization, not the method to be included in the net construction cost where it is performed by a subcontractor via contractor.

A Study of Improvements in the Standards of Cost Estimate for the New Excellent Technology in Construction (건설 신기술의 원가산정기준 개선방안에 대한 연구)

  • Lee, Ju-hyun;Tae, Yong-Ho;Baek, Seung-Ho;Kim, Kyoungmin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.65-76
    • /
    • 2022
  • The New Excellent Technology (NET) designation system, introduced in 1989 for the purpose of promoting the development of domestic construction technology and enhancing national competitiveness, reviews the statement of construction cost of new technologies. And the cost reduction effect such as design, construction, and maintenance cost and the effect of reducing the construction duration are evaluated as an evaluation criteria of economic feasibility. However, in this evaluation process, differences of opinion between the institution of construction cost estimating standard management and the new technology developer about unique technologies frequently occur. In addition it is difficult to objectively compare the construction duration with existing similar technologies because there is no information on productivity as the current cost estimating standards for new technologies only present the required amount per unit quantity. In this study, the current state of cost estimating criteria review procedure, evaluation criteria, and cost estimating standards establishment method were analyzed when screening for the designation of a new construction technologies, and compared with overseas cost estimating standards, measures to improve the cost estimating standards of current construction new technologies were suggested. Through the improved cost estimating standards of this study, it is expected that cost information on new technologies will be provided to clients in more detail than the current ones, and the availability and applicability of new construction technologies would be improved by simplifying the construction cost calculation process more.

The Correlations among the Categorized Quality Cost Factors on Small & Medium-sized Enterprises (국내 중소 제조기업의 품질비용 행태에 관한 실증 연구)

  • Koo, Il-Seob;Lee, Sang-Choon;Jang, Kwang-Soon;Kim, Yong-Bum
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.2
    • /
    • pp.185-193
    • /
    • 2011
  • The successful and sustainable growth of SMEs depends on their ability of strengthen their competitiveness in quality and cost and service more than anything else as a fundamental of operation. Among these key competitive factors of SMEs, quality is the most critical factor in manufacturing business fields. There are many different ways to improve the quality performance but it needs proper management decision to choose the best way what can maximize outputs with minimum inputs. And it needs effective measurement methods and some indicators to analysis the quality performance properly. The quality cost is one of the simplest key indicators to measure the quality performance and the effectiveness of quality related management decisions. In this study, through survey on local SMEs, we found that their average annual quality cost ratio versus turnover - total amount of annual quality cost divided by annual turnover - is around 3.69% excluded some SME's performances what have different quality control measures with others. And we found some results what corresponded with the early studies on the correlations between those categorized quality costs factors and some discrepancies between some of the literature model and the early case study results as follows. There were negative correlations between the Prevention costs and the External failure costs, and the Appraisal costs and the External failure costs, and there was positive correlation between the Appraisal costs and Internal failure costs same as early studies. But, we couldn't found any strong negative correlations between the Cost of control - Prevention costs & Appraisal costs - and the Cost of Failure of control - Internal & External failure costs -.

Hospital Cost Analysts' Perception on Prime Cost of Medical Services and Future Direction to Establish a Cost Accounting system (병원 원가관리자의 원가인식 및 원가체계 구축 방향)

  • Noh, Jin-Won;Lee, Hae-Jong;Park, Hyun-Chun
    • Korea Journal of Hospital Management
    • /
    • v.19 no.1
    • /
    • pp.32-42
    • /
    • 2014
  • It is necessary to calculate prime cost of medical services accurately in order to evaluate the adequacy of medical fee. This paper aims to identify cost analysts' perception on prime cost of medical services and needs in establishing a cost accounting system in hospitals, proposing future directions and guidelines for the calculation of medical fee. A self-administered questionnaire and telephone survey on operation of a hospital cost-accounting system was conducted in November, 2012, among cost analysts currently working in the hospitals and hospital administrators planning to implement the hospital cost-accounting system. Our study shows that most of the cost analysts were aware of the importance of calculating prime cost and responded that collection of the prime cost data from government is necessary although they are less likely to provide the data in the future concerning the risk of data misuse and data security. They also responded that lack of budget allocation and excessive workload were the main reasons for not estimating the prime cost and operating cost management information system. Results show that hospital cost analysts considered the data accuracy is the most critical factor in calculating prime costs of medical services. However, there was no investment budget allocated in some hospitals or limited to less than 100 million, indicating that hospitals are reluctant to invest on implementing the cost accounting system. Respondents stated the organization that collects the prime cost of medical services among hospitals should display strong analytical capabilities, ensure data security, and maintain independence, which is most demanded. There are 57 hospitals that calculated the prime cost of medical services for 2012 by each medical department and 20 hospitals that calculated the prime cost by fee-for-services, aiming to establish a cost accounting system. Our results indicate that hospitals should voluntarily provide the accurate prime cost for medical services in order to properly evaluate the adequacy of medical fee. Consequently, it is critical to establish an independent organization to collect and appraise the data. It is also recommended that government should implement various policies to encourage hospitals to participate in the data collection to achieve the data accuracy and representativeness.

  • PDF

Empirical Analysis on the Chef's Performance of Food Materials Management for Cost Management Efficiency in Hotel Restaurants (호텔 레스토랑 원가 관리 효율화 방안을 위한 조리사의 식자재 관리 수행도 실증 분석 연구)

  • Seo, Min-Suk
    • Journal of the East Asian Society of Dietary Life
    • /
    • v.18 no.1
    • /
    • pp.149-157
    • /
    • 2008
  • This study examined the cost consciousness, food materials satisfaction, job satisfaction, and degree of food materials management of chefs, as a means to increase food materials management efficiency in hotel restaurants and to make suggestions, for efficiently reducing food material costs, Chefs from eleven 5-star hotels and one exceptional-grade restaurant in Seoul were asked to fill out a questionnaire for sampling. A total of 350 questionnaires were distributed and 334 were returned (95.4% return rate). The characteristics of the respondents were examined by population statistics analysis, and the chefs' cost consciousness, food materials satisfaction, and job satisfaction were examined by descriptive statistics after reliability and propriety analyses. The degree of cost consciousness in the respondents was very high and this degree of consciousness proved to have a partially significant impact on the degree of food materials management. That is when the chefs were more conscious about cost, the degree of food materials management was high. This implies that food materials satisfaction can be enhanced by enhancing the degree of food materials management. Job satisfaction also had a partially significant, influence on the degree of food materials management. Therefore, it is necessary to maintain consistency in the quality and inspection of food materials, provide related information, enhance the satisfaction level for standards of food materials and improve policies for welfare and career after retirement in order to enhance the job satisfaction of chefs and subsequently reduce costs in relation to the level of food materials management.

  • PDF

A study on a schedule-cost analysis model for defense R&D project planning (국방 R&D프로젝트의 일정-비용분석모델의 연구)

  • 황홍석;류정철;정덕길
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.213-216
    • /
    • 1996
  • R'||'&'||'D project management is a process of decisions concerned with the achievement of goals of objectives. Especially, defense R'||'&'||'D project planning is the key in the successfull management of defense development. The defense project managers are constantly having to perform "what if\ulcorner" exercise, such as what if the project is extended out for an additional cost\ulcorner In this reserch, we developed a schedule-cost analysis model based upon Critical Path Method(CPM) and Venture Evaluation and Review Technique(VERT) for schedule-cost trade off analysis defense R'||'&'||'D projects. In the first step, a deterministic model is developed as a heuristic which deterministic model is developed as a heuristic which determines the schedule extension and reduction cost as a function desired schedule. In the second step, a stochastic network simulation model is developed to analyse the project risk (sucess and failure). The expected time and cost can be determined for desired schedule under the assumptions of stochastic arc data (time and cost) with a various precedence relationships. This model provides the defense R'||'&'||'D managers with an estimated and expected cost for curtailing or extending a project a given amount of time. The effectiveness and efficiency of the proposed methods, a heuristic and stochastic networks simulations, have been demonstrated through examples.

  • PDF

The Use of Particle Swarm Optimization for Order Allocation Under Multiple Capacitated Sourcing and Quantity Discounts

  • Ting, Ching-Jung;Tsai, Chi-Yang;Yeh, Li-Wen
    • Industrial Engineering and Management Systems
    • /
    • v.6 no.2
    • /
    • pp.136-145
    • /
    • 2007
  • The selection of suppliers and the determination of order quantities to be placed with those suppliers are important decisions in a supply chain. In this research, a non-linear mixed integer programming model is presented to select suppliers and determine the order quantities. The model considers the purchasing cost which takes into account quantity discount, the cost of transportation, the fixed cost for establishing suppliers, the cost for holding inventory, and the cost of receiving poor quality parts. The capacity constraints for suppliers, quality and lead-time requirements for the parts are also taken into account in the model. Since the purchasing cost, which is a decreasing step function of order quantities, introduces discontinuities to the non-linear objective function, it is not easy to employ traditional optimization methods. Thus, a heuristic algorithm, called particle swarm optimization (PSO), is used to find the (near) optimal solution. However, PSO usually generates initial solutions randomly. To improve the PSO solution quality, a heuristic procedure is proposed to find an initial solution based on the average unit cost including transportation, purchasing, inventory, and poor quality part cost. The results show that PSO with the proposed initial solution heuristic provides better solutions than those with PSO algorithm only.

Optimal Design of Location Management Using Particle Swarm Optimization (파티클군집최적화 방법을 적용한 위치관리시스템 최적 설계)

  • Byeon, Ji-Hwan;Kim, Sung-Soo;Jang, Si-Hwan;Kim, Yeon-Soo
    • Korean Management Science Review
    • /
    • v.29 no.1
    • /
    • pp.143-152
    • /
    • 2012
  • Location area planning (LAP) problem is to partition the cellular/mobile network into location areas with the objective of minimizing the total cost in location management. The minimum cost has two components namely location update cost and searching cost. Location update cost is incurred when the user changes itself from one location area to another in the network. The searching cost incurred when a call arrives, the search is done only in the location area to find the user. Hence, it is important to find a compromise between the location update and paging operations such that the cost of mobile terminal location tracking cost is a minimum. The complete mobile network is divided into location areas. Each location area consists of a group of cells. This partitioning problem is a difficult combinatorial optimization problem. In this paper, we use particle swarm optimization (PSO) to obtain the best/optimal group of cells for 16, 36, 49, and 64 cells network. Experimental studies illustrate that PSO is more efficient and surpasses those of precious studies for these benchmarking problems.

Emergy evaluation of the optimum number of stories of new apartment buildings (아파트의 적정 건설층수 결정을 위한 에머지(emergy)평가)

  • Im Jung-Hyuk;Kang Dae-Seok;Lee Suk-Mo
    • Journal of Environmental Science International
    • /
    • v.14 no.5
    • /
    • pp.473-480
    • /
    • 2005
  • The cost of the construction and management of new apartment buildings was evaluated using a monetary analysis and an emergy concept to provide a new perspective regarding the housing policy of Korea. The systems of analyses were typical apartment buildings with an area of $76.03m^2$ per household in Korea built on the same size of land area. Three apartment buildings with different stories were evaluated and compared; 5-story, 15-story, and 20-story apartment buildings. The durable years of those apartments were assumed to be 40 years. The total cost of the construction and management of an apartment building was divided into three categories of construction, land purchase, and management. A 20-story apartment showed the highest cost and a 15-story apartment the lowest in the monetary cost analysis. In contrast, the emergy evaluation revealed a different pattern in the cost of construction and management, the cost increasing from a 5-story apartment to a 20-story one. This means that the higher the apartment constructed, the greater the cost in terms of real wealth. This result suggests that new evaluation methodologies like the emergy analysis should be used together with the monetary analysis to provide better insights on the national housing policy.

The Development of Probabilistic Time and Cost Data: Focus on field conditions and labor productivity

  • Hyun, Chang-Taek;Hong, Tae-Hoon;Ji, Soung-Min;Yu, Jun-Hyeok;An, Soo-Bae
    • Journal of Construction Engineering and Project Management
    • /
    • v.1 no.1
    • /
    • pp.37-43
    • /
    • 2011
  • Labor productivity is a significant factor associated with controlling time, cost, and quality. Many researchers have developed models to define methods of measuring the relationship between productivity and various parameters such as the size of working area, maximum working hours, and the crew composition. Most of the previous research has focused on estimating productivity; however, this research concentrates on estimating labor productivity and developing time and cost data for repetitive concrete pouring activity. In Korea, "Standard Estimating" only entails the average productivity data of the construction industry, and it is difficult to predict the time and cost spent on any particular project. As a result, errors occur in estimating duration and cost for individual activities or projects. To address these issues, this research sought to collect data, measure productivity, and develop time and cost data using labor productivity based on field conditions from the collected data. A probabilistic approach is also proposed to develop data. A case study is performed to validate this process using actual data collected from construction sites. It is possible that the result will be used as the EVMS baseline of cost management and schedule management.