• Title/Summary/Keyword: management cost

Search Result 8,713, Processing Time 0.037 seconds

A Case Study on Activity-Based Costing for a hospital (전통적 원가계산과 활동기준 원가계산의 비교연구)

  • Jung, Yong-Mo;Yang, Dong-Hyun;Lee, Yong-Chul;Leem, Bock-Hee
    • Korea Journal of Hospital Management
    • /
    • v.10 no.1
    • /
    • pp.25-47
    • /
    • 2005
  • This study was purposed to find out the difference of the accounting of practical cost between the ABC system and the traditional costing system applied in a hospital, to verified general effect of ABC. Methods: This case study deals with the method of calculation, the cost information that is produced at K hospital in Busan. To examine ABC system and traditional costing system, applying them to the clinical pathology, radiology, physics in K hospital. Results: As a result of costing analysis, it is showed maximum difference of 50% between ABC and traditional cost. compared in revenue center, it occurs the difference of 15% of them. considering the result, it is confirmed that ABC could be used as a means to offer more precise information. therefore, ABC makes possible to produce precise costing information and grasp the driver of cost, and it is possible to reduce cost effectively. Conclusion: ABC provide six benefits: (1) more accurate of service delivered (2) inproved pricing and contracting strategies (3) improved management decision making capability (4) greater ease of determining relevant costs (5) reduced nonvalue added costs.

  • PDF

Development of Time-Cost Models for Building Construction Projects in Bangladesh

  • Rahman, MD. Mizanur;Lee, Young Dai;Ha, Duy Khanh;Chun, Yong Hyun
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.3
    • /
    • pp.13-20
    • /
    • 2014
  • Estimating time and cost is an important mission in the early phase of a construction project, especially in feasibility study. It provides a foundation for making decision whether or not the project is performed on schedule and within budget. Thus, reliability of this estimate plays a key role in measuring the success of a project. This study was carried out to investigate the time-cost relationship in building construction projects in Bangladesh. The mathematical equation used in this study is based on Bromilow's equation. The research data were collected from sixty-three completed building projects through questionnaire survey. Type of clients, type of projects, and tender methods are the project characteristics considered in this study. The results of analysis indicated that the Bromilow's time-cost (BTC) models developed for each project characteristic are appropriate due to quite high coefficient of determination and relatively small mean percent errors. Among them, the forecasted model for time and cost according to tender methods is the best fit model. It is concluded that the BTC model could be applied in building construction project to predict its time and cost in Bangladesh. Four different regression models were also developed in this study. The results of BTC model between some selected countries were compared to gain the comprehensive view.

Cost benefit analysis of introducing domestic food waste disposers on waste and sewage management systems (가정 내 주방용 디스포저 도입에 따른 사회적 비용편익 분석)

  • Ahn, Jong-Ho
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.26 no.4
    • /
    • pp.513-520
    • /
    • 2012
  • The use of food waste disposers (FWDs) can be an emerging option to manage organic food wastes in municipal sewage system. The cost-benefit analysis (CBA) of introducing domestic FDWs is conducted to access the allowable disposer market price and the economic impact on food waste management from conventional solid waste management system. If the convenience value of 10,000 won/month is taken into consideration based on survey results, the introduction of FDWs can lead to net economic benefits, allowing the capital cost of disposer up to 1,000,000 won/unit. Without the consideration of convenience value, the introduction of FWDs becomes profitable if the capital cost of disposer is less than 50,000 won/unit. In case that the value of convenience is more than 7,000 won/month, the reduction of food waste management cost is not valid for the introduction of FWDs to be non-profitable. However, if environmental externalities are considered, the proposed system could become breakeven with the cost of food waste management decreases by 54 % (60,000 won per ton).

Measuring a Value of Contract Flexibility in the Third-Party Warehousing

  • Park, Chul-Soon;Kim, Bo-Won
    • Management Science and Financial Engineering
    • /
    • v.15 no.1
    • /
    • pp.1-31
    • /
    • 2009
  • This paper considers the value of warehousing contract under probabilistic demands. We consider a supply chain consisting of a supplier, a retailer and its third-party warehousing partner who provides the warehousing service to the retailer through an outsourcing contract. A typical contract is specified by initial space commitment and modification schedule. The retailer decides the order quantity for the supplier and space commitment for the outsourcing contract. Since there is close relationship between order quantity and space commitment to minimize the total cost including ordering cost, inventory carrying cost, shortage cost, and warehousing cost, we develop an analytical model under probabilistic demands, where the retailer can determine the optimal order size and space commitment level jointly. We found the closed-form optimum for a single-period case and the optimal conditions for a two-period case. To evaluate the value of contract flexibility for the two-period case, we compared the total cost under two policies; one with modification, under which the base commitment can be changed at the start of each period and the other without modification. From results of our numerical analysis, we showed that the modification policy is more cost-effective as the variability of demand increases.

THE EFFICIENT ESTIMATE OF ENVIRONMENTAL MANAGEMENT COSTS IN THE CONSTRUCTION SITES

  • Hyuk Moon;Sung-Jin Kim;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.437-446
    • /
    • 2005
  • Recently as people's values are changing from development phase into running stage after quality of life, so that the needs of environmentally friendly construction are gradually increasing. Also populace discontent about the pollution during construction process such as the noise and vibration caused by construction machinery is increasing. Even though it is impossible to eliminate the construction pollution fully, it is necessary to make efforts to reduce construction pollution to a minimum. In terms of construction site operating, the first possible step for solving these matters directly is that the necessary sum of expenses must be secured as the environmental management costs in the conceptual phase. However, in fact, the environmental management costs have not been secured in the budget. Generally it is the major reason not arising proper activities to prevent the pollution in the construction site. The purpose of this research is to suggest the efficient budgeting method regarding Environmental management costs to ensure the necessary sum of environmental management expenses. To provide an efficient budgeting method, interviews with the person in charge of environment management was conducted. 78 construction sites was surveyed and environmental management costs were analyzed through their historical data from the survey. According to the results of analysis, the ratio of environmental management costs is revealed 0.45% of construction cost as average comparing 0.2% of legal limit. And usually the environmental management cost was appropriated into the safety management budget. So it is needed to isolate environmental management budget securely and modify the ratio of Environmental conservation Costs in Construction Technology Management Act.

  • PDF

Global Trade Management Strategies for Export Companies from the Supply Chain Management Perspective (공급사슬관점에서 수출기업의 글로벌 무역관리 전략)

  • Yang, Jung-Ho
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.35
    • /
    • pp.179-219
    • /
    • 2007
  • Cross-border supply chains undergone complexity in the global trade process, unpredictability and continually evolving regulations and information requirements. Under these circumstances, longer lead time inhibiting quick response to market demands, unanticipated supply chain costs eroding product cost savings, compliance and documentation errors causing delays and fines are challenging global trade companies when they execute global business. These problems are mainly caused by unautomated, unintegrated process which lead to longer and more unpredictable lead times, slower cash flow, cost overruns, and ultimately lower profits and less satisfied customers. Complex and unpredictable global trade environment requires global trade companies of global trade management functions to automate and control this complex environment for driving out cost, time and risk from their business. Global trade management allows cost savings, supply chain efficiencies and improved compliance through improving global supply chain visibility, facilitating cash flow by supply chain financing, enhancing supply chain security and risk management.

  • PDF

Work Management Model to Integrate Schedule and Bill of Quantity (산출내역서.공정 통합관리 모형 구축에 관한 연구)

  • Park, Hong-Tae;Park, Chan-Jeong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.4
    • /
    • pp.153-161
    • /
    • 2002
  • Recently our government operates earned value management system (EVMS) for improving work management system of the construction projects over specific scale. The EVMS is based on the integrated management between construction cost and schedule. the existing systems, however, are focused on the cost management by using work quantity. This study suggests a work management model to integrate construction cost with activity information. The model introduces a work task concept as a tool that can connect construction rest to activity information. The suggested model in this study is verified by using actual data for the applicability to practical construction projects.

Analysis of the Work and Cost of Supervisor in the Public Construction Corporation (공공발주처의 공사감독 업무영역과 비용 분석)

  • Cho Seong-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.146-152
    • /
    • 2003
  • In the construction project, construction supervisor influences greatly the construction managements such as process management, quality management, safety management, and cost management. Therefore, from the first stage of the project, the managing activities of the supervisor are consistently needed. But the assesment of supervisor's work and cost has not been made enough in the public construction project. And there have been doubts as to whether a supervisor can take a consistent managing activity from the early stage of the project. Accordingly, the works between Korean supervisor and foreign supervisor in their public corporations are analyzed and compared in this paper. And the evaluation is made each of the cost for supervisor and the cost for engineer as a substitute of supervisor in construction project. This study is believed to contribute to improving the supervisor's work and reducing the personnel expenses and construction indirect cost.

Cost Management of Ecotourism Programs: A Case Study of the Community Enterprises in Thailand

  • DUNGTRIPOP, Wilawan;SRISUWAN, Praphada
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.8 no.7
    • /
    • pp.181-193
    • /
    • 2021
  • Thailand's tourism industry contributed to over three trillion baht in 2019. Tourist attractions across Thailand attract tourists around the world with their natural scenery, lifestyles, and cultures, especially in those called "second-tier cities". Community enterprises play a vital role to drive the tourism industry to local areas. However, most community enterprises lack professional accounting knowledge. This research aims to provide guidelines for ecotourism cost management of community enterprises in Thailand. Participatory Action Research (PAR) was employed to investigate the current circumstances of the Banlaem enterprise by using in-depth interviews to identify problems in cost management. Then, the focus and small group meetings were organized to monitor and evaluate solutions. The results reveal that the cost of VIP-Two Days trip was generating the highest net profit and margin, followed by VIP-One Day trip, but net losses were detected on the Students-One Day trip, even though income was greater than the variable costs, revenues didn't cover fixed costs. Thus, accounting knowledge could be a major concern of these enterprises. They should systematically record revenues and expenses, set appropriate labor costs, reduce production costs by using seasonal seafood and make use of vegetables in their gardens, and price products according to their production costs.

Contingency and Management Reserves Estimation Method for Project Budget (프로젝트 예비비 편성 방법에 관한 연구)

  • Kwon, Hyukchun;Kang, Changwook
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.1
    • /
    • pp.17-24
    • /
    • 2016
  • Many organizations have transformed their business in order to survive and compete in the future. They generate projects by creating a vision, using strategies and objectives with funds aligning strategies and make efforts to complete them successfully because project success leads to business success. All projects have triple constraints such as scope, time, and cost to be completed. Project cost performance is a key factor to achieve project goals and which is mostly related with risks among various cost drivers. Projects require a cost estimation method to complete them within their budget and on time. An accurate budget cannot be estimated due to the uncertainties and risks. Thus some additional money should be funded in addition to the base budget as a contingency reserve for identified risks and a management reserve for unidentified risks. While research on contingency reserve for identified risks included in project budget baseline have been presented, research on management reserve for unidentified risks included in total project budget is still scarce. The lack of research on estimation method and role of the management reserve have made project managers little confidence to estimate project budget accurately with reasonable basis. This study proposes a practical model to estimate budgets including contingency and management reserves for not only project cost management but also to keep the balance of organization's total funds to maximize return on investments for project portfolio management. The advantages of the proposed model are demonstrated by its application to construction projects in Korea and the processes to apply this model for verification are also provided.