• Title/Summary/Keyword: maintenance model

Search Result 2,588, Processing Time 0.031 seconds

Modeling of Public Rental Co-op Housing Maintenance System Using UML (설문분석에 기초한 주민참여형 코업하우징 유지관리업무의 UML 모델링에 관한 연구)

  • Song, Kwang-Chul;Hwang, Young-Sam
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2009.11a
    • /
    • pp.278-283
    • /
    • 2009
  • Nowadays as public rental apartment increasing, a new national policy for the public rental apartment maintenance is needed. The co-op housing system can be considered as one of the solutions for that needs, as our socio-economical environment changes. This research is on development of the co-op housing maintenance system. The feasibility of the co-op housing maintenance system has been analysed, and an preliminary UML model for the system has been proposed. Research focus is on how the model can be well established from the analysis of a questionnaire survey.

  • PDF

A Study on cost expenditure characteristics and importance level of each maintenance item of public office buildings by conducting cost surveys (공공업무시설의 수선비 조사를 통한 연차별 비용변화 패턴 및 수선비 항목별 발생빈도와 평균비용 분석)

  • Choi, Seok Kyoo;Kim, Gap Youl
    • KIEAE Journal
    • /
    • v.8 no.1
    • /
    • pp.111-118
    • /
    • 2008
  • To maintain the public office buildings, the related government employee uses cost under the limited budget. it is difficult to execute the budget as is assigned to maintenance items with contemplating the characteristics such as frequency, cost/item, weighting factor, and etc. As a precedent study about this cost-efficiency model, this study is intended to show the expenditure trends, frequencies, and cost distributions of maintenance items for the development of cost-efficiency model by analyzing time series data from the surveys on maintenance costs of the selected public office buildings.

Analysis of the Exercise Behavior of Early Adulthood : an Application of Transtheoretical Model(TTM) (범이론적 모형에 근거한 성인의 운동실천행위 분석)

  • Kim, Hye-Gyeong
    • Journal of Korea Association of Health Promotion
    • /
    • v.3 no.2
    • /
    • pp.189-198
    • /
    • 2005
  • This study examined the applicability of the transtheoretical model(TTM) to understanding exercise behavior of early adulthood. A cross-sectional study was conducted and data wee collected from 1618 adults aged from 20 to 39 through internet survey. Major conclusions wee as follows: 1. Stage distribution for exercise behavior was 15.6%, 26%, 25%, 19%, 14.4% for precentemplation, contemplation, preparation, action, maintenance stages, respectively. 2. Behavioral processes were more frequently utilized than cognitive processes for action and maintenance stage. 3. Self-reevaluation, social liberation and reinforcement were frequently used in precontemplation, contemplation and preparation stages. Self-reevaluation, reinforcement, self-liberation were frequently used in action and maintenance stages. 4. Pros of exercise behavior began to be higher than cons of exercise behavior from the actions stage and continued to increase to maintenance stage. 5. Self-efficacy was higher in action stage than precontemplation, contemplation and preparation stages and the highest in maintenance stage.

  • PDF

Control system modeling of stock management for civil infrastructure

  • Abe, Masato
    • Smart Structures and Systems
    • /
    • v.15 no.3
    • /
    • pp.609-625
    • /
    • 2015
  • Management of infrastructure stock is essential in sustainability of society, and its analysis and optimization are studied in the light of control system modeling in this paper. At the first part of the paper, cost of stock management is analyzed based on macroscopic statistics on infrastructure stock and economical growth. Stock management burden relative to economy is observed to become larger at low economic growth periods in developed economies. Then, control system modeling of stock management is introduced and by augmenting maintenance actions as control input, dynamic behavior of stock is simulated and compared with existing time history statistics. Assuming steady state conditions, applicability of the model to cross sectional data is also demonstrated. The proposed model is enhanced so that both preventive and corrective maintenance can be included as system inputs, i.e., feedforward and feedback control inputs. Optimal management strategy to achieve specified deteriorated stock level with minimal cost, expressed in terms of preventive and corrective maintenance actions, is derived based on estimated parameter values for corrosion of steel bridges. Relative cost effectiveness of preventive maintenance is shown when target deteriorated stock level is lower.

Cost Analysis Model with Minimal Repair of Spare Unit Repair Policy under Periodic Maintenance Policy (정기보전 제도에서 응급수리를 고려한 대체품 수리정책에서의 비용분석 모델)

  • Kim Jae-Joong
    • Journal of Applied Reliability
    • /
    • v.6 no.2
    • /
    • pp.151-161
    • /
    • 2006
  • This article is concerned with cost analysis model in periodic maintenance policy. The repair policy is differently applied according as unit importance during an item being used and unit restoration during an item being failed. So in this paper the repair policy with minimal repair is considered as follow : as the occurrence of failure between minimal repair and periodic interval time, unit is replaced by a spare unit until the periodic maintenance time arrived. Then total expected cost per unit time is calculated according to scale parameter of failure distribution in a view of customer's. The total expected costs are included repair and usage cost : operating, fixed, minimal repair, periodic maintenance and spare unit cost. Numerical example is shown in which failure time of item has Erlang distribution.

  • PDF

Predictive and Preventive Maintenance using Distributed Control on LonWorks/IP Network

  • Song, Ki-Won
    • International Journal of Safety
    • /
    • v.5 no.2
    • /
    • pp.6-11
    • /
    • 2006
  • The time delay in servo control on LonWorks/IP Virtual Device Network (VDN) is highly stochastic in nature. LonWorks/IP VDN induced time delay deteriorates the performance and stability of the real-time distributed control system and hinders an effective preventive and predictive maintenance. Especially in real-time distributed servo applications on the factory floor, timely response is essential for predictive and preventive maintenance. In order to guarantee the stability and performance of the system for effective preventive and predictive maintenance, LonWorks/IP VDN induced time delay needs to be predicted and compensated for. In this paper position control simulation of DC servo motor using Zero Phase Error Tracking Controller (ZPETC) as a feedforward controller, and Internal Model Controllers (IMC) based on Smith predictor with disturbance observer as a feedback controller is performed. The validity of the proposed control scheme is demonstrated by comparing the IMC based on Smith predictor with disturbance observer.

Impact of Maintenance Outage Rate Modeling on the Minimum Reserve Rate in Long-term Generation Expansion Planning (예방정비율(MOR) 모델링 방식이 수급계획의 최소설비예비율 산정에 미치는 영향)

  • Kim, Hyoungtae;Lee, Sungwoo;Kim, Wook
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.12
    • /
    • pp.1712-1720
    • /
    • 2017
  • In South Korea, minimum reserve rate, which is to satisfy reliability standard, has been determined by simulation result using WASP. But, it is still controversial whether the level of minimum reserve rate is adequate. Thus, in this study, various analyses of minimum reserve rate are being conducted. WASP uses the probabilistic simulation technique to evaluate whether reliability standard is satisfied. In this process, forced outage rate and maintenance periods of each generator play important roles. Especially, the long-term plan can be varied depending on how maintenance periods deal with. In order to model maintenance periods in the probabilistic simulation technique, WASP uses derating method. However, broad analyses have to be conducted because there are various ways including derating method to model maintenance periods which result in different results. Therefore, in this paper, 3 different maintenance outage rate modeling methods are applied to arbitrarily modeled system based on the basic plan for long-term electricity supply and demand of South Korea. Results show impact of each modeling method on minimum reserve rate.

Preventive Maintenance Model after Minimal Repair Warranty (최소수리보증 이후의 예방보전모형)

  • Jung, Ki-Mun
    • Communications for Statistical Applications and Methods
    • /
    • v.17 no.6
    • /
    • pp.865-877
    • /
    • 2010
  • This paper considers the periodic preventive maintenance model for a repairable system following warranty expiration. We consider three types of warranty policies: free repair warranty, pro-rata repair warranty, and combination repair warranty. Under these preventive maintenance models, we derive the expressions for the expected cycle length, the total expected cost, and the expected cost rate per unit time. In addition, we explain the optimal preventive maintenance period and the optimal preventive maintenance number by minimizing the expected cost rate per unit time. Finally, the optimal periodic preventive maintenance policy is given for a Weibull distribution case.

Maintenance-based prognostics of nuclear plant equipment for long-term operation

  • Welz, Zachary;Coble, Jamie;Upadhyaya, Belle;Hines, Wes
    • Nuclear Engineering and Technology
    • /
    • v.49 no.5
    • /
    • pp.914-919
    • /
    • 2017
  • While industry understands the importance of keeping equipment operational and well maintained, the importance of tracking maintenance information in reliability models is often overlooked. Prognostic models can be used to predict the failure times of critical equipment, but more often than not, these models assume that all maintenance actions are the same or do not consider maintenance at all. This study investigates the influence of integrating maintenance information on prognostic model prediction accuracy. By incorporating maintenance information to develop maintenance-dependent prognostic models, prediction accuracy was improved by more than 40% compared with traditional maintenance-independent models. This study acts as a proof of concept, showing the importance of utilizing maintenance information in modern prognostics for industrial equipment.

A Study on the Optimal Allocation of Maintenance Personnel in the Military Emergency Maintenance System Considering the Property of Impatience (Impatience 특성을 고려한 군 긴급정비시스템 정비인력 최적할당 연구)

  • Kim, Sungwoo
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.24 no.4
    • /
    • pp.449-456
    • /
    • 2021
  • Impatience characteristics are an important factor to be considered in the defense field, which is sensitive to time, but there are not many cases applied. In addition, due to the difficulty of analysis that must consider various probabilistic factors (breakdown/maintenance distribution, impatience characteristics, etc.), military decision makers consider only simple data (number of occurrences per year, maintenance time, etc.) Therefore, in this study, a model capable of analyzing the performance of the emergency maintenance system for determining the appropriate size and organization of military and civilian maintenance personnel was presented in consideration of impatience characteristics and probabilistic factors. And through numerical analysis, the appropriate size of the military and civilian emergency maintenance teams was analyzed. This study is significant in that it can improve readiness of operational power and prevent waste of defense budget through efficient operation of the military's emergency maintenance system.