• Title/Summary/Keyword: long-term failure analysis

Search Result 246, Processing Time 0.025 seconds

Estimation of the Characteristics of Delayed Failure and Long-term Strength of Granite by Brazilian Disc Test (압열인장시험을 이용한 화강암의 지연파괴특성 및 장기안정성 평가)

  • Jung, Yong-Bok;Cheon, Dae-Sung;Park, Eui-Seob;Park, Chan;Lee, Yun-Su;Park, Chul-Whan;Choi, Byung-Hee
    • Tunnel and Underground Space
    • /
    • v.24 no.1
    • /
    • pp.67-80
    • /
    • 2014
  • Long-term stability and delayed failure of granite were evaluated through the laboratory test based on Wilkins method and Brazilian disc test (BDT) which yields tensile strength, mode I fracture toughness and subcritical crack growth parameters. Then, the long-term strength of granite was estimated by using analytical models and long-term stability of compressed air-energy storage (CAES) pilot cavern pressurized up to 5 ~ 6 MPa was evaluated using numerical code, FRACOD with the determined subcritical crack growth parameters. The results of test and analyses showed that the subcritical crack growth index, n was determined as 29.39 and the inner pressure of 5 ~ 6 MPa had an insignificant effect on the long-term stability of pilot cavern. It was also found that the measurement and analysis of acoustic emission events can describe the accumulation of damage due to subcritical crack growth quantitatively. That is, AE monitoring can provide the current status of rock under loading if we make an identical installation condition in the field with that of the laboratory test.

Time-dependent reliability analysis of coastal defences subjected to changing environments

  • Chen, Hua-Peng
    • Structural Monitoring and Maintenance
    • /
    • v.2 no.1
    • /
    • pp.49-64
    • /
    • 2015
  • This paper presents a method for assessing the risk of wave run-up and overtopping of existing coastal defences and for analysing the probability of failure of the structures under future hydraulic conditions. The recent UK climate projections are employed in the investigations of the influence of changing environments on the long-term performance of sea defences. In order to reduce the risk of wave run-up and overtopping caused by rising sea level and to maintain the present-day allowances for wave run-up height and overtopping discharge, the future necessary increase in crest level of existing structures is investigated. Various critical failure mechanisms are considered for reliability analysis, i.e., erosion of crest by wave overtopping, failure of seaside revetment, and internal erosions within earth sea dykes. The time-dependent reliability of sea dykes is analysed to give probability of failure with time. The results for an example earth dyke section show that the necessary increase in crest level is approximately double of sea level rise to maintain the current allowances. The probability of failure for various failure modes of the earth dyke has a significant increase with time under future hydraulic conditions.

Case Study: Long-term Experiments on a Daily Activity Monitoring System for an Elderly Living Alone (사례 연구: 녹거노인 일상 활동 모니터링 시스템의 실제 주택에서의 장기간 실험)

  • Lee, Seon-Woo;Ok, Dae-Yoon;Jung, Phil-Hwan;Kim, Jeom-Keun
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.18 no.8
    • /
    • pp.738-743
    • /
    • 2012
  • This paper describes analysis of long-term experiments on a monitoring system to assess the daily activities of the elderly who live alone. The developed system is composed of an in-house sensing system and a server system. The in-house sensing system installed in their own houses is a typical wireless sensor network system including three kinds of wireless sensors. The server system has a database server and an assessment server. We have installed the system into an elderly house, collected data during over two years continuously, then analyze the data. From the analysis, we could measure the energy consumption profile of three kinds of sensor nodes. The experiment shows all kinds of nodes can operate over one year with two AA-size alkaline batteries. Using a measure of reliability of the monitoring system called 'deadzone', the system has showed the failure operation for 842 hours (4.66 %) during over 18,000 hours total operation period.

Experimental investigation of long-term characteristics of greenschist

  • Zhang, Qing-Zhao;Shen, Ming-Rong;Ding, Wen-Qi;Jang, Hyun-Sic;Jang, Bo-An
    • Geomechanics and Engineering
    • /
    • v.11 no.4
    • /
    • pp.531-552
    • /
    • 2016
  • The greenschist in the Jinping II Hydropower Station in southwest China exhibits continuous creep behaviour because of the geological conditions in the region. This phenomenon illustrates the time-dependent deformation and progressive damage that occurs after excavation. In this study, the responses of greenschist to stress over time were determined in a series of laboratory tests on samples collected from the access tunnel walls at the construction site. The results showed that the greenschist presented time-dependent behaviour under long-term loading. The samples generally experienced two stages: transient creep and steady creep, but no accelerating creep. The periods of transient creep and steady creep increased with increasing stress levels. The long-term strength of the greenschist was identified based on the variation of creep strain and creep rate. The ratio of long-term strength to conventional strength was around 80% and did not vary much with confining pressures. A quantitative method for predicting the failure period of greenschist, based on analysis of the stress-strain curve, is presented and implemented. At a confining pressure of 40 MPa, greenschist was predicted to fail in 5000 days under a stress of 290 MPa and to fail in 85 days under the stress of 320 MPa, indicating that the long-term strength identified by the creep rate and creep strain is a reliable estimate.

Simulation of Interface Ageing Effect of Suspension Insulator Using ANSYS (ANSYS를 이용한 현수애자의 계면팽창거동에 따른 특성 평가)

  • 우병철;한세원;조한구
    • The Transactions of the Korean Institute of Electrical Engineers C
    • /
    • v.52 no.8
    • /
    • pp.342-347
    • /
    • 2003
  • The suspension insulators are subjected to harsh environment in service for a long time. Long term reliability of the insulators is required for both mechanical and electrical performances. We studied an analysing method to find out a deformation of brittle porcelain with a thermal expansion of simulation analysis and experimental results show that cement volume growths affect severely to b mechanical failure ageing.

Stress Response of Cement Interface on Manufacturing Process of a Suspension Insulator (송전선용 현수애자 양생공정에서 발생하는 접착부의 응력변화)

  • Woo, Byung-Chul;Han, See-Won;Cho, Han-Goo
    • Proceedings of the KIEE Conference
    • /
    • 2003.07c
    • /
    • pp.1448-1450
    • /
    • 2003
  • The suspension insulators are subjected to harsh environment in service for a long time. Long term reliability of the insulators is required for both mechanical and electrical performances. We studied an analysing method to find out a deformation of brittle porcelain with a thermal expansion of simulation analysis and experimental results show that cement volume growths affect severely to be mechanical failure ageing.

  • PDF

Failure Characteristics of Cut Slopes of Shale in Ky ngsang Basin (경상분지 셰일 지역에서의 절토사면 파괴 특성)

  • 김경석;유병옥;이상돈
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.11b
    • /
    • pp.103-114
    • /
    • 2002
  • Stability of cut-slope is considered to have a deep relationship with rock types since rock has its own engineering and geological characteristic such as shear strength, durability, weathering profile, geological structures. Therefore, analysis of geological and engineering characterisics of rock mass is essential for the evaluation of rock slope stability This paper introduces the statistical data of slope failure cases which was collected from highway slopes constructed in sedimentary rock mainly of shale in Ky ng-sang Basin. Primary failure feature in this area is planar failure along the bedding regardless of slope geometry. Even a disasterous slope failure case due to the thick clay layer between the beddings was reported. Failures and rock fall were reported to ocurred frequently after the completion of cutting due to the weathering, so long-term slope stability should be considered as a important factors in design.

  • PDF

Long-term implant success at the Academy for Oral Implantology: 8-year follow-up and risk factor analysis

  • Busenlechner, Dieter;Furhauser, Rudolf;Haas, Robert;Watzek, Georg;Mailath, Georg;Pommer, Bernhard
    • Journal of Periodontal and Implant Science
    • /
    • v.44 no.3
    • /
    • pp.102-108
    • /
    • 2014
  • Purpose: Rehabilitation of the incomplete dentition by means of osseointegrated dental implants represents a highly predictable and widespread therapy; however, little is known about potential risk factors that may impair long-term implant success. Methods: From 2004 to 2012, a total of 13,147 implants were placed in 4,316 patients at the Academy for Oral Implantology in Vienna. The survival rates after 8 years of follow-up were computed using the Kaplan-Meier method, and the impact of patient- and implant-related risk factors was assessed. Results: Overall implant survival was 97% and was not associated with implant length (P=0.930), implant diameter (P=0.704), jaw location (P=0.545), implant position (P=0.450), local bone quality (P=0.398), previous bone augmentation surgery (P=0.617), or patient-related factors including osteoporosis (P=0.661), age (P=0.575), or diabetes mellitus (P=0.928). However, smoking increased the risk of implant failure by 3 folds (P<0.001) and a positive history of periodontal disease doubled the failure risk (P=0.001). Conclusions: Summing up the long-term results of well over 10,000 implants at the Academy for Oral Implantology in Vienna it can be concluded that there is only a limited number of patients that do not qualify for implant therapy and may thus not benefit from improved quality of life associated with fixed implant-retained prostheses.

Long-Term Results of Double Mitral and Aortic Valve Replacement (승모판과 대동맥판 중복치환환자의 장기임상성적)

  • 김종환
    • Journal of Chest Surgery
    • /
    • v.24 no.6
    • /
    • pp.541-546
    • /
    • 1991
  • The Ionescu-Shiley bovine pericardial xenograft valve was the most common cardiac substitute valve at Seoul National University Hospital. Since the follow-up extended for longer than 10 years, a total of and consecutive 107 patients with double mitral and aortic valve replacement using this valve from May 1979 to June 1984 were studied for the long-term clinical results. Their ages were 34.0$\pm$11.9 years at surgery, and eight patients died within 30 days of surgery with operative mortality rate of 7.5%. Ninety-nine early survivors were followed up for a total of 488.1 patient-years[Mean$\pm$SD, 4.9$\pm$2.7 years], and nine died with the linearlized late mortality rate of 1.84% /patient-year[pt-yr]. They experienced major complications: thromboembolism, 0.615% /pt-yr bleeding, 0.205% /pt-yr; endocarditis, l. 639%/pt-yr; overall valve failure, 6.146% /pt-yr; and primary tissue failure, 1.639%/ pt-yr. The actuarial survival rates were 91.4$\pm$2.9% and 89.6$\pm$3.4% at postoperative 5 and 10 years, and the probability of freedom from thromboembolism was 95.8$\pm$2.5% at 10 years. The primary tissue failure began to occur from postoperative 6 years and the probabilities of freedom from structural valve failure were 80.2$\pm$7.9% and 62.3$\pm$12.7% at 8 and 10 years after surgery respectively. Although there was increasing number of patients with valve tissue failure after 6 years, the evidence of expected premature and accelerated valve degeneration among young population was not clear on the age-related analysis. And, no definite cumulative patient groups beyond the various age limits could be suggested for or against the use of this valve.

  • PDF

A Short-Term Prediction Method of the IGS RTS Clock Correction by using LSTM Network

  • Kim, Mingyu;Kim, Jeongrae
    • Journal of Positioning, Navigation, and Timing
    • /
    • v.8 no.4
    • /
    • pp.209-214
    • /
    • 2019
  • Precise point positioning (PPP) requires precise orbit and clock products. International GNSS service (IGS) real-time service (RTS) data can be used in real-time for PPP, but it may not be possible to receive these corrections for a short time due to internet or hardware failure. In addition, the time required for IGS to combine RTS data from each analysis center results in a delay of about 30 seconds for the RTS data. Short-term orbit prediction can be possible because it includes the rate of correction, but the clock correction only provides bias. Thus, a short-term prediction model is needed to preidict RTS clock corrections. In this paper, we used a long short-term memory (LSTM) network to predict RTS clock correction for three minutes. The prediction accuracy of the LSTM was compared with that of the polynomial model. After applying the predicted clock corrections to the broadcast ephemeris, we performed PPP and analyzed the positioning accuracy. The LSTM network predicted the clock correction within 2 cm error, and the PPP accuracy is almost the same as received RTS data.