• 제목/요약/키워드: long tunnel excavation

검색결과 68건 처리시간 0.019초

벌크폭약을 이용한 대단면 장대터널 시공 사례 (The Construction of large and Long Tunnel Using Bulk Explosives)

  • 노상림;문상호;조영천;이상필;유지영
    • 화약ㆍ발파
    • /
    • 제22권3호
    • /
    • pp.65-70
    • /
    • 2004
  • 최근 신설되는 도로의 경우 고속화/직선화로 인하여 터널의 연장 및 평균터널 길이, 3차선이상의 대 단면 터널이 날로 증가하고 있어 이에 따른 굴착 효율 극대화가 필요한 시점에 있다. 사패산 터널은 약 4km의 4차선 대단면 도로터널로, 환경문제로 인해 늦춰진 공기를 단축시키기 위하여 터널 굴착 시 굴진효율에 가장 큰 영향요소인 굴진장과 여굴관리, 발파효율의 개선을 위한 다양한 신 공법이 적용되고 있다. 본 논문은 당 현장에서 시도되고 있는 신 공법 중, 새로운 형태의 폭약인 Bulk 폭약에 대하여 소개하고, Bulk 폭약의 대 단면 터널 적용에 대한 효율을 검증하고자 하였다.

굴착중인 장대터널 내 최적의 환기시스템에 관한 연구 (The Study on Optimum Ventilation System during Long Tunnel Construction)

  • 임한욱;오병화
    • 산업기술연구
    • /
    • 제26권A호
    • /
    • pp.3-15
    • /
    • 2006
  • To determine the optimum ventilation systems during long tunnel excavation, the velocity vector profile and the contaminant's distribution at working place are studied using 2-D, 3-D numerical analysis. The main results can be summarized as follow; In case of long tunnels, blower-exhaust-mixture types which enable to use soft blast ducts is most appropriate in terms of ventilation and economical efficiency. Of the same ventilation types, ventilation efficiency has a difference according to blast ducts and the distance between fan and working place. The 3-D numerical result shows that arranging blower and exhaust ducts in the right and left corners of the tunnel respectively is effective to discharge contaminant. The result of the real measurement shows that CO concentration can be reduced to below 50 ppm, which is regulation value, as 16-minutes fan operation goes on.

  • PDF

화산쇄설암 구간에서 터널 공사 중 장기변형거동 특성 연구 (The Characteristics of Long-term Deformation Behavior During Tunnel Excavation in the Pyroclastic Rock)

  • 장석명;한희수
    • 한국지반환경공학회 논문집
    • /
    • 제23권8호
    • /
    • pp.23-28
    • /
    • 2022
  • 우리나라 지형조건은 산악이 70%를 차지하고 있어 철도 및 도로공사 시 구조물이 차지하는 비중이 높다. 특히, 최근 들어 고속주행을 위한 고속철도와 고속도로 건설이 급증하고 있고 이와 더불어 터널 건설도 증가하고 있고 터널 굴착 완료 후 장기변형이 발생하는 터널 시공사례가 증가하는 추세이다. 이러한 터널 구조물의 안정성은 터널 굴착 주변 암반특성에 전적으로 좌우된다. 본 연구에서 대상인 화산쇄설암의 경우, 전반적으로 풍화에 취약하고 장기간에 걸쳐 강도가 저하되는 특성이 있어서 이를 고려한 터널 설계 및 시공계획 수립이 반드시 필요하다. 본 연구는 화산쇄설암 구간에 터널 현장에서 발생 된 과다변형 사례를 분석하여 향후 화산쇄설암 구간에서는 인버트 설치 및 하부보강을 고려한 방안을 제시하였다.

대단면 장대터널 공기단축 사례연구 (A Case Study of Minimizing Construction Time in Long and Large Twin Tube Tunnel)

  • 노상림;노승환;이상필;김문호;서정우
    • 터널과지하공간
    • /
    • 제15권3호
    • /
    • pp.177-184
    • /
    • 2005
  • 우리나라의 4차로 도로터널 중 가장 긴 약 4km의 병설 터널인 사패산터널은 환경단체의 민원에 의해 당초보다 약 2년 정도 공사가 지연되어 공사 기간을 단축하기 위한 시공 효율 극대화가 절실히 요구되었다. 본 고는 공기단축을 위해 적용된 사패산 터널의 굴진장 증대 방안, 굴착 공법 개선 방법, 그리고 막장전방 예측 시스템에 대한 사례 연구이다. 터널의 굴진장을 증대시키기 위해 Bulk-emulsion 폭약과 Cylinder-cut 심발패턴이 도입되었고, 터널 굴착 단면의 변경 및 최적의 굴착순서 계획을 통해서 공사기간을 단축할 수 있었다. 또한 대단면 터널의 안전한 시공을 위해서 막장관찰, TSP 탐사 및 고성능 천공장비를 이용한 막장전방 예측 System을 적용하였다.

터널 장공발파에서 굴진율 개선 및 작업공정 시간 단축 사례 (Case Study for the Improvement of Tunnel Advance Rate & the Time Reduction of Working Process in Long Hole Blasting About Tunnel Excavation)

  • 김희도;이준원;이하영
    • 화약ㆍ발파
    • /
    • 제31권2호
    • /
    • pp.32-39
    • /
    • 2013
  • 일반적으로 장공발파 방법은 과거 대규모 채탄막장이나 댐 기초굴착, 광산 등에서 행하여져 왔으나, 최근 우리나라에서 신설되는 토목터널에서 시공 효율성 및 경제성을 목적으로 많이 실시되고 있다. 고속국도제 600호선 부산외곽 고속도로 ${\bigcirc}$공구 또한 총연장 약 8km의 4차선 대단면 도로 터널로서 Type I, II, 4.4m 장공발파를 실시하는 현장이다. 그러나 당 현장에서는 발파 후 굴진율이 약 75%에 그쳐 발파 후속작업 시간에 영향을 미치게 되고 그로 인하여 전체 작업공정 시간이 증가하여 계획된 굴진을 못하는 현상이 자주 발생되었다. 본 논문에서는 당 현장에서 위 문제를 극복하기 위하여 실시된 장공발파 공법 중 천공경과 가장 밀장전 할 수 있는 ${\phi}36mm$폭약을 적용하여 굴진효율을 향상시키고 작업공정 시간을 단축시킨 사례를 소개하고자 한다.

실트질 지반에 굴착된 NATM 터널의 시공사례 연구 (A Case Study on Construction of a Tunnel Excavated in Silty Ground by the NATM)

  • 박종호;윤효석;박종인;이원규
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 1999년도 가을 학술발표회 논문집
    • /
    • pp.139-146
    • /
    • 1999
  • Geological and geotechnical surveys, in general, should precede the excavation to ensure the stability of the tunnel md should be followed up according to the various geological condition during the excavation. However actually the standard support patterns which were decided during the design phases used be insisted for the whole excavation phases in spite of the various geological conditions. When $\bigcirc$$\bigcirc$ tunnel was excavated up to 25m long, the severe displacement was generated in the Portal area of $\bigcirc$$\bigcirc$ tunnel and the tunnel face was pally collapsed. Therefore, this paper present the case study on construction associated with the Umbrella Arch Method used in silty ground by the NATM.

  • PDF

연약지반내 굴착터널의 안정성 평가 및 최적보강설계에 관한 연구 (Stability analysis of a tunnel excavated in weak rocks and the optimal design for the support pattern)

  • 최성웅;신희순
    • 터널과지하공간
    • /
    • 제7권3호
    • /
    • pp.191-201
    • /
    • 1997
  • Geological and geotechnical surveys, in general, should precede the excavation to ensure the safety of the tunnel and should be followed up according to the various geological condition during the excavation. However actually the standard support patterns which were decided during the design step used be insisted for the whole excavation steps in spite of the various geological conditions. OO tunnel was excavated with NATM and a support pattern type-V in weak rocks. When the tunnel was excavated up to 25m long, the severe displacement was generated in the portal area and the shotcrete was damaged to make the cracks and the tunnel face was totally collapsed. It might happen owing to the one-day heavy rain, but the exact reason for that accident should be found out and the new optimal support patternt needed. Consequently three dimensional numerical analysis was applied for the evaluation of the cause of the tunnel collapse instead of two dimensional analysis, because three dimensional analysis can show better the real field phenomenon than two dimensional analysis in which the load distribution methods are adopted for the tunnel excavation. We could simulate the actual situations with three dimensional finite difference code and propose the new optimal support patterns.

  • PDF

Deformation characteristics of surrounding rock in the intersection area between main tunnel and construction adit of the Xianglushan tunnel

  • Yunjuan Chen;Mengyue Liu;Fuqiang Yin;Lewen Zhang;Jing Wu;Jinrui Li
    • Geomechanics and Engineering
    • /
    • 제38권1호
    • /
    • pp.1-13
    • /
    • 2024
  • The construction adit plays a pivotal role in enhancing the working face during the excavation of long-distance and deep hydraulic tunnels. However, the intersection zone between the main tunnel and the construction adit exhibits more intricate deformation patterns in surrounding rock, posing a significant threat to stability during excavation. Taking the Xianglushan tunnel in Yunnan Province, China, as a case study, the FLAC3D software is employed to simulate the excavation process at the intersection. The simulation results are verified combined with the field deformation monitoring results, and the spatial distribution of tunnel rock deformation in the intersection area are analyzed. Five excavation conditions with different intersection angles are simulated, and the surrounding rock deformation of the tunnel intersection area with different intersection angles is analyzed, and its influence range is discussed. The results show that: (1) The surrounding rock deformation in the intersection area increases rapidly during the tunnel excavation. With the increase of construction distance, the deformation of intersection area is gradually stable. (2) The deformation distribution of the tunnel rock is uneven, and the deformation of main tunnel near the intersection area is larger than that far away from the intersection area. (3) With the increase of the intersection angle, the surrounding rock deformation of the tunnel intersection and its influence range decreases gradually. The research results have certain guiding significance for the construction safety of the tunnel intersection area.

한강 하저터널에서의 암반분류 및 평가사례

  • 박남서;이치문;김은섭
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2003년도 암반역학위원회 학술세미나 논문집
    • /
    • pp.165-193
    • /
    • 2003
  • The Han River tunnel connecting Yoido and Mapo was constructed as a part of the Seoul subway line No.5, which is 52 km long, to improve the traffic conditions of Seoul. It is constructed 15.6∼30m below the river floor. It Is the first under-river tunnel in Korea with the length of 1,288m. Geological conditions of the ground under the Han River were more complex and irregular than expected at the design stage, because there were several faults, fracture zones and slickensided joints coated with graphite. It was thus indispensable to estimate the ground condition of the tunnel face to apply proper excavation and reinforcement methods. Advance borings and face mappings were performed before excavation to improve constructional efficiency and excavation stability.

  • PDF

양생중인 콘크리트에서의 발파진동의 영향 시험방법에 대한 연구 (A Study on Experimental Method of Blasting Vibration in Curing Concrete)

  • 김장득;김용하
    • 지질공학
    • /
    • 제19권3호
    • /
    • pp.417-422
    • /
    • 2009
  • 최근 건설되는 터널은 장대화될 뿐만아니라 파쇠대 등의 불량한 지반을 통과하는 사례가 많아지고 있다. 지반 강도가 좋지 않을 때는 터널의 소성변형이 일어나고 때로는 붕락하는 사례도 발생한다. 지금까지의 터널시공방식은 굴착작업이 완료된 후에 라이닝콘크리트를 타설하는 순차적 시공방법이었다. 이 방법은 공사기간이 길고 비용이 많이 들어갈 뿐만 아니라 파쇄대나 소성지반에서 굴착후 장기간 방치했을 때, 터널의 안정을 기대하기 어려운 경우도 있다. 이에 따라 양북터널에서는 터널굴착과 라이닝콘크리트를 동시에 시공하여 공사기간 단축은 물론 심한 파쇄대구간에서 터널을 조기에 안정시키기 위해 동시시공을 계획하게 되었다. 동시시공을 위한 사전 검토사항으로서 발파굴착과 동시에 콘크리트를 타설했을 때 발파진동이 라이닝콘크리트의 강도에 미치지 않는 안전한 이격거리를 산출하기 위한 시험을 현장에서 시행하였다. 또한 동시시공을 위한 라이닝폼의 개선과 콘크리트 타설방법 개선, 집진기를 이용한 환기방식의 개선과 설비의 재배치 등을 동시에 시행하였다.