• Title/Summary/Keyword: lining system

Search Result 244, Processing Time 0.025 seconds

A Study on Thermal Analytical Model for a Dry Dual Clutch (건식 듀얼 클러치의 열해석 모델에 대한 연구)

  • Liu, Hao;Lee, J.C.;Noh, Y.J.;Cho, J.H.;Lee, H.R.;Koh, J.E.;Kang, J.W.
    • Journal of Drive and Control
    • /
    • v.12 no.1
    • /
    • pp.1-8
    • /
    • 2015
  • The stability of friction characteristics and thermal management for a dry type dual clutch transmission (DCT) are inferior to those of a wet clutch. Too high temperature resulting from frequent engagement of DCT speeds up degradation or serious wear of the pressure plate or burning of the clutch disk lining. Even though it is significantly important to estimate the temperature of a dry double clutch (DDC) in real-time, few meaningful study of the thermal model of DDC has been known yet. This study presented a thermal analytical model of lumped parameters for a DDC by analyzing its each component firstly. Then a series of experimental test was carried out on the test bench with a patented temperature telemetry system to validate the proposed thermal model. The thermal model, whose optimal parameter values were found by optimization algorithm, was also simulated on the experimental test conditions. The simulation results of DDC temperature show consistency with the experiment, which validates the proposed thermal model of DDC.

The design of outlet in inter-cross slope with tunnel which it applied forming artificial ground (인공지반을 적용한 사교하는 사면에서의 터널 갱구부 설계)

  • Park, Chal-Sook;Kwan, Han;Lee, Kyu-Tak;Kim, Bong-Jae;Yun, Yong-Jin;Kim, Kwang-Hee
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.1532-1548
    • /
    • 2008
  • The tunnel type spillways is under construction to increasing water reservoir capacity in Dae-am dam. The tunnel outlet was planned to be made after installing slope stabilization system on natural slope there. Generally, the tunnel outlet is made perpendicularly to the slope, but in this case, it had to be made obliquely to the slope for not interrupting flow of river. Because of excavation in condition of natural slope caused to deflecting earth pressure, the outlet couldn't be made. So, artificial ground made with concrete that it was constructed in the outside of tunnel for producing the arching effect which enables to make a outlet. We were planned tunnel excavation was carried out after artificial ground made. Artificial ground made by poor mix concrete of which it was planned that the thickness was at least 3.0m height from outside of tunnel lining and 30cm of height per pouring. Spreading and compaction was planned utilized weight of 15 ton roller machine. In order to access of working truck, slope of artificial ground was designed 1:1.0 and applied 2% slope in upper pert of it for easily drainage of water. In addition to, upper pert of artificial ground was covered with soil, because of impaction of rock fall from upper slope was made minimum. The tunnel excavation of the artificial ground was designed application with special blasting method that it was Super Wedge and control blasting utilized with pre-percussion hole.

  • PDF

Development of FBG Accelerometer for Railway Tunnel Vibration (철도터널 진동 모니터링을 위한 광섬유 가속도계 개발)

  • Lee, Su-Hyung;Shin, Min-Ho;Kim, Hyun-Ki;Lee, Kyu-Wan
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.4
    • /
    • pp.364-369
    • /
    • 2011
  • For the safety management of tunnel, effective measurements should be continuously carried out. Most of sensors currently being applied for tunnels measure only the local status, thus many of them are needed to monitor an entire tunnel. For the railway tunnel where trains of same conditions are regularly operated, dynamic responses of tunnel structure to train operations can be a good index to estimate the deformation of tunnel structure in wide area. Meanwhile, the electromagnetic interference caused by overhead centenary in railway tunnel obstructs the use of electric-based sensors. In this study a brand new accelerometer using FBG optical fiber sensors is developed to solve these problems. Sensitivity and capacity of the accelerometer are enhanced with effective structural design of its components and verified with laboratory tests. A case history where the developed accelerometers were applied to a safety monitoring system of a high-speed train tunnel is presented. The performances of the developed accelerometers are validated from the measured acceleration data.

The Effect of Fluid Shear Stress on Endothelial Cell Adhesiveness to Modified Polyurethane Surfaces

  • Gilson Khang;Lee, Sang-Jin;Lee, Young-Moo;Lee, Jin-Ho;Lee, Hai-Bang q
    • Macromolecular Research
    • /
    • v.8 no.4
    • /
    • pp.179-185
    • /
    • 2000
  • Generally vascular grafts with a relatively large inner diameter (> 5 mm) have been successfully employed for replacement in the human body. However, the use of small diameter grafts is limited, because these grafts rapidly occlude due to the thrombosis. The ideal blood-contacting surface of a prosthesis would be an endothelial cell (EC) lining, because the confluent monolayer of healthy ECs that culture natural blood vessels represents the ideal nonthrombogenic surface. For vascular graft application, the stable EC adhesion on surface under How conditions is very important. In this study, the adhesive strength of ECs attached on polymer surfaces coated with collagen type IV (Col IV), fibronectin (Fn), laminin (Ln), and treated with corona was investigated onto polyurethane (PU) films. The EC-attached PU surfaces were mounted on parallel-plate flow chambers in a How system prepared for cell adhesiveness test. Three different shear stresses (100, 150, and 200 dyne/㎠) were applied to the How chambers and each shear stress was maintained for 120 min to investigate the effect of shear stress and surface treatment condition on the EC adhesion strength. It was observed that the EC adhesion strength on the surface-modified PU films was in the order of Ln≡Fn > Col IV > corona 》 control. More than 70% of the adhered cells were remained on surface-modified PU surface after applying the shear stress,200 dyne/㎠ for 2 hrs, whereas the cells were completely detached on the control PU surface within 10 min after applying the same shear stress. It seems that the type of adsorbed proteins and hydrophilicitv onto the PU surfaces play very important roles for cell adhesion strength.

  • PDF

Multiple-Silo Performance Assessment Model for the Wolsong LILW Disposal Facility in Korea - PHASE I: Model Development (월성 중저준위 처분시설 다중사일로 안정성 평가 모델 - 1단계: 모델개발)

  • Lim, Doo-Hyun;Kim, Jee-Yeon;Park, Joo-Wan
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.9 no.2
    • /
    • pp.99-105
    • /
    • 2011
  • An integrated model for groundwater flow and radionuclide transport analyses is being developed incorporating six underground silos, an excavated damaged zone (EDZ), and fractured host rock. The model considers each silo as an engineered barrier system (EBS) consisting of a waste zone comprising waste packages and disposal container, a buffer zone, and a concrete lining zone. The EDZ is the disturbed zone adjacent to silos and construction & operation tunnels. The heterogeneity of the fractured rock is represented by a heterogeneous flow field, evaluated from discrete fractures in the fractured host rock. Radionuclide migration through the EBS in silos and the fractured host rock is simulated on the established heterogeneous flow field. The current model enables the optimization of silo design and the quantification of the safety margin in terms of radionuclide release.

A Numerical study on the Moisture Transport of Concrete Tunnel Linings with the Sprayable Waterproofing Membrane (뿜칠 방수 멤브레인이 시공된 터널 라이닝의 수분이동에 관한 수치해석 연구)

  • Lee, Chulho;Choi, Soon-Wook;Kang, Tae-Ho;Chang, Soo-Ho
    • Tunnel and Underground Space
    • /
    • v.26 no.3
    • /
    • pp.212-219
    • /
    • 2016
  • The sprayable waterproofing membrane is installed between shotcrete to provide crack bridging and hence prevent flow of liquid water as a waterproofing system. Because of its material characteristics, the sprayable membrane can be constructed at more complex structure than sheet membrane. The main component of the sprayable waterproofing membrane is a polymer-based material, therefore, moisture can migrate through sprayable waterproofing membrane materials by capillary and vapor diffusion mechanisms. The moisture transport mechanisms can have an influence on the degree of saturation and may influence the pore pressure and risk of freeze-thaw damage on concrete linings and membrane. In this study, long-term hygrothermal behavior was simulated with considering moisture transport and long-term effects on saturation of tunnel linings. From the simulation, due to water absorption and vapor transport properties of sprayable membrane, change of relative humidity and water content in tunnel lining can be evaluated.

An Experimental Study on the Durability and Load Carrying Capacity of RC Structure Repair System Using FR-ECC (고인성 내화보수모르터(FR-ECC)를 활용한 RC 구조물 보수공법의 내구성능 및 내하력에 관한 실험적 연구)

  • Kim, Jeong Hee;Lim, Seung Chan;Kim, Jae Hwan;Kwon, Yung Jin
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.16 no.2
    • /
    • pp.75-86
    • /
    • 2012
  • This paper presents some research results on the shrinkage characteristics and frost resistance before and after cracking of FR-ECC(Fire Resistance-Engineered Cementitious Composite). Also, a waterstop performance and exfoliating resistance of multi-layer lining specimens using FR-ECC and flexural performance of beam member by repaired FR-ECC are estimated in this paper. Experimental results indicate that the plastic shrinkage crack and length change ratio of FR-ECC have been reduced as compared with that of the existing repair mortar, and that its crack resistance on the dry shrinkage is improved under the confining stress. As well as FR-ECC has been great in the frost resistance and its tensile properties under the cracked state have been not reduced by freezing and thawing reaction. In addition, beam member by repaired FR-ECC have been increased in the flexural properties such as initial crack moment, yeild moment, and its crack width has been controled in a stable by the frexural failure.

A study on establishment of measurement and analysis frequency of maintenance monitoring in tunnel (터널 유지관리계측의 측정 및 분석주기 설정 연구)

  • Woo, Jong-Tae;Lee, Kang-Il
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.14 no.2
    • /
    • pp.117-129
    • /
    • 2012
  • In this study, research was performed to establish the measurement and frequency of analysis for maintenance monitoring by investigation of tunnel maintenance monitoring system in the tunnel which was installed in the Seoul metro line 5, 7 and 8, using that the domestic and foreign application case, results of analyzed maintenance monitoring in the domestic tunnel and legal safety management standard of the facility. The results of the monitoring management about analysis frequency to the present are considered that the problem about measuring frequency does not occur. According to the analysis results of the maintenance monitoring which are located on the 5, 6th subway line, they are analyzed that the stress of concrete lining and reinforced bar are converged gradually after 45 months. Therefore Monitoring of measurement and analysis frequency is conduct more often within about 4 years after the measuring instrument installation. Four years later, slowing the frequency of measurement is considered reasonable.

Use of large-scale shake table tests to assess the seismic response of a tunnel embedded in compacted sand

  • Zhou, Hao;Qin, Xiaoyang;Wang, Xinghua;Liang, Yan
    • Earthquakes and Structures
    • /
    • v.15 no.6
    • /
    • pp.655-665
    • /
    • 2018
  • Shield tunnels are widely used throughout the world. However, their seismic performance has not been well studied. This paper focuses on the seismic response of a large scale model tunnel in compacted sand. A 9.3 m long, 3.7 m wide and 2.5 m high rigid box was filled with sand so as to simulate the sandy soil surrounding the tunnel. The setup was excited on a large-scale shake table. The model tunnel used was a 1:8 scaled model with a cross-sectional diameter of 900 mm. The effective shock absorbing layer (SAL) on the seismic response of the model tunnel was also investigated. The thickness of the tunnel lining is 60 mm. The earthquake motion recorded from the Kobe earthquake waves was used. The ground motions were scaled to have the same peak accelerations. A total of three peak accelerations were considered (i.e., 0.1 g, 0.2 g and 0.4 g). During the tests, the strain, acceleration and soil pressure on the surface of the tunnel were measured. In order to investigate the effect of shock absorbing layer on the dynamic response of the sand- tunnel system, two tunnel models were set up, one with and one without the shock absorbing layer of foam board were used. The results shows the longitudinal direction acceleration of the model tunnel with a shock absorbing layer were lower than those of model tunnel without the shock absorbing layer, Which indicates that the shock absorbing layer has a beneficial effect on the acceleration reduction. In addition, the shock absorbing layer has influence on the hoop strain and earth pressure of the model tunnel, this the effect of shock absorbing layer to the model tunnel will be discussed in the paper.

Characteristics of Vibration of Track and Vehicle Body According to Type of Track in Tunnel of High-Speed Railway Lines (고속철도 터널에서의 궤도 형식에 따른 궤도와 차체의 진동 특성)

  • Kim, Man Cheol;Jang, Seung Yup
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1D
    • /
    • pp.125-132
    • /
    • 2006
  • In the present study, in order to elucidate the vibration characteristics of track and train body according to the type of track in tunnel, the vibration accelerations of the track and the KTX train body have been measured in tunnels of Kyong-Bu high-speed railway(HSR) lines, and the frequency analysis of the measured data has been performed. From this, the vibration characteristics of the track components such as rail, sleeper, ballast and slab, the tunnel lining and the vehicle body according to the type of track are investigated and their relation is analyzed. The test results show that the vibration of rail and vehicle body rapidly increases at 80Hz in tunnel, and that is much higher in the tunnel on which the concrete slab track is placed. According to the results of the present study, rail supporting stiffness can variate the vibration characteristics of the total system including the vehicle, and therefore the correlation between the vibration of vehicle should be taken into account to determine the supporting stiffness of the slab track.